amendment list, 15 September 2026
Amendment 001-082 - Pascal Canfin - Report A10-0202/2026 - Establishing the Temporary Decarbonisation Fund
Report A-10-2026-0202-AM-001-082
Full text
The Commission proposal COM(2025)0990 as published on EUR-Lex, with the 77 amendments of this document applied; 7 could not be placed.
736 paragraphs, 88 changed, 70 amendments applied, 8 not placed
Base text: COM(2025)0990 on EUR-Lex →
deleted: Struck-through words are taken out of the proposal, inserted: marked words put in; a rule in the margin marks a changed paragraph.
Jump to a change (70)
- Am 1 · recital 1
- Am 2 · recital 2
- Am 3 · recital 3
- Am 4 · recital 3 a (new)
- Am 5 · recital 3 b (new)
- Am 6 · recital 3 c (new)
- Am 7 · recital 4
- Am 8 · recital 5
- Am 9 · recital 5 a (new)
- Am 10 · recital 6
- Am 11 · recital 7
- Am 12 · recital 7 a (new)
- Am 13 · recital 8
- Am 14 · recital 9
- Am 15 · recital 10
- Am 16 · recital 10 a (new)
- Am 17 · recital 12
- Am 18 · recital 13 a (new)
- Am 19 · recital 13 b (new)
- Am 20 · recital 13 c (new)
- Am 21 · recital 13 d (new)
- Am 22 · recital 13 e (new)
- Am 23 · recital 14
- Am 24 · recital 14 a (new)
- Am 25 · recital 14 b (new)
- Am 26 · recital 15
- Am 27 · recital 16
- Am 28 · recital 17
- Am 31 · article 1 – paragraph 2
- Am 32 · article 2 – paragraph 1 – point b a (new)
- Am 33 · article 2 – paragraph 1 – point c
- Am 34 · article 3 – paragraph 3
- Am 35 · article 3 – paragraph 4
- Am 36 · article 4 – paragraph 3
- Am 42 · article 6 – paragraph 2
- Am 43 · article 6 – paragraph 2 a (new)
- Am 44 · article 6 – paragraph 2 b (new)
- Am 45 · article 6 – paragraph 3
- Am 46 · article 7 – paragraph 1 – introductory part
- Am 47 · article 7 – paragraph 1 – point c
- Am 48 · article 7 – paragraph 3
- Am 49 · article 7 – paragraph 3 a (new)
- Am 50 · article 7 – paragraph 3 b (new)
- Am 51 · article 7 – paragraph 3 c (new)
- Am 52 · article 8 – paragraph 1
- Am 53 · article 8 – paragraph 2 – point a
- Am 54 · article 8 – paragraph 2 – point a a (new)
- Am 55 · article 8 – paragraph 2 – point a b (new)
- Am 56 · article 8 – paragraph 2 – point b – point ii a (new)
- Am 57 · article 8 – paragraph 2 a (new)
- Am 58 · article 8 – paragraph 2 b (new)
- Am 59 · article 8 – paragraph 2 c (new)
- Am 60 · article 8 – paragraph 3 a (new)
- Am 61 · article 8 – paragraph 3 b (new)
- Am 62 · article 8 – paragraph 4
- Am 63 · article 8 – paragraph 5
- Am 64 · article 9 – paragraph 1
- Am 65 · article 9 – paragraph 1 a (new)
- Am 66 · article 9 – paragraph 1 b (new)
- Am 67 · article 9 – paragraph 1 c (new)
- Am 68 · article 10 – paragraph 1 – introductory part
- Am 69 · article 10 – paragraph 1 – point a
- Am 70 · article 10 – paragraph 1 – point b
- Am 71 · article 10 – paragraph 3
- Am 72 · article 10 – paragraph 4
- Am 73 · article 11 – paragraph 1
- Am 74 · article 11 – paragraph 2
- Am 75 · article 12 – paragraph 1
- Am 76 · article 12 – paragraph 2 – point a
- Am 77 · article 12 – paragraph 2 – point e
Explanatory memorandum 65 paragraphs
EXPLANATORY MEMORANDUM
CONTEXT OF THE PROPOSAL
Reasons for and objectives of the proposal
The European Green Deal sets out the objective of making the European Union climate-neutral by 2050. In 2025, the European Commission proposed a target of a 90% reduction in net greenhouse gas (GHG) emissions by 2040, compared to 1990 levels. This proposed target takes full account of the current economic, security and geopolitical landscape in alignment with the EU Competitiveness Compass3, and the Clean Industrial Deal4. It aims to provide the necessary predictability and stability for investments in the EU's clean energy transition and for driving industrial competitiveness.
Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a system for greenhouse gas emission allowance trading within the Union and amending Council Directive 96/61/EC (‘EU-ETS Directive’) continues to be a central instrument for reducing industrial greenhouse gas emissions through carbon pricing and the gradual reduction of the Union-wide emissions cap. Regulation (EU) 2023/956 establishing a Carbon Border Adjustment Mechanism (‘CBAM’) complements this framework by addressing the risk of carbon leakage related to imports of certain high-intensive goods into the Union.
As the phase-out of free allocation under the EU ETS progresses between 2026 and 2034, risks of carbon leakage may remain in certain cases and for certain goods. This remaining risk of carbon leakage could reduce the environmental effectiveness of Union climate policy if emissions decreases in the Union would lead to higher emission increase outside the Union.
This legislative proposal establishes a Union fund providing targeted financial support to energy-intensive industries exposed to a heightened remaining risk of carbon leakage. The Fund supports the transition of Union industry towards climate-neutral production processes, thereby reducing its exposure to carbon leakage, helping to maintain the environmental integrity of the EU ETS by ensuring that carbon pricing effectively delivers real emission reductions. Support granted by the Fund will be conditional on decarbonisation investments.
The Fund thereby contributes to the objectives of Article 191 TFEU, in particular the prevention of environmental damage and the promotion of measures at Union level to deal with cross-border environmental problems such as climate change.
Consistency with existing policy provisions in the policy area
The proposal complements the EU ETS and CBAM frameworks. It does not alter but complements the mechanisms established by those instruments by providing a transitional, targeted financial measure addressing certain risks pending the long-term solution which will be found in the proposal for a revision of the EU ETS in 2026. The proposal is limited in scope and time to prevent overlap with the proposal for revising the EU-ETS planned for 2026, and to ensure budgetary discipline.
It is also consistent with the objectives of other Union funds, such as the Innovation Fund and the Social Climate Fund, which support decarbonisation of production in the Union.
Consistency with other Union policies
Administrative requirements, including reporting requirements, play a key role in ensuring correct enforcement and proper monitoring of legislation. Generally, their costs are largely offset by the benefits they bring. However, reporting requirements can also impose disproportionate burdens on stakeholders, particularly affecting small and medium-sized enterprises and micro-companies.
The Commission set out a simplification agenda in several of its Communications in 2025 following the publication of the Draghi Report. The Commission has been delivering an unprecedented simplification effort to achieve the agreed policy objectives in the simplest, most targeted, most effective and least burdensome way.
The present proposal is consistent with the Union’s simplification agenda and the commitment to reduce unnecessary administrative burden for public authorities and beneficiaries. The governance and management structure of the Fund is designed to minimise duplication with existing Union instruments, notably the EU ETS, and to make full use of existing administrative capacities at Union and national level. It also streamlines procedures by relying on a single call for applications.
Finally, the proposal is designed to ensure the protection of the Union’s financial interests in accordance with Regulation (EU, Euratom) 2024/2509 (‘Financial Regulation’). The Commission, the European Anti-Fraud Office (OLAF), the European Court of Auditors (ECA), and, where applicable, the European Public Prosecutor’s Office (EPPO) will have the powers to exercise their respective investigative and prosecuting competences with regard to the use of the Fund’s resources.
LEGAL BASIS, SUBSIDIARITY AND PROPORTIONALITY
Legal basis
The proposal is based on Article 192(1) of the Treaty on the Functioning of the European Union (‘TFEU’) in the area of environment protection. In accordance with this Article, the Union contributes to the pursuit, inter alia, of the following objectives: preserving, protecting and improving the quality of the environment, promoting measures at international level to deal with regional or worldwide environmental problems, and in particular combating climate change. The proposal pursues these environmental objectives by promoting decarbonisation, preventing carbon leakage and thereby ensuring the environmental effectiveness of Union climate policy.
The proposal is also based on Article 322(1) TFEU, which provides the legal basis for the adoption of financial rules determining the procedure for establishing and implementing the Union budget and for the control of budgetary implementation. As the proposal lays down rules on the financing, management and control of a Union fund, the inclusion of Article 322(1) TFEU is appropriate.
Subsidiarity (for non-exclusive competence)
Action at Union level is necessary to address the abovementioned risks in a consistent manner across Member States. Measures at national level could lead to uncoordinated support across the Union, thus leading to distortions in the internal market and weakening the overall effectiveness of the EU ETS.
Proportionality
Given the cross-border nature of climate action and the need for a consistent Union response, the proposal is proportionate to the objective it pursues. It introduces a Union targeted, limited support mechanism designed solely to pursue the abovementioned objectives. It does not go beyond what is necessary to safeguard the environmental integrity of Union climate policy and to ensure that emission reductions achieved within the Union are not offset by increases in third countries. The scope is restricted to sectors covered by the CBAM Regulation. The support is conditioned upon projects demonstrating a clear contribution to industrial decarbonisation. The financial envelope is capped and tied to a limited budget in relation to CBAM revenues, ensuring budgetary discipline. The proposal also relies on existing administrative structures and monitoring arrangements, thereby keeping administrative burden to the minimum necessary for all parties (the Commission, Member States’ competent authorities and EU companies.
Choice of the instrument
A regulation is the most appropriate instrument to ensure uniform implementation of the support scheme across all Member States and prevent divergent national approaches that could undermine the coherent functioning of the EU ETS. A Regulation establishes directly applicable rules on eligibility, financing, governance and monitoring, thereby ensuring legal certainty for both Member States as beneficiaries and operators as final beneficiaires, while alternative instruments such as recommendations or directives would not provide the required level of harmonisation or timeliness.
In addition, the goals pursued by this proposal cannot be reached through the adoption of implementing measures in the absence of an appropriate legal base to act.
RESULTS OF EX-POST EVALUATIONS, STAKEHOLDER CONSULTATIONS AND IMPACT ASSESSMENTS
Ex-post evaluations/fitness checks of existing legislation
The proposal relies on the experience gained in implementing the EU ETS and CBAM instruments.
Stakeholder consultations
The Commission has consulted industry representatives on the plan for a support measure in advance of the proposal, including through a high-level dialogue. Through the consultation activities, the Commission informed stakeholders about the planned support measure, including plans for its overall design and reflections about the eligibility for support and the conditions that would need to be fulfilled to receive it.
Collection and use of expertise
The proposal has been elaborated following a process of internal scrutiny of existing provisions and instruments. It is based on experience in implementing the Union environmental legislation, in particular the EU ETS.
Impact assessment
This proposal is accompanied by an analytical document, the Commission Staff Working Document (SWD) accompanying the proposal. This analytical document describes how the eligibility for the proposed temporary decarbonisation investment support has been precisely targeted to production of goods with heightened level of remaining carbon leakage risks, in order to be proportionate and in order to avoid market distortions. In addition, the SWD analyses decarbonisation conditions that limit the administrative burden of the new measure, including by capitalising on already existing administrative infrastructure and data reported for the purpose of free allocation under the EU-ETS.
Regulatory fitness and simplification
As mentioned above, the proposal is fully aligned with the Commission’s simplification agenda. By avoiding unnecessary burden, the proposal reflects the temporary nature and limited scope of the support. It therefore contributes to more efficient implementation, increased legal clarity and reduced compliance costs, in line with the principles set out in the Interinstitutional Agreement on Better Law-Making and the Commission’s Better Regulation Guidelines.
The proposal is consistent with the objectives of the Commission’s Regulatory Fitness and Performance Programme (REFIT). It has been designed to minimise regulatory burden by using existing structures wherever possible, including those of the EU ETS. It does not create any new permanent administrative structures or bodies. The proposal therefore enhances regulatory coherence, strengthens environmental effectiveness, and limits administrative costs for public authorities and beneficiaries.
Fundamental rights
The proposal respects the fundamental rights and observes the principles recognised in particular by the Charter of Fundamental Rights of the Union. In particular, it contributes to the objective of a high level of environmental protection in accordance with the principle of sustainable development as laid down in Article 37 of the Charter.
BUDGETARY IMPLICATIONS
The Fund will be financed by contributions by Member States. Each contribution will correspond to 25% of the revenues that the Member State has collected from the sale of CBAM certificates to the authorised CBAM declarants established in its territory as from 1 February 2027. This matches the share which Member States will retain and is without prejudice to the Commission’s proposal to treat 75% of CBAM revenues as a new Own Resource of the Union budget. This arrangement is therefore compatible with the ongoing Own Resources legislative process.
The Fund will be implemented in direct management by the Commission in close cooperation with Member States. The resources from the Member States’ contributions will cover the costs of implementing the Fund. The impact of this proposal on the Union budget is assessed in the legislative financial and digital statement accompanying this proposal.
OTHER ELEMENTS
Implementation plans and monitoring, evaluation and reporting arrangements
The implementation of the Fund will be subject to monitoring to ensure that it delivers its intended environmental objectives and operates in accordance with the principles of sound financial management. The Commission will collect and analyse data provided by Member States and the beneficiaries on the applications and disbursement of funds per Member State, sector, goods and installations, as well as compliance with the requirements for decarbonisation measures. The Commission will adopt implementing acts laying down the rules on monitoring to ensure consistency across the Union. In line with the Financial Regulation and the Union’s better-regulation principles, monitoring results will feed into the evaluation of the Fund that the Commission will present to the EU Council and the European Parliament.
Explanatory documents (for directives)
Not applicable.
Detailed explanation of the specific provisions of the proposal
This section provides a concise overview of each of the main provisions of the proposal.
Article 1 establishes the Fund and specifies the period for which it will provide financial support.
Article 2 lays down the relevant definitions used in the Regulation for legal certainty and to ensure consistency.
Article 3 specifies that the Fund is to be financed by contributions from Member States, and that these contributions will correspond to 25% of CBAM revenues collected by Member States when they sell the CBAM certificates to authorised CBAM declarants pursuant to Article 20 of the CBAM Regulation. A haircut clause limits the use of revenues to the actual financing needs of the Fund.
Article 4 lays down the governance structure of the Fund. It provides that the Commission shall implement the Fund, ensuring consistent application across the Union. It also outlines the content and sets the deadline of the review of the Fund by the Commission.
Article 5 provides for the designation of the Member States’ authorities responsible in implementing the measure at national level.
Article 6 defines which goods are to benefit from support. It limits eligibility to the production of specific goods subject to heightened remaining risk of carbon leakage. It also sets out conditions under which Member States can request the production of further goods to be eligible for support.
Article 7 describes the types of decarbonisation activities that an eligible operator will need to carry out in order to receive support, such as investments in low-carbon technologies.
Articles 8 and 9 provide for the rules and procedures under which support will be granted. It also lays down the duties and rules to be applied by national competent authorities in the processing of applications, including how to calculate the support for each final beneficiary.
Article 10 and 11 provide for the duties and rules to be applied by the Commission in the review of information and calculations provided by national competent authorities, including on the decision to disburse support.
Article 12 ensures that the Fund is subject to the safeguards laid down in the Financial Regulation. It confirms the competences of the Commission, OLAF, the Court of Auditors and, where applicable, the EPPO to conduct audits, investigations and prosecutions.
Article 13 provides for the rules to be applied by beneficiaries of the support.
Article 14 empowers the Commission to adopt delegated acts to supplement or amend non-essential elements of the Regulation, notably regarding detailed eligibility rules, technical methodologies, and monitoring and verification requirements, in accordance with Article 290 TFEU.
Article 15 empowers the Commission to adopt implementing acts pursuant to Regulation (EU) No 182/2011. These acts will define detailed rules on implementation and governance of the Fund, evaluation, monitoring, reporting, and control.
Article 16 sets out the date of entry into force and the time of application of the provisions.
Proposal for a regulation of the European Parliament and of the Council
Establishing the Temporary Decarbonisation Fund
(Text with EEA relevance)
THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on the Functioning of the European Union, and in particular Article 192(1) and Article 322(1), point (a), thereof,
Having regard to the proposal from the European Commission,
After transmission of the draft legislative act to the national parliaments,
Having regard to the opinion of the European Economic and Social Committee,
Having regard to the opinion of the Committee of the Regions,
Having regard to the opinion of the Court of Auditors,
Acting in accordance with the ordinary legislative procedure,
Whereas:
(1)inserted: (1) The Union is committed to achieving climate neutrality by 2050 inserted: at the latest and inserted: negative emissions thereafter, which includes the objectives of reducing net greenhouse gas emissions by at least 55% by 2030, inserted: and 90% by 2040, in line with the European Green deleted: Dealinserted: Deal4 and the European Climate deleted: Law.inserted: Law5. The Clean Industrial Deal, as set out in the Commission Communication of 26 February deleted: 2025,inserted: 20256, underscores the need to align industrial competitiveness with climate ambition, ensuring that the transition to a climate-neutral economy is both just and economically deleted: resilient.inserted: resilient, while also maintaining the competitiveness of industrial sectors and averting the risk of carbon leakage.
(2)inserted: (2) The Union’s environmental objectives, as set out in Article 191 of the Treaty, include preserving and improving the quality of the environment and promoting measures at international level to address global environmental challenges. They are pursued among other things through carbon pricing instruments, such as the Union’s Emission Trading System (‘EU-ETS’) established by Directive deleted: 2003/87/EC.inserted: 2003/87/EC7. Where the Union’s international partners have policy approaches that are significantly below the level of the Union’s climate ambition, production in third countries is not subject to comparable carbon constraints. This asymmetry risks incentivising the relocation of production of carbon-intensive goods – a phenomenon known as carbon leakage – which would undermine the attainment of the emission-reduction objectives of Directive 2003/87/EC. Such relocation may ultimately lead to an overall increase in global greenhouse gas emissions, thereby compromising the environmental integrity and effectiveness of the Union climate policy.inserted: To address that risk, the Union-wide emissions cap has been reduced in a gradual way with some sectors still receiving up to 100% of the allowances for free. Moreover, allowance price spikes have been prevented through the Market Stability Reserve. Instruments, such as indirect cost compensation under the EU ETS and the EU Innovation and Modernisation Funds, have also contributed to alleviating the EU ETS impact on production costs and to stimulating investments in decarbonisation. Recently amended Union State aid rules have made the conditions for national support for industrial decarbonisation less stringent and more flexible. The Union multiannual financial framework (MFF) 2028-2034 proposal aims at consolidating and increasing support to Union’s industrial decarbonisation through, inter alia, a new European Competitiveness Fund.
(3)inserted: (3) The Clean Industrial Deal emphasises the need for financial support, regulatory predictability, and innovation to enable energy-intensive industries to decarbonise without compromising their competitiveness, particularly in sectors exposed to the risk of carbon deleted: leakage.inserted: leakage, inserted: including those that produce strategic inputs essential for food security, such as fertilisers. The prevention of carbon leakage constitutes an environmental objective directly linked to the effectiveness of emission-reduction instruments on which Union climate policy relies. Targeted financial support inserted: based on clear conditionality and eligibility criteria, can help ensure that emission reductions are achieved within the Union through decarbonisation of industrial activity, rather than the relocation to jurisdictions with lower environmental requirements giving rise to a risk of carbon leakage.
(3a)inserted: Even though Regulation (EU) 2023/956 includes a mechanism to prevent carbon leakage, it does not contain a permanent solution for export-oriented products or for residual carbon leakage across the wider value chain. This justifies the establishment of a transitional Fund for operators and downstream operators to mitigate costs incurred and to support them in investing in decarbonisation throughout their processes.
(3b)inserted: While this Regulation provides targeted support to achieve decarbonisation, to address the remaining risk of carbon leakage and to preserve the competitiveness of the Union industry, small and medium-sized enterprises not currently engaged in export activities could face structural barriers to accessing international markets, other than carbon price differences. The Commission should assess the presence of those structural market access barriers and the need for additional support mechanisms aimed at facilitating market access and enhancing the competitiveness of such undertakings.
(3c)inserted: In small and peripheral economies, and in Member States with a high share of trade in goods covered by Regulation (EU) 2023/956, operators and downstream operators face a particularly acute remaining risk of carbon leakage on export markets outside the Union, due to higher logistics costs and limited economies of scale.
(4)inserted: (4) Energy-intensive industries covered by Directive 2003/87/EC progressively internalise the cost of their greenhouse gas emissions. The reduced Union-wide emissions cap, combined with the gradual phase-out of free allocation provided for in that Directive, requires cost-intensive and rapid adaptations by the industries covered by Directive 2003/87/EC, thereby increasing the short-term risk of carbon deleted: leakage.inserted: leakage inserted: such as in sectors that have not yet achieved a transformation of their production processes or transition to low-carbon technologies. That remaining risk of carbon leakage is not fully prevented by Regulation (EU) 2023/956 of the European Parliament and of the deleted: Councilinserted: Council8 and should therefore be addressed through additional measures inserted: that are verifiable supporting the transition and promoting the decarbonisation of industrial sectors.inserted: In sectors such as fertilisers, that remaining risk could also have a direct impact on agricultural production costs, which could have consequences on Union food security.
(5)inserted: (5) To deleted: incentiviseinserted: complement deleted: industrialinserted: the deleted: decarbonisationinserted: already deleted: action,inserted: existing deleted: itinserted: incentives deleted: isinserted: for deleted: appropriateinserted: industrial deleted: toinserted: decarbonisation, deleted: establishinserted: this deleted: ainserted: Regulation inserted: establishes an additional Union funding deleted: instrument,inserted: instrument. deleted: theinserted: The Temporary Decarbonisation Fund (the ‘Fund’), deleted: providinginserted: will inserted: provide temporary financial support to operators in carbon intensive sectors that are subject to the remaining risk of carbon leakage, deleted: ensuringinserted: due deleted: thatinserted: to inserted: their production for export to third countries. The Fund will support further decarbonisation efforts deleted: withininserted: and inserted: thereby contribute to the deleted: Unioninserted: global deleted: areinserted: competitiveness deleted: preservedinserted: of deleted: andinserted: European deleted: thatinserted: industry deleted: emissionsinserted: and deleted: reductioninserted: the deleted: incentivesinserted: Union's deleted: remaininserted: strategic deleted: effective.inserted: production. Such support should be strictly limited to what is necessary to mitigate that remaining risk of carbon leakage, be proportionate, and be conditional upon inserted: further demonstrable deleted: progressinserted: greenhouse deleted: ininserted: gas deleted: reducinginserted: emissions deleted: greenhouseinserted: reductions. deleted: gasinserted: The deleted: emissions.inserted: Fund is an environmental measure and is compatible with the exemption provided for under Article XX of the GATT.
(5a)inserted: The Fund should aim to ensure that support is directed towards genuine decarbonisation transformation. Direct support under the Fund should be subject to clear conditionality with appropriate decarbonisation such as through climate-neutrality plans that prioritise genuine transformation and social criteria.
(6)inserted: (6) Revenues generated from the sales of CBAM certificates pursuant to Regulation (EU) 2023/956 will be collected by Member States. As part of its proposal for a new Own Resources deleted: Decision,inserted: Decision9, the Commission has proposed for the next Multiannual Financial Framework 2028-2034 that 75% of the revenue from the sale of CBAM certificates should accrue to the EU budget as an own deleted: resource.inserted: resource10. In order to ensure the necessary funding, the Fund should be financed from the remaining 25% of the revenues from the sale of certificates, which should constitute external assigned revenue for the purpose of covering the commitments to pay financial support to final beneficiaries of the Fund, and the Commission’s administrative costs to be incurred in managing the Fund. It is necessary to provide for a derogation from Article 21(5) of Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the deleted: Councilinserted: Council11 to allocate to the Fund the appropriate share of the revenue generated from the sale of CBAM certificates pursuant to Regulation (EU) 2023/956 as external assigned deleted: revenue.inserted: revenue, while ensuring that the use of such revenue directly contributes to supporting industrial decarbonisation and thereby maintaining the competitiveness of exposed sectors, with a view to preventing the relocation of production and strengthening the Union’s strategic autonomy.
(7)inserted: (7) The Fund’s resources should only be used to cover the commitments to pay financial support to the final beneficiaries and the administrative costs of the Fund. Any unused revenue deleted: shouldinserted: could be deleted: returned to the Member States in proportion to their contribution to the Fund. For this purpose,inserted: reallocated deleted: itinserted: as deleted: isinserted: additional deleted: necessaryinserted: contributions to deleted: provide forinserted: international deleted: ainserted: climate deleted: derogationinserted: finance deleted: frominserted: under Article deleted: 12(4), point (c),inserted: 9 of deleted: Regulation (EU,inserted: the deleted: Euratom)inserted: Paris deleted: 2024/2509.inserted: Agreement.
(7a)inserted: The Union is committed to working with and supporting low and middle-income third countries for the reduction of their greenhouse gas emissions, including through the decarbonisation and transformation of their industries, and for their adaptation to climate change. The Commission needs to continue to engage with lower-middle income third countries to support their compliance with CBAM. In accordance with Article 30(6) and (8) of Regulation (EU) 2023/956, the Commission is to periodically assess, report on, and, where appropriate, propose new measures in relation to the CBAM impact on least developed countries and its contribution to the decarbonisation of the manufacturing industry in those countries, as well as to consider allocating unused revenues under the Fund as additional contributions to international climate finance under Article 9 of the Paris Agreement.
(8)inserted: (8) The Fund should provide financial support in the years inserted: 2027, 2028 and 2029 to the final beneficiaries to address their exposure to the remaining risk of carbon leakage, determinable based on the two-year inserted: export production reference period 2026–2027. Given the need to ensure continuity of decarbonisation efforts and address the remaining risks of carbon leakage and the fact that CBAM revenue will only become available in 2028, it is appropriate to allow support under this Regulation to cover actions before the entry into force of this Regulation, in accordance with Article 3(2) of Regulation 2024/2509. Such retroactive eligibility is strictly limited to actions that contribute to the environmental objectives of this deleted: Regulation.inserted: Regulation and which are undertaken from 1 January 2026 onwards.
(9)inserted: (9) By limiting the initial support period to deleted: twoinserted: three years, the Fund should provide short-term support pending a comprehensive review of how best to address the issue of the remaining risk of carbon leakage from 2028 onwards, in the context of the scheduled review of the EU ETS. The transitory character of the Fund precludes any interpretation that it may constitute a precedent, a model or a reference point for the EU ETS review. Accordingly, the existence, operation or cessation of the Fund shall not create any expectation, legal or otherwise, regarding the EU ETS review.inserted: The design and implementation of the Fund should not pre-empt the outcome of the scheduled review of Directive 2003/87/EC and the consideration of a permanent export solution under that framework, and needs to remain consistent with the long-term architecture of the Union's carbon-pricing system.
(10)deleted: Giveninserted: (10) inserted: In view of the temporary nature of the deleted: Fund,inserted: fund, its governance should be cost-efficient and deleted: minimise to the extentinserted: -effective deleted: possibleinserted: and deleted: theinserted: minimise administrative deleted: burdeninserted: burdens, for both the final beneficiaries of the financial support and the Member deleted: States’ competent authorities. Therefore, a single call for applications in 2028 for the production reference period 2026-2027 should be provided for.inserted: States.
(10a)inserted: To allow for early compensation of the beneficiaries’ exposure to the remaining risk of carbon leakage, a call for applications in 2027 should be provided for by the Commission. Beneficiaries should be able to choose to submit a single application in 2028 for the export production reference period 2026-2027 or to submit two separate applications, one in 2027 for the export production reference period 2026, and another in 2028 for the export production reference period 2027.
(11)In order to enable a streamlined and efficient procedure, the Fund should be implemented in direct management mode by the Commission, in close cooperation with the Member States, in accordance with Regulation (EU, Euratom) 2020/2092 of the European Parliament and of the Council. This approach should leverage the established relationships between Member States and operators, taking into account local specificities and existing arrangements, to ensure both the timely assessment of applications and the efficient payment of financial support to the final beneficiaries. Moreover, the application deadline as well as documents to be submitted should be aligned with the obligations that operators receiving free allocation already have under Articles 22a and 22b of Commission Delegated Regulation (EU) 2019/331 and Articles 3 and 3d of Commission Implementing Regulation (EU) 2019/1842.
(12)inserted: (12) The Fund should in particular contribute to the decarbonisation objective by providing inserted: conditional support to operators of EU-ETS installations which produce goods exposed to the highest remaining risk of carbon leakage in the short deleted: term.inserted: term inserted: and downstream operators which produce such goods. Those goods should be selected taking into account both their emissions and carbon leakage exposure, using the approach followed to determine the carbon leakage list for the EU-ETS as a starting point and targeting the measure to those goods which remain most at risk of carbon leakage based on an objective indicator.
(13)The risk exposure of goods with a low ratio of value to weight might differ significantly between Member States. To account for the specific characteristics of goods with a low ratio of value to weight with regards to the remaining risk of carbon leakage, an opt-in mechanism should be established. While the goods set out in the Annex demonstrate a particularly high Union-wide exposure, this opt-in mechanism should consider national circumstances. There should be an opt-in mechanism to allow Member States to subject certain Combined Nomenclature codes (‘CN codes’) in accordance with Council Regulation (EEC) No 2658/87 to the proposed measure provided that they can demonstrate that the selection criteria that were used for defining the goods set out in the Annex to this Regulation are met at the national level.
(13a)inserted: The risk exposure of some goods using products, including agri-food products, covered by Regulation (EU) 2023/956, in particular fertilisers, should also be included in the Fund insofar as some of those products could, in the short term, experience a significant cost increase, as a result of higher prices of imports of intrants and precursors. The Commission should therefore include, if appropriate, specific indicators related to fertiliser-use efficiency and energy-use intensity. The Fund should also include operators of installations directly covered by the EU ETS and their downstream operators and should be able to provide targeted support, limited to the additional carbon related cost.
(13b)inserted: The selection criteria used to determine the scope of covered agri-food products are based on the direct and indirect costs of the implementation of Regulation (EU) 2023/956 and Directive 2003/87/EC on those product costs, expressed as a proportion of the gross value added, and the sector’s trade intensity with third countries.
(13c)inserted: Downstream operators and installations significantly and demonstrably affected by the combined impact of the phase-out of free allocation under Directive 2003/87/EC and the application of Regulation (EU) 2023/956 on the cost of CBAM-covered inputs, and where they are substantially exposed to international competition on export markets, should be able to receive targeted support under the Fund, with clear eligibility criteria and appropriate decarbonisation conditionalities. However, it is possible that downstream operators do not need to fulfil the same conditionality requirements as operators. Therefore, the Commission should impose less onerous commitments on downstream operators than on operators.
(13d)inserted: Operators of EU ETS installations producing cement clinkers and cement are subject to the phase-out of free allocation under Directive 2003/87/EC and face a remaining risk of carbon leakage on export markets that is not fully addressed by Regulation (EU) 2023/956. The inclusion of cement clinkers and cement products in the scope of the Fund is consistent with the scope of Annex I to Regulation (EU) 2023/956 and with the objective of maintaining the export competitiveness of Union cement producers, including those established in island and peripheral Member States where cement production represents a significant share of industrial output.
(13e)inserted: The financial architecture of the Fund needs to remain dynamic and capable of adapting to market developments. Therefore, the Commission should assess the feasibility and possible impact of an EU ETS secondary market transaction fee in its interim report. If the assessment demonstrates that such a transaction fee will successfully reinforce market stability and strengthen the Fund’s resources, without hindering the daily compliance of EU ETS sectors, the Commission should consider introducing such a transaction fee by 31 December 2028.
(14)inserted: (14) Support should be subject to objective, non-discriminatory and pre-established conditions which need to be verified. To ensure that the effect of the financial support deleted: is to deleted: incentiviseinserted: operators deleted: theinserted: is inserted: a demonstrable reduction of greenhouse gas emissions, deleted: that support should be deleted: subject toinserted: primarily deleted: objective,inserted: provided deleted: non-discriminatoryinserted: to deleted: andinserted: new deleted: pre-establishedinserted: decarbonisation deleted: conditions.inserted: investments. To reduce administrative burden, the conditions should build on the existing administrative framework established for free allocation under the EU-ETS. To align the conditions with the existing procedure of application for free allocation, financial support inserted: to operators should be contingent on the demonstration of the implementation of recommendations included in energy audits or equivalent measures deleted: orinserted: and a legal commitment made for investments to achieve the inserted: 2030 targets and milestones referred to in a climate neutrality deleted: plan.inserted: plan, deleted: Toinserted: or deleted: enableinserted: a deleted: theinserted: transition deleted: mostinserted: plan deleted: effectiveinserted: for deleted: andinserted: climate deleted: cost-efficientinserted: change deleted: emissioninserted: mitigation deleted: reductions,inserted: as deleted: beneficiariesinserted: laid inserted: down in Commission Delegated Regulation (EU) 2023/27721a. Financial support should deleted: haveinserted: be inserted: used by the deleted: choiceinserted: beneficiaries inserted: in particular to deleted: investinserted: finance deleted: theirinserted: investments deleted: supportinserted: delivering inserted: the minimum decarbonisation or energy efficiency effects referred to in deleted: projectsinserted: section inserted: 5 of the Clean Industrial Deal State Aid Framework (CISAF). Beneficiaries should retain the flexibility to select the decarbonisation measures that inserted: are most deleted: appropriatelyinserted: effective deleted: suitinserted: in their deleted: individualinserted: specific deleted: situation.inserted: circumstances, provided they comply with the conditionality requirements of the Fund.
inserted: 1a Commission Delegated Regulation (EU) 2023/2772 of 31 July 2023 supplementing Directive 2013/34/EU of the European Parliament and of the Council as regards sustainability reporting standards (OJ L, 2023/2772, 22.12.2023, ELI: http://data.europa.eu/eli/reg_del/2023/2772/oj).
(14a)inserted: To ensure the protection of Union’s interests and the strengthening of the Union’s economy, beneficiaries should not transfer the financed technology and the facility concerned outside of the Union’s territory, and some of the equipment used as part of the co-financed investments should be sourced from within the Union’s territory. This should not however preclude operators and downstream operators in Ireland from purchasing equipment, supplies, materials or components from suppliers established in Northern Ireland, in recognition of the all-island dimension of Ireland's economy.
(14b)inserted: In order to safeguard social rights, beneficiaries of the Fund should respect relevant labour law and applicable collective agreements.
(15)inserted: (15) Following the submission of applications, the methodology for calculating the financial support by the deleted: competent authorities designated by the Member Statesinserted: Commission should be laid down. That calculation should take into account the annual average of the closing prices of EU-ETS allowances on the auction platform for the years 2026 and 2027 as those years are the reference years for which the support is awarded and better reflect the cost of addressing the remaining risk of carbon leakage. deleted: Followinginserted: The inserted: calculation should also consider the deleted: calculations,inserted: level inserted: of the deleted: competentinserted: carbon deleted: authoritiesinserted: price deleted: shouldinserted: in deleted: provideinserted: the inserted: export market or the inserted: absence thereof, which has an impact on the carbon leakage risk. Following the calculations, the Commission deleted: withinserted: should inserted: establish and make publicly available a list identifying all beneficiaries and their respective calculated financial support.
(16)deleted: Once it has verified the calculations provided byinserted: (16) deleted: theinserted: The deleted: nationalinserted: Commission deleted: competentinserted: should, deleted: authorities,inserted: based deleted: theinserted: on deleted: Commissioninserted: its deleted: shouldinserted: calculations, deleted: takeinserted: publish a decision setting out the amount allocated to each Member State specifying the amounts payable to each final beneficiary in the Member State. That decision should constitute a legal commitment in relation to the final beneficiaries within the meaning of Regulation (EU, Euratom) 2024/2590 of the European Parliament and of the deleted: Council.inserted: Council16. The Commission should inserted: thereafter, in a timely manner, disburse to the national competent authorities the amount allocated to each Member State, corresponding to the financial support given to final beneficiaries in that Member State. The competent authorities should then timely disburse the support to their respective final beneficiaries.
(17)inserted: (17) To ensure the prevention, detection and tackling of fraud, corruption, conflicts of interest and other irregularities affecting the Union’s financial interests, inserted: and objectives of this Regulation, the Commission, the European Court of Auditors and the European Anti-Fraud Office (OLAF) should have the powers conferred on them by Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the deleted: Councilinserted: Council17 and Regulation (EU, Euratom) 2024/2509 to carry out audits and investigations concerning the use of Union funds under this deleted: Regulation.inserted: Regulation, inserted: including through risk-based controls and the use of digital tools for data-matching with EU ETS and CBAM registries. For the Member States participating in the enhanced cooperation in accordance with Council Regulation (EU) deleted: 2017/1939,inserted: 2017/193918, the European Public Prosecutor’s Office (EPPO) should investigate and prosecute offences against the Union’s financial interests.inserted: The Commission, supported by the relevant Member State authorities, should verify that the final beneficiaries have used the financial support to carry out the investments in compliance with the conditions set out in this Regulation and should take legal action to recover the funds in case of non-compliance.
(18)In order to supplement non-essential elements of this Regulation, the power to adopt acts in accordance with Article 290 of the Treaty should be delegated to the Commission to lay down rules in respect of the calculation and collection of each Member State’s contribution to the resources assigned to the Fund, the implementation of the Fund, including reporting and monitoring requirements, and the conditions of eligibility of the goods which have a low ratio of value to weight and are subject to a heightened remaining risk of carbon leakage at national level. It is of particular importance that the Commission carry out appropriate consultations during its preparatory work, including at expert level, and that those consultations be conducted in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making. In particular, to ensure equal participation in the preparation of delegated acts, the European Parliament and the Council receive all documents at the same time as Member States’ experts, and their experts systematically have access to meetings of Commission expert groups dealing with the preparation of delegated acts.
(19)In order to ensure uniform conditions for the implementation of this Regulation, implementing powers should be conferred on the Commission to lay down rules as regards the procedural requirements and the evidence to be submitted by applicants, the application procedure and the responsibilities and monitoring and reporting obligations of the final beneficiaries.
(20)The powers concerning the procedural requirements and the evidence to be submitted by applicants, the application procedure and the responsibilities and monitoring obligations of the final beneficiaries should be exercised in accordance with Regulation (EU) No 182/2011 of the European Parliament and of the Council. The examination procedure should be used for the adoption of those implementing acts.
(21)Since the objectives of this Regulation to address remaining carbon leakage risks cannot be sufficiently achieved by the Member States in a consistent manner but can be better achieved at Union level to avoid uncoordinated support across the Union, and thereby distortions in the internal market and a weakening the overall effectiveness of the EU ETS, the Union may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty on European Union. In accordance with the principle of proportionality as set out in that Article, this Regulation does not go beyond what is necessary in order to achieve those objectives.
HAVE ADOPTED THIS REGULATION:
Article 1
Subject matter
1.This Regulation establishes the Temporary Decarbonisation Fund (the ‘Fund’) and lays down its governance, the financial rules for its implementation, its resources, and the scope of its support.
2.inserted: 2. The Fund shall provide financial support in the period deleted: 2028-2029inserted: 2027-2029 to address the remaining risk of carbon leakage associated with carbon intensive goods produced inserted: and exported by eligible operators of installations inserted: and eligible downstream operators in the period 2026-2027.
Article 2
Definitions
For the purposes of this Regulation, the following definitions shall apply:
(a)‘installation’ means an installation as defined in Article 3, point (e), of Directive 2003/87/EC;
(b)‘operator’ means any person as defined in Article 3, point (f), of Directive 2003/87/EC carrying out one or more activities listed in Annex I to the same Directive and producing goods as referred to in Annex I to Regulation (EU) 2023/956;
(ba)inserted: ‘downstream operator’ means any legal or natural person established in a Member State that uses goods listed in Annex I to Regulation (EU) 2023/956 as primary material inputs in its production processes to produce eligible goods;
(c)inserted: (c) ‘eligible good’ means any of the goods listed in the Annex;inserted: as well as any goods subject to a heightened remaining risk of carbon leakage identified pursuant to Article 6(2) and (3);
(d)‘competent authority’ means the authority designated by a Member State in accordance with Article 18 of Directive 2003/87/EC;
(e)‘final beneficiary’ means an operator receiving financial support under this Regulation.
Article 3
Resources of the Fund
1.The Fund shall be financed by contributions from Member States.
2.Those contributions shall correspond to 25% of the revenues that each Member State has collected from the sale of CBAM certificates pursuant to Article 20 of Regulation (EU) 2023/956 in relation to embedded emissions declared for 2026 and 2027.
3.inserted: 3. Each Member State shall communicate to the Commission the exact annual amounts to contribute to the Fund for the deleted: yearsinserted: year 2026 deleted: andinserted: by inserted: 31 July 2027 deleted: respectivelyinserted: and deleted: byinserted: for deleted: 31inserted: the deleted: Decemberinserted: year 2027 deleted: andinserted: by 31 deleted: Decemberinserted: July deleted: 2028.inserted: 2028, inserted: respectively. Member States shall transfer to the Fund a monetary amount that corresponds to the amount referred to in paragraph 2 of this Article respectively by deleted: 31inserted: 30 deleted: Marchinserted: September deleted: 2028inserted: 2027 inserted: for the revenues of the year 2026 and deleted: 31inserted: by deleted: Marchinserted: 30 deleted: 2029.inserted: September inserted: 2028 for the revenues of the year 2027. The amounts contributed shall be assigned revenue to the Fund in accordance with Article 21(5) of Regulation (EU, Euratom) 2024/2509. By way of derogation from that provision, the amounts contributed shall constitute external assigned revenue.
4.inserted: 4. Revenues remaining after the full disbursement of funding to final beneficiaries and payment of administrative costs of the Fund shall not be automatically carried over to be used by the Fund. By inserted: way of derogation from Article 12(4), point (c), of Regulation (EU, Euratom) 2024/2509, the Commission deleted: shall returninserted: may deleted: theinserted: use deleted: excessinserted: those revenues deleted: toinserted: for the deleted: Memberinserted: purpose deleted: Statesinserted: of deleted: ininserted: the deleted: proportioninserted: Union’s deleted: toinserted: international deleted: theirinserted: climate deleted: financialinserted: finance deleted: contributioninserted: commitments, deleted: toinserted: in inserted: particular under Article 9 of the deleted: Fund.inserted: Paris Agreement;
5.The administrative costs incurred by the Commission for the implementation of the Fund shall be covered by the resources mentioned in paragraph 1.
6.The Commission is empowered to adopt delegated acts in accordance with Article 14 to supplement this Regulation by laying down the provisions and arrangements necessary for the calculation and collection of each Member State’s contribution to the resources assigned to the Fund in accordance with this Article, including any relevant reporting requirements.
Article 4
Implementation of the Fund
1.The Fund shall be implemented by the Commission under direct management within the meaning of Article 62(1), first subparagraph, point (a), of Regulation (EU, Euratom) 2024/2509, and in accordance with the other relevant rules adopted pursuant to Article 322 TFEU, including Regulation (EU, Euratom) 2020/2092.
2.The Commission is empowered to adopt delegated acts in accordance with Article 14 to supplement this Regulation by laying down the provisions and arrangements concerning the implementation of the Fund, including the reporting and monitoring requirements.
3.deleted: By 31 December 2030, the Commission shall present a report to the European Parliament and the Council on the expenditure financed by the Fund. This report shall contain at least a detailed breakdown of funds disbursed by the Fund and applications per Member State, sector, goods and installations, and an evaluation of the Fund.inserted: deleted.
Article 5
Competent authorities
Each Member State shall designate the competent authority to carry out the functions and duties under this Regulation and inform the Commission thereof.
The Commission shall make a list of all competent authorities available to the public.
Article 6
Eligibility
1.The operator of an installation producing goods as listed in the Annex, which goods fall under the Combined Nomenclature (‘CN’) codes in Regulation (EEC) No 2658/87, shall be eligible to receive financial support in accordance with Article 9 and subject to the conditions set out in Article 7.
2.inserted: 2. The operator of an installation producing goods not listed in the Annex, inserted: or downstream operator producing such goods, which have a low ratio of value to weight and are subject to a heightened remaining risk of carbon leakage at national level as defined in the delegated act adopted in accordance with paragraph 3, shall, upon decision of the Commission following a reasoned request of a Member State, be eligible to receive financial support in accordance with Article 9 and be subject to the conditions set out in Article 7.
2a.inserted: A downstream operator that produces eligible goods listed in the Annex to this Regulation, which fall under the Combined Nomenclature (CN) codes set out in Regulation (EEC) No 2658/87, shall be eligible to receive financial support pursuant to Article 9 of this Regulation and subject to the conditions set out in Article 7 of this Regulation, provided that it demonstrates the following:
(a)inserted: the downstream operator has incurred significant additional carbon-related costs passed through from operators under Directive 2003/87/EC or Regulation (EU) 2023/956 in respect of such goods; and
(b)inserted: a substantial proportion of the downstream operator’s output of those goods is exported to third-country markets or supplied to exporters of such goods.
2b.inserted: An operator and a downstream operator that produces eligible goods listed in the Annex, shall not be eligible to receive financial support pursuant to Article 9 when:
(a)inserted: the operator or downstream operator concerned, following verification by the relevant national competent authority, or respectively, the Commission, is in breach of relevant working and employment conditions and employer obligations resulting from Union or national labour laws, or applicable collective agreements according to national rules and practices; or
(b)inserted: the operator and downstream operator concerned, or the parent company, are not established in jurisdictions listed in the Union list of non-cooperative jurisdictions for tax purposes.
3.inserted: 3. The Commission is empowered to adopt delegated acts in accordance with Article 14 to supplement this Regulation by establishing deleted: aninserted: the deleted: indicatorinserted: indicators determining the heightened remaining risk of carbon leakage provided for in paragraph 2 and a list of goods determined on the basis of that indicator, inserted: including downstream goods not listed in Annex I to Regulation (EU) 2023/956, the conditions that the deleted: operatorsinserted: producers inserted: of such goods need to fulfil to receive financial support, in addition to the ones set out in Article deleted: 7, and the procedure to make the request referred to in the first subparagraph.inserted: 7.
Article 7
Conditionality
1.inserted: 1. Where an operator is subject to the obligation to conduct an energy audit as a stand-alone energy audit or within the framework of a certified Energy Management System or Environmental Management System, the operator shall receive financial support from the Fund provided that the operator demonstrates to the satisfaction of the deleted: competent authorityinserted: Commission that one of the following conditions is fulfilled:
(a)all recommendations under Article 11 of Directive 2023/1791/EC of the European Parliament and of the Council have been implemented;
(b)the pay-back time for any remaining relevant investments exceeds five years;
(c)inserted: (c) the cost of implementing the recommendations referred to in (a) is disproportionate and the operator demonstrates a legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 for investments implementing other measures which will lead to inserted: verifiable greenhouse gas emission reductions equivalent to those recommended by the audit report or by the certified Energy Management System for the installation concerned.
2.The conditions set out in paragraph 1, points (a), (b) and (c), shall apply also to operators that are not subject to the obligation to conduct an energy audit provided that their energy audit is compliant with the minimum criteria set out in Annex VI to Directive (EU) 2023/1791.
3.inserted: 3. Alternatively to paragraphs 1 and 2, an operator shall receive financial support from the Fund provided that the operator demonstrates inserted: to the satisfaction of the Commission, that it has made a legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 made for investments to achieve the targets and milestones referred to in a climate neutrality plan and which is at least equivalent to the support amount applied for under this Regulation.
3a.inserted: A downstream operator shall receive financial support from the Fund provided that the downstream operator demonstrates to the satisfaction of the Commission that it has undertaken actions leading to a verifiable and significant reduction in the use of the goods listed in Annexes I and II, or investments that lead to a lower-carbon method in their relevant production processes to use those goods or investments in their relevant supply chains leading to the use by that operator of lower-carbon versions of those goods.
3b.inserted: Operators and downstream operators shall receive financial support from the Fund provided that they demonstrate to the satisfaction of the Commission that:
(a)inserted: they have a legal commitment to use or source, where available, half of their equipment, supplies and materials, or their components, from the Union’s territory, for investments supported by the Fund;
(b)inserted: they do not to use the financial support of the Fund for dividend payouts, in excess of expected returns, share buybacks or executive bonuses over the period of 2026-2027.
3c.inserted: The Commission shall, by means of implementing acts, determine standardised indicators and templates for operators and downstream operators to demonstrate compliance with the conditionality requirements set out in Article 7, including, inter alia, indicators relevant for downstream operators at the level of input reduction and use of lower carbon footprint material. This shall include simplified indicators and templates proportionate to small- and medium sized enterprises and shall take into account the specific case of Ireland and Northern Ireland.
Article 8
Application for support, processing of applications and competent authority assessments
1.inserted: 1. The operator of an installation producing goods that are eligible for financial support deleted: may submitinserted: or deleted: aninserted: downstream deleted: applicationinserted: operator deleted: forinserted: producing such deleted: support from the Fund by 31 March 2028. That application shallinserted: goods, deleted: beinserted: may deleted: submittedinserted: submit to the deleted: competent authority of the Member State where the operator of the installation is established and cover the two years of application of the Fund.inserted: Commission:
(a)inserted: a single application by 31 March 2028 that covers the production reference period 2026-2027; or
(b)inserted: an application by 31 March 2027 that covers the production reference period 2026 and a supplementary application by 31 March 2028 that covers the production reference period 2027.
2.An application submitted pursuant to paragraph 1 shall be accompanied by the following specific elements:
(a)inserted: (a) for all operators, a production inserted: and export data report complementing the verified activity level reports for deleted: 2026inserted: the deleted: andinserted: relevant deleted: 2027inserted: production inserted: reference period covered by the application submitted pursuant to inserted: paragraph 1 of this Article inserted: submitted pursuant to Article 3 of Implementing Regulation (EU) 2019/1842, providing the necessary production data inserted: and data on the share of production sold in third countries, broken down by country of export, to verify the eligibility for financial support;
(aa)inserted: for all operators, if applicable, a tax transparency report and an ownership structure disclosure providing evidence that the operator and its parent company are not established in jurisdictions listed in the Union list of non-cooperative jurisdictions for tax purposes;
(ab)inserted: for all operators, documentation providing evidence that investments in Article 7(1), (2) and (3) are in accordance with Section 5 of the Clean Industrial Deal State Aid Framework (CISAF);
(b)for operators seeking to meet the conditionality requirements set out in Article 7(1) or (2):
(i)a verification report confirming during the verification of the annual activity level reports for the years 2026 and 2027 in accordance with Article 3 of Implementing Regulation (EU) 2019/1842 that the conditions set out in Article 7(1) or (2) have been met;
(iia)inserted: a technical decarbonisation plan and a certified project impact assessment demonstrating that the intended investments lead to verifiable emission reductions.
(ii)if applicable, documentary evidence of the legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 for the investment referred to in Article 7(1), point (c), and the documentary evidence that the investment will lead to greenhouse gas emission reductions equivalent to those recommended by the audit report or by the certified Energy Management System for the installation concerned.
(c)for operators seeking to meet the conditionality requirements of Article 7(3) both of the following:
(i)a verified climate-neutrality report in accordance with Article 3b of Implementing Regulation (EU) 2019/1842 that has been verified as satisfactory in accordance with Commission Implementing Regulation (EU) 2018/2067; or for operators submitting a climate neutrality plan for the first time, a climate neutrality plan for their activities covered by Directive 2003/87/EC in accordance with Implementing Regulation (EU) 2023/2441;
(ii)documentary evidence of the legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 for the investment referred to in Article 7(3), and the documentary evidence that the investment leads to the achievement of the targets and milestones referred to in the most recent climate neutrality plan in accordance with Implementing Regulation (EU) 2023/2441.
2a.inserted: For downstream operators, an application submitted pursuant to paragraph 1 shall be accompanied by the following specific elements:
(a)inserted: production data for the production reference period covered by the call for application referred to in paragraph 1 to verify the eligibility for financial support;
(b)inserted: the share of production sold in third countries broken down by country of export;
(c)inserted: if applicable, a tax transparency report and an ownership structure disclosure providing evidence that the operator and its parent company are not established in jurisdictions listed in the Union list of non-cooperative jurisdictions for tax purposes.
2b.inserted: SMEs, as defined in Directive 2013/34/EU of the European Parliament and of the Council1a, shall not be required to update their existing climate-neutrality plans, verified climate-neutrality report, energy audit, certified Energy Management System or certified Environmental Management System incompliance with CISAF, solely for the purpose of receiving support from this Fund.
inserted: 1a Directive 2013/34/EU of the European Parliament and of the Council of 26 June 2013 on the annual financial statements, consolidated financial statements and related reports of certain types of undertakings, amending Directive 2006/43/EC of the European Parliament and of the Council and repealing Council Directives 78/660/EEC and 83/349/EEC (OJ L 182, 29.6.2013, p. 19, ELI: http://data.europa.eu/eli/dir/2013/34/oj).
2c.inserted: Within 15 days of reception of the application referred to in paragraph 1, the Commission shall assess the completeness of the information provided by the applicant which is necessary to evaluate the eligibility of the operator and the downstream operator for support under the Fund. If before the end of 15 days, the Commission assesses that the information provided by the applicant is incomplete or insufficient to conclude the evaluation of its request, the applicant shall be requested to submit complementary information within 15 days. Following an acknowledgment of completeness, the applicant shall not be asked to provide any new information unless duly justified.
3.The Commission is empowered to adopt implementing acts to further define details related to procedural requirements, the documents and evidence submitted as part of the application procedure to be eligible for financial support by the Fund, particularly the minimum contents to be submitted as part of the production data report and the documentary evidence of the legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 15(2).
3a.inserted: When establishing the details under Article 8(3) of this Regulation, the Commission shall align them and the requirements of Article 7 of this Regulation with the existing Union acquis, and notably with the requirements and methodologies for monitoring, reporting and verification of emissions laid down in Directive 2003/87/EC.
3b.inserted: Following the conclusion of the decisions referred to in Article 10(3), the Commission shall make the relevant documentation, evidence and plans submitted to the Commission, by operators and downstream operators, pursuant to this Article, publicly available. This shall be done in accordance with the applicable Union law on the protection of personal data, as well as commercially sensitive information and trade secrets, in particular pursuant to Regulation (EU) 2018/1725 of the European Parliament and of the Council1a and Directive (EU) 2016/943 of the European Parliament and of the Council1b, respectively.
inserted: 1a Regulation (EU) 2018/1725 of the European Parliament and of the Council of 23 October 2018 on the protection of natural persons with regard to the processing of personal data by the Union institutions, bodies, offices and agencies and on the free movement of such data, and repealing Regulation (EC) No 45/2001 and Decision No 1247/2002/EC (OJ L 295, 21.11.2018, p. 39, ELI: http://data.europa.eu/eli/reg/2018/1725/oj).
inserted: 1b Directive (EU) 2016/943 of the European Parliament and of the Council of 8 June 2016 on the protection of undisclosed know-how and business information (trade secrets) against their unlawful acquisition, use and disclosure (OJ L 157, 15.6.2016, p. 1, ELI: http://data.europa.eu/eli/dir/2016/943/oj).
4.deleted: Ainserted: 4. deleted: competentinserted: The deleted: authorityinserted: Commission shall assess inserted: with the inserted: support of relevant competent authorities, the documentation provided in accordance with paragraph 2. Based on that assessment, the deleted: competent authorityinserted: Commission shall decide whether the conditions set out in Articles 6 and 7 have been met. It shall recover funds if the conditions were not met and bring legal proceedings where necessary in that regard.
5.inserted: 5. By 30 June deleted: 2028, a competentinserted: 2027 deleted: authorityinserted: and deleted: shallinserted: 30 deleted: provideinserted: June deleted: toinserted: 2028, the Commission inserted: shall establish a list identifying all the applicants that inserted: applied for support by 31 March 2027 and 31 March 2028, respectively, that meet the conditions as determined in accordance with paragraph 4, their respective installations and the level of support calculated in accordance with Article 9.
Article 9
Calculation of support by the competent authorities
1.deleted: Theinserted: 1. deleted: competentinserted: The deleted: authoritiesinserted: Commission shall assess and calculate the amount of financial support to be provided to eligible operators, for the production of each of the inserted: exported goods listed in the Annex, based on the amount of free allocation phased deleted: out.inserted: out, inserted: in a transparent manner. That amount of allowances shall be calculated in accordance with Article 16(8) of Delegated Regulation (EU) 2019/331 and take into account the Decision the Commission has adopted in accordance with Article 23(4) of that Regulation. To obtain the financial value of the support, the amount of free allowances shall be adjusted to the share of production (in volume) of goods listed in the Annex, inserted: that has been exported to third-country markets, and multiplied with the annual average of the closing prices of EU ETS allowances on the common auction platform inserted: for the reference period for which an application for support has been submitted in deleted: 2026inserted: accordance deleted: andinserted: with deleted: 2027,inserted: Article inserted: 8(1) of this Regulation and in accordance with the procedures laid down in Delegated Regulation (EU) 2023/2830.
1a.inserted: The Commission shall assess and calculate the amount of financial support to be provided to eligible downstream operators for the production of each exported good listed in the Annex, based on:
(a)inserted: the volume of those goods exported;
(b)inserted: the CO2 content of the CBAM-covered inputs or precursors used to produce those goods; and
(c)inserted: the annual average price of CBAM certificates for the reference period, as calculated pursuant to Article 22 of Regulation (EU) 2023/956 and the implementing acts adopted pursuant to paragraph 1b of this Article, taking into account the adjustment necessary to reflect the extent to which EU ETS allowances are allocated free of charge in accordance with Article 31 of Regulation (EU) 2023/956.
1b.inserted: The Commission shall, by means of implementing acts, specify the methodology for determining the CO2 content of inputs, the annual average price of CBAM certificates calculated as the weekly average prices of CBAM certificates published pursuant to Article 22 of Regulation (EU) 2023/956, and the parameters used for that calculation.
1c.inserted: Pursuant to paragraphs 1, 1a and 1b, when calculating the level of financial support, the Commission shall take into account, to the extent possible, the competitiveness risk faced by the goods in the country destination due to differences in carbon-pricing schemes and equivalent regulatory constraints on industrial emissions between that destination and the Union, notably by establishing a methodology based on public and objective indicators.
2.The total financial support granted by the Fund to all final beneficiaries shall not exceed the resources of the Fund referred to in Article 3(2), reduced by the administrative costs incurred by the Commission pursuant to Article 3(5).
Article 10
Disbursement decision by the Commission
1.deleted: Uponinserted: 1. deleted: receiptinserted: Upon deleted: ofinserted: establishing the list referred to in Article 8(5), the Commission shall perform the following actions:
(a)inserted: (a) review the calculation performed deleted: by the competent authorities pursuant to Article 9(1);inserted: (1a), (1b) and (1c);
(b)inserted: (b) assess the inclusion of each operator inserted: installation and deleted: installationinserted: downstream inserted: operator in the list;
(c)assess the information submitted in accordance with Article 8(2);
(d)determine the individual amounts of financial support to be awarded to each final beneficiary.
2.The Commission shall proportionally reduce the amount of support to be awarded to each final beneficiary in accordance with Article 9(1) where it is needed to comply with Article 9(2).
3.inserted: 3. Based on its assessment in accordance with paragraph 1, the Commission shall adopt an implementing decision inserted: by 31 December 2027 for the lists received by 30 June 2027 and by 31 December 2028 for the lists received by 30 June 2028 on the financial support to the operators inserted: including downstream operators, upon availability of the resources of the Fund. That decision shall constitute a financing decision within the meaning of Article 110 of Regulation (EU, Euratom) 2024/2509. The notification of that decision to the competent authority concerned shall constitute an individual legal commitment within the meaning of Regulation (EU, Euratom) 2024/2509.
4.inserted: 4. The decision referred to in paragraph 3 shall inserted: be publicly available and set out the total amount to be transferred to the respective Member State, the list of the final beneficiaries of financial support and the amount for each deleted: recipient.inserted: recipient, and information on how the beneficiaries meet the conditions set out in Article 7.
Article 11
Disbursement of financial support
1.deleted: Followinginserted: 1. inserted: Within one month following the adoption of the decision referred to in Article 10(3), the Commission shall disburse the total amount set out in that decision to the inserted: relevant competent authorities. By derogation from Article 196(3) of Regulation (EU, Euratom) 2024/2509, the Commission may also pay support with respect to investments and productions even if already completed.
2.inserted: 2. Within one month upon receipt of the funding from the Commission and at the latest on 31 inserted: March 2028 for the implementing decisions referred to in Article 10(3) adopted by 31 December inserted: 2027 and on 31 March 2029, inserted: for the inserted: implementing decisions referred to in Article 10(3) adopted by 31 December 2028, the relevant competent authorities shall disburse the financial support awarded by the Commission under the decisions referred to in Article 10(3) to the final beneficiaries and shall inform the Commission immediately after the disbursements are made.
Article 12
Protection of the financial interests of the Union
1.inserted: 1. Member States, as beneficiaries of funds under the Fund, inserted: and relevant competent authorities shall take all the appropriate measures to protect the financial interests of the Union and to ensure that the use of the financial allocations complies with applicable Union and national law, in particular regarding the prevention, detection and tackling of fraud, corruption, conflicts of interests and all other irregularities affecting the financial interests of the Union. To that effect, Member States shall take any necessary measures inserted: to prevent wrongful payouts and for the recovery of amounts wrongly paid. Member States shall rely on their national budget management, control and recovery systems.
2.The decision referred to in Article 10(3) shall provide for the following obligations on the Member States:
(a)inserted: (a) that Member States take appropriate measures to prevent, detect and tackle fraud, corruption, conflicts of interests inserted: non-compliance and all other irregularities affecting the financial interest of the Union within the meaning of Article 61 of Regulation (EU, Euratom) 2024/2509 and to take legal action to recover funds that have been unduly spent or misappropriated;inserted: the Commission, with support of the Member State relevant competent authorities, shall verify that the final beneficiaries have used the financial support to carry out the investments and that they have complied with the conditions referred to in Article 7;
(b)that Member States maintain data as regards the name of all final beneficiaries of the financial allocations, their VAT registration numbers or tax identification numbers and amount of the financial allocations from the Fund;
(c)to expressly authorise that the Commission, OLAF, the Court of Auditors and, in respect of those Member States participating in enhanced cooperation pursuant to Regulation (EU) 2017/1939, the EPPO can exert their rights as provided for in Article 129(1) of Regulation (EU, Euratom) 2024/2059 and to impose obligations on all final beneficiaries of the financial support to expressly authorise the Commission, OLAF, the Court of Auditors and, where applicable, EPPO to exert their rights as provided for in Article 129(1) of Regulation (EU, Euratom) 2024/2059 and to impose similar obligations on all final beneficiaries of funds disbursed;
(d)that Member States shall keep records in accordance with Article 133 of Regulation (EU, Euratom) 2024/2509;
(e)inserted: (e) to expressly authorise that the Commission has the right to reduce the financial support under the Fund proportionately and recover any amount due to the Union budget, in cases of fraud, corruption, conflict of interests inserted: non-compliance or any other irregularity affecting the financial interests of the Union.
3.When deciding on the amount of the recovery and reduction the Commission shall respect the principle of proportionality and shall take into account the seriousness of the concerned fraud, corruption, conflict of interests and other irregularity affecting the financial interests of the Union, or of a breach of an obligation. The Commission shall give the Member State the opportunity to present its observations before the reduction is made.
Article 13
Obligations of final beneficiaries
1.The final beneficiaries shall be responsible of the data submitted under this Regulation by them and keep complete and accurate records of the activities referred to in Article 7 substantiating their submissions.
2.To this end, the Commission is empowered to adopt implementing acts to specify the responsibilities and monitoring obligations of the final beneficiaries, including by specifying the data retention period. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 15(2).
3.The final beneficiaries shall cooperate with the Commission or the relevant competent authority when they perform audits, evaluations, and monitoring activities. Upon request, the final beneficiaries shall timely provide the information and documents referred to in paragraph 1 to the competent authorities and to the Commission.
Article 14
Exercise of the delegation
1.The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article.
2.The power to adopt delegated acts referred to in Article 3(6), Article 4(2) and Article 6(3) shall be conferred on the Commission for a period of five years ending on [OP please insert the date: five years after the entry into force of this Regulation].
3.The delegation of power referred to in Article 3(6), Article 4(2) and Article 6(3) may be revoked at any time by the European Parliament or by the Council. A decision to revoke shall put an end to the delegation of the power specified in that decision. It shall take effect on the day following the publication of the decision in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated acts already in force.
4.Before adopting a delegated act, the Commission shall consult experts designated by each Member State in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making.
5.As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council.
6.A delegated act adopted pursuant to Article 3(6), Article 4(2) and Article 6(3) shall enter into force only if no objection has been expressed either by the European Parliament or by the Council within a period of one month of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by one month at the initiative of the European Parliament or of the Council.
Article 15
Implementing powers
1.The Commission shall be assisted by the Committee established by Article 44 of Regulation (EU) No 2018/1999 of the European Parliament and of the Council. That committee shall be a committee within the meaning of Regulation (EU) No 182/2011.
2.Where reference is made to this paragraph, Article 5 of Regulation (EU) No 182/2011 shall apply.
Article 16
Entry into force
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
LEGISLATIVE FINANCIAL AND DIGITAL STATEMENT
1.FRAMEWORK OF THE PROPOSAL/INITIATIVE
1.1.Title of the proposal/initiative
Proposal for a Regulation of the European Parliament and of the Temporary Decarbonisation Fund
1.2.Policy area(s) concerned
Climate Action
1.3.Objective(s)
1.3.1.General objective(s)
Regulation (EU) 2021/1119 of the European Parliament and of the Council (‘the European Climate Law’) sets a legally binding economy-wide target of net zero greenhouse gas emissions at the latest by 2050, and an intermediate target of reducing net greenhouse gas emissions by at least 55% by 2030, compared to 1990 levels.
In July 2025 the European Commission proposed a target of a 90% reduction in net greenhouse gas (GHG) emissions by 2040, compared to 1990 levels. This proposed target takes full account of the current economic, security and geopolitical landscape in alignment with the EU Competitiveness Compass, Clean Industrial Deal and Affordable Energy Action Plan. It aims to provide the necessary predictability and stability for investments in the EU's clean energy transition and for driving industrial competitiveness.
1.3.2.Specific objective(s)
Specific objective
The Carbon Border Adjustment Mechanism (CBAM) addresses carbon leakage risks for the sectors covered by the mechanism. However, there is a risk that the production of some goods might bear a particularly elevated remaining carbon leakage risk. Decarbonisation investments can help reduce the exposure of these operators to such remaining carbon leakage risks in the mid- and long-term.
The objective of the present proposal is to temporarily support, during the production years 2026 and 2027, operators producing goods associated with a particularly elevated remaining carbon leakage risk to effectively invest in decarbonisation measures.
1.3.3.Expected result(s) and impact
Specify the effects which the proposal/initiative should have on the beneficiaries/groups targeted.
Effective carbon costs for ETS operators are expected to increase as free allocation is reduced, notably for operators covered by the CBAM factor. This increased price signal for decarbonisation is expected to promote cost-effective GHG emission reductions. However, the production of some goods might bear an increased remaining risk of carbon leakage. which is not fully prevented by the CBAM.
The proposed initiative will provide temporary financial support to operators facing a remaining carbon leakage risk for accelerating investments in decarbonisation measures. It will thereby address this remaining carbon leakage risk.
1.3.4.Indicators of performance
Specify the indicators for monitoring progress and achievements.
Financial support for decarbonisation provided to operators facing a remaining carbon leakage risk
Demonstration of implementations of recommendations of an energy audit
Decarbonisation investments confirmed
1.4.The proposal/initiative relates to:
a new action
a new action following a pilot project / preparatory action
the extension of an existing action
a merger or redirection of one or more actions towards another/a new action
1.5.Grounds for the proposal/initiative
1.5.1.Requirement(s) to be met in the short, medium or long term including a detailed timeline for roll-out of the implementation of the initiative
The decrease in emissions under the EU ETS in recent years was largely driven by the electricity sector. Emissions in the energy intensive industries, on the other hand, experienced only slight decreases, which were also partly explained by decreases in output. The availability and affordability of abatement options in these sectors is not yet at the level of the power sector. This points to a need for investment into decarbonisation measures in these sectors because these investments are needed to achieve EU climate targets and reduce the risk of carbon leakage.
Planned timeline for implementation:
–by 31 March 2028, operators of an installation producing eligible goods may submit an application for support from the Fund. The application is to include relevant production data for the years 2026 and 2027;
–by 31 March 2028, Member States transfer an amount corresponding to 25% of their CBAM revenues for 2026 to the Commission;
–by 30 June 2028, competent authorities provide to the Commission a list of all applicants meeting the eligibility and conditionality requirements, their respective installations, and the level of support calculated, together with relevant documentation on all these aspects;
–by 31 March 2029, Member States transfer an amount corresponding to 25% of their CBAM revenues for 2027 to the Commission;
–the Commission reviews calculations and information submitted by Member States’ competent authorities, issues a disbursement decision, and transfers applicable monetary amounts to the competent authorities;
–by 31 December 2029, competent authorities disburse support to the final beneficiaries;
–by 31 December 2030, the Commission present a report on the Fund implementation and support provided to the European Parliament and Council.
1.5.2.Added value of EU involvement (it may result from different factors, e.g. coordination gains, legal certainty, greater effectiveness or complementarities). For the purposes of this section 'added value of EU involvement' is the value resulting from EU action, that is additional to the value that would have been otherwise created by Member States alone.
Reasons for action at EU level (ex-ante):
This initiative is strongly linked to the pricing of carbon applied at EU level via the EU Emissions Trading System (EU-ETS) which applies to the production of carbon-intensive products in the EU. The proposed fund would support operators covered by the EU Emissions Trading System that face a remaining risk of carbon leakage risk due to the reduction of free allocation of EU-ETS emission allowances over the coming years. For all these reasons, it is for the EU to take action.
Expected generated EU added value (ex-post):
The proposed temporary decarbonisation investment support will apply to operators across the EU based on objective criteria. This will enable the fund to precisely target the production of goods with an increased level of remaining carbon leakage risk in relation to the EU-ETS. Such targeted support will ensure the effectiveness of the measure.
1.5.3.Lessons learned from similar experiences in the past
The proposed mechanism for disbursement of the fund builds on positive experiences from other existing EU funding instruments, notably the Modernisation Fund (MF), which are built on a two-step system for the disbursal, i.e. in which the Commission (or another implementing EU level implementing agency) first transfers the amounts corresponding to approved investments to the national competent authorities. The latter then further disburse amounts to the final beneficiaries. In the MF, this disbursement system has proven successful, since (a) it brings a low level of administrative burden at the EU level, and (b) national competent authorities can follow applicable national rules for the disbursement to final beneficiaries. The Modernisation Fund is implemented outside the EU budget structure.
1.5.4.Compatibility with the multiannual financial framework and possible synergies with other appropriate instruments
This proposal is outside the multiannual financial framework (MFF). The possible good practice is looked for in the Modernisation Fund model, however it is proposed that this fund is channelled via the EU budget structure.
1.5.5.Assessment of the different available financing options, including scope for redeployment
Taking into consideration that the fund will have its own budget (revenue from the fund) and that part of it is foreseen to cover the administrative costs, the current proposed model seems the most appropriate, but the preparation phase. For this part the staff costs should be covered from redeployment under heading 7 within the implementing services until the revenue inflow.
1.6.Duration of the proposal/initiative and of its financial impact
limited duration
– in effect from 2026 to 2031
– financial impact from 2026 to 2030 for commitment appropriations and from 2026 to 2031 for payment appropriations.
unlimited duration
–Implementation with a start-up period from YYYY to YYYY,
–followed by full-scale operation.
1.7.Method(s) of budget implementation planned [Details of budget implementation methods and references to the Financial Regulation may be found on the BUDGpedia site: https://myintracomm.ec.europa.eu/corp/budget/financial-rules/budget-implementation/Pages/implementation-methods.aspx]
Direct management by the Commission
– by its departments, including by its staff in the Union delegations;
– by the executive agencies
Shared management with the Member States
Indirect management by entrusting budget implementation tasks to:
– third countries or the bodies they have designated
– international organisations and their agencies (to be specified)
– the European Investment Bank and the European Investment Fund
– bodies referred to in Articles 70 and 71 of the Financial Regulation
– public law bodies
– bodies governed by private law with a public service mission to the extent that they are provided with adequate financial guarantees
– bodies governed by the private law of a Member State that are entrusted with the implementation of a public-private partnership and that are provided with adequate financial guarantees
– bodies or persons entrusted with the implementation of specific actions in the common foreign and security policy pursuant to Title V of the Treaty on European Union, and identified in the relevant basic act
–bodies established in a Member State, governed by the private law of a Member State or Union law and eligible to be entrusted, in accordance with sector-specific rules, with the implementation of Union funds or budgetary guarantees, to the extent that such bodies are controlled by public law bodies or by bodies governed by private law with a public service mission, and are provided with adequate financial guarantees in the form of joint and several liability by the controlling bodies or equivalent financial guarantees and which may be, for each action, limited to the maximum amount of the Union support.
If more than one budget implementation method is indicated, please provide details in the ‘Comments’ section.
Comments
N/A
2.MANAGEMENT MEASURES
2.1.Monitoring and reporting rules
Specify frequency and conditions.
The monitoring and reporting rules at the operational level of implementation of the regulation are described in Article 4 of the regulation.
As to the administrative/budget monitoring and reporting rules, the usual direct management obligations under Financial Regulation will apply, e.g. establishment of the recovery orders.
2.2.Management and control system(s)
2.2.1.Justification of the budget implementation method(s), the funding implementation mechanism(s), the payment modalities and the control strategy proposed
The operational budget implementation mechanism, payment modalities are described in Article 3 and 4 of the regulation.
The control strategy will apply the set of controls stemming from the Financial Regulation for the direct management.
2.2.2.Information concerning the risks identified and the internal control system(s) set up to mitigate them
This proposal does not bring about new significant controls/risks that would not be covered by an existing internal control framework. No specific measures beyond the application of the Financial Regulation have been envisaged.
2.2.3.Estimation and justification of the cost-effectiveness of the controls (ratio between the control costs and the value of the related funds managed), and assessment of the expected levels of risk of error (at payment & at closure)
It is expected that the cost of controls as to the part implemented by the Commission should remain stable, mostly because of the ratio of relatively low involved resources and high amounts to redistribute.
The levels of risk of error (at payment & at closure) are also estimated at not more than 2%. As such there is no ex-post control foreseen, but rather the enforced ex-ante verification.
2.3.Measures to prevent fraud and irregularities
Specify existing or envisaged prevention and protection measures, e.g. from the anti-fraud strategy.
DG CLIMA’s and DG TAXUD’s fraud prevention and detection strategy will apply.
More details, specific to this legal act, are provided in Article 12 of the regulation.
3.ESTIMATED FINANCIAL IMPACT OF THE PROPOSAL/INITIATIVE
3.1.Heading(s) of the multiannual financial framework and expenditure budget line(s) affected
Please insert as many budget lines as needed in the two tables below.
·Existing budget lines
In order of multiannual financial framework headings and budget lines.
Heading of multiannual financial framework | Budget line | Type of expenditure | Contribution
Number | Diff./Non-diff. | from EFTA countries | from candidate countries and potential candidates | From other third countries | other assigned revenue
20 02 01 01 Contract Staff | Non-diff. | NO | NO | NO | NO
20 02 06 04 Studies and consultations | Non-diff. | NO | NO | NO | NO
·New budget lines requested
In order of multiannual financial framework headings and budget lines.
Heading of multiannual financial framework | Budget line | Type of expenditure | Contribution
Number | Diff./Non-diff. | from EFTA countries | from candidate countries and potential candidates | from other third countries | other assigned revenue
Temporary Decarbonisation Fund [budget line to be defined in the next MFF nomenclature] | Diff. | NO | NO | NO | YES
Temporary Decarbonisation Fund – administrative expenditure [budget line to be defined in the next MFF nomenclature] | Non-diff. | NO | NO | NO | YES
3.2.Estimated financial impact of the proposal on appropriations
3.2.1.Summary of estimated impact on operational appropriations
– The proposal/initiative does not require the use of operational appropriations
– The proposal/initiative requires the use of operational appropriations, as explained below
3.2.1.1.Appropriations from voted budget
EUR million (to three decimal places)
Heading of multiannual financial framework | 7 | ‘Administrative expenditure’
DG CLIMA/TAXUD | Year | Year | Year | Year | Year | TOTAL 2026-2030
2026 | 2027 | 2028 | 2029 | 2030
Human resources | 0.808 | 0.909 | 0 | 0 | 0 | 1.717
Other administrative expenditure | 0.200 | 0.200 | 0 | 0 | 0 | 0.400
TOTAL DG CLIMA/TAXUD | Appropriations | 1.008 | 1.109 | 0 | 0 | 0 | 2.117
TOTAL appropriations under HEADING 7 | (Total commitments = Total payments) | 1.008 | 1.109 | 0 | 0 | 0 | 2.117
EUR million (to three decimal places)
Year | Year | Year | Year | Year | TOTAL 2026-2030
2026 | 2027 | 2028 | 2029 | 2030
TOTAL appropriations under HEADINGS 1 to 7 | Commitments | 1.008 | 1.109 | 0 | 0 | 0 | 2.117
of the multiannual financial framework | Payments | 1.008 | 1.109 | 0 | 0 | 0 | 2.117
=================================================================================================
Optional: if the proposal is partly or fully financed from external assigned revenues, fill in the table in Section 3.2.1.2. If not, please delete the whole section.
3.2.1.2.Appropriations from external assigned revenues
EUR million (to three decimal places)
Heading of multiannual financial framework | Number | XX Budget line to be defined in the next MFF nomenclature
DG <…….> | Year | Year | Year | Year | Year | TOTAL 2026-2030
2026 | 2027 | 2028 | 2029 | 2030
Operational appropriations
YY YY YY Temporary Decarbonisation Fund | Commitments | (1a) | 0.000 | pm | pm | pm
Payments | (2a) | pm | pm | pm | pm
YY YY YY Temporary Decarbonisation Fund – administrative expenditure | Commitments | (1b) | 0.000 | 1.329 | 0.953 | 0.751 | 3.262
Payments | (2b) | 0.000 | 1.329 | 0.953 | 0.751 | 3.262
Appropriations of an administrative nature financed from the envelope of specific programmes [Technical and/or administrative assistance and expenditure in support of the implementation of EU programmes and/or actions (former ‘BA’ lines), indirect research, direct research.]
Budget line | (3) | 0.000
TOTAL appropriations for DG CLIMA/TAXUD | Commitments | =1a+1b+3 | 0 | 0.000 | 1.329 | 0.953 | 0.751 | 4.162
Payments | =2a+2b+3 | 0.000 | 1.329 | 0.953 | 0.751 | 4.162
3.2.2.Estimated output funded from operational appropriations (not to be completed for decentralised agencies)
Commitment appropriations in EUR million (to three decimal places)
Indicate objectives and outputs | Year 202 8 | Year 202 9 | Year 20 30 | Year 20 31 | Enter as many years as necessary to show the duration of the impact (see Section1.6) | TOTAL
OUTPUTS
Type | Average cost | No | Cost | No | Cost | No | Cost | No | Cost | No | Cost | No | Cost | No | Cost | Total No | Total cost
SPECIFIC OBJECTIVE No 1 …
- Output
- Output
- Output
Subtotal for specific objective No 1
SPECIFIC OBJECTIVE No 2 ...
- Output
Subtotal for specific objective No 2
TOTALS
3.2.3.Summary of estimated impact on administrative appropriations
– The proposal/initiative does not require the use of appropriations of an administrative nature
– The proposal/initiative requires the use of appropriations of an administrative nature, as explained below
3.2.3.1. Appropriations from voted budget
VOTED APPROPRIATIONS | Year | Year | Year | Year | Year | TOTAL 2026 - 2030
2026 | 2027 | 2028 | 2029 | 2030
HEADING 7
Human resources | 0.808 | 0.909 | 0.000 | 0.000 | 0.000 | 1.717
Other administrative expenditure | 0.200 | 0.200 | 0.000 | 0.000 | 0.000 | 0.400
Subtotal HEADING 7 | 1.008 | 1.109 | 0.000 | 0.000 | 0.000 | 2.117
Outside HEADING 7
Human resources | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000
Other expenditure of an administrative nature | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000
Subtotal outside HEADING 7 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000
TOTAL | 1.008 | 1.109 | 0.000 | 0.000 | 0.000 | 2.117
===================================================================
Optional: if the proposal is partly or fully financed from external assigned revenues, fill in the tables in Sections 3.2.3.2. and 3.2.3.3. If not, please delete both sections.
3.2.3.2.Appropriations from external assigned revenues
EXTERNAL ASSIGNED REVENUES | Year | Year | Year | Year | Year | TOTAL 2026 - 2030
2026 | 2027 | 2028 | 2029 | 2030
HEADING 7
Human resources | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000
Other administrative expenditure | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000
Subtotal HEADING 7 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000
Outside HEADING 4
Human resources | 0.000 | 0.000 | 1.129 | 0.753 | 0.251 | 2.133
Other expenditure of an administrative nature | 0.000 | 0.000 | 0.200 | 0.500 | 0.000 | 0.700
Subtotal outside HEADING 4 | 0.000 | 0.000 | 1.329 | 1.253 | 0.251 | 2.833
TOTAL | 0.000 | 0.000 | 1.329 | 1.253 | 0.251 | 2.833
3.2.3.3.Total appropriations
TOTAL VOTED APPROPRIATIONS + EXTERNAL ASSIGNED REVENUES | Year | Year | Year | Year | Year | TOTAL 2026 - 2030
2026 | 2027 | 2028 | 2029 | 2030
HEADING 7
Human resources | 0.808 | 0.909 | 0.000 | 0.000 | 0.000 | 1.717
Other administrative expenditure | 0.200 | 0.200 | 0.000 | 0.000 | 0.000 | 0.400
Subtotal HEADING 7 | 1.008 | 1.109 | 0.000 | 0.000 | 0.000 | 2.117
Outside HEADING 7
Human resources | 0.000 | 0.000 | 1.129 | 0.753 | 0.251 | 2.133
Other expenditure of an administrative nature | 0.000 | 0.000 | 0.200 | 0.500 | 0.000 | 0.700
Subtotal outside HEADING 7 | 0.000 | 0.000 | 1.329 | 1.253 | 0.251 | 2.833
TOTAL | 1.008 | 1.109 | 1.329 | 1.253 | 0.251 | 4.950
===================================================================
From 2026 and until external assigne revenue is made available, . the appropriations required for human resources and other expenditure of an administrative nature will be met by appropriations from the DG that are already assigned to management of the action and/or have been redeployed within the DG. As from the collection of assigned revenues, the human resources and other adminsitrative costs required would be financed from those revenues.
3.2.4.Estimated requirements of human resources
– The proposal/initiative does not require the use of human resources
– The proposal/initiative requires the use of human resources, as explained below
3.2.4.1.Financed from voted budget
Estimate to be expressed in full-time equivalent units (FTEs)
[Please specify below the table how many FTEs within the number indicated are already assigned to the management of the action and/or can be redeployed within your DG and what are your net needs.]
VOTED APPROPRIATIONS | Year | Year | Year | Year | Year | Year | Year 2026-2031
2026 | 2027 | 2028 | 2029 | 2030 | 2031
Establishment plan posts (officials and temporary staff)
20 01 02 01 (Headquarters and Commission’s Representation Offices) | 0 | 0 | 0 | 0 | 0 | 0 | 0
20 01 02 03 (EU Delegations) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 01 (Indirect research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 11 (Direct research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) | 0 | 0 | 0 | 0 | 0 | 0 | 0
• External staff (inFTEs)
20 02 01 (AC, END from the ‘global envelope’) | 8 | 9 | 0 | 0 | 0 | 0 | 17
20 02 03 (AC, AL, END and JPD in the EU Delegations) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Admin. Support line [XX.01.YY.YY] | - at Headquarters | 0 | 0 | 0 | 0 | 0 | 0 | 0
- in EU Delegations | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 02 (AC, END - Indirect research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 12 (AC, END - Direct research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) - Heading 7 | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) - Outside Heading 7 | 0 | 0 | 0 | 0 | 0 | 0 | 0
TOTAL | 8 | 9 | 0 | 0 | 0 | 0 | 17
===================================================================
Optional: if the proposal is partly or fully financed from external assigned revenues, fill in the tables in Sections 3.2.4.2. and 3.2.4.3. If not, please delete both sections.
3.2.4.2.Financed from external assigned revenues
EXTERNAL ASSIGNED REVENUES | Year | Year | Year | Year | Year | Year | Year 2026-2031
2026 | 2027 | 2028 | 2029 | 2030 | 2031
Establishment plan posts (officials and temporary staff)
20 01 02 01 (Headquarters and Commission’s Representation Offices) | 0 | 0 | 0 | 0 | 0 | 0 | 0
20 01 02 03 (EU Delegations) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 01 (Indirect research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 11 (Direct research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) | 0 | 0 | 0 | 0 | 0 | 0 | 0
• External staff (in full time equivalent units)
20 02 01 (AC, END from the ‘global envelope’) | 0 | 0 | 0 | 0 | 0 | 0 | 0
20 02 03 (AC, AL, END and JPD in the EU Delegations) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Admin. Support line [XX.01.YY.YY] | - at Headquarters | 0 | 0 | 0 | 0 | 0 | 0 | 0
- in EU Delegations | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 02 (AC, END - Indirect research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 12 (AC, END - Direct research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) - Heading 7 | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) - Outside Heading 7 | 0 | 0 | 9 | 6 | 0 | 0 | 17
TOTAL | 0 | 0 | 9 | 6 | 2 | 0 | 17
3.2.4.3.Total requirements of human resources
TOTAL VOTED APPROPRIATIONS + EXTERNAL ASSIGNED REVENUES | Year | Year | Year | Year | Year | Year | Year 2026-2031
2026 | 2027 | 2028 | 2029 | 2030 | 2031
Establishment plan posts (officials and temporary staff)
20 01 02 01 (Headquarters and Commission’s Representation Offices) | 0 | 0 | 0 | 0 | 0 | 0 | 0
20 01 02 03 (EU Delegations) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 01 (Indirect research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 11 (Direct research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) | 0 | 0 | 0 | 0 | 0 | 0 | 0
• External staff (in full time equivalent units)
20 02 01 (AC, END from the ‘global envelope’) | 8 | 9 | 0 | 0 | 0 | 0 | 17
20 02 03 (AC, AL, END and JPD in the EU Delegations) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Admin. Support line [XX.01.YY.YY] | - at Headquarters | 0 | 0 | 0 | 0 | 0 | 0 | 0
- in EU Delegations | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 02 (AC, END - Indirect research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
01 01 01 12 (AC, END - Direct research) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) - Heading 7 | 0 | 0 | 0 | 0 | 0 | 0 | 0
Other budget lines (specify) - Outside Heading 7 XX.YYYY Temporary Decarbonisation Fund staff | 0 | 0 | 9 | 6 | 2 | 0 | 17
TOTAL | 8 | 9 | 9 | 6 | 2 | 0 | 34
===================================================================
The staff required to implement the proposal (in FTEs):
To be covered by current staff available in the Commission services | Exceptional additional staff*
To be financed under Heading 7 or Research | To be financed from BA line | To be financed from assigned revenue
Establishment plan posts | 0 | N/A | N/A | N/A
External staff (CA, SNEs, INT) | 8 in 2026 and 9 in 2027 until revenues are made available | N/A | N/A | 9 in 2028, 6 in 2029 and 2 in 2030, only as of when the revenues are made available
For 2026 and until assigned revenues are made available, considering the overall strained situation in Heading 7, in terms of both staffing and the level of appropriations, the human resources required will be met by staff from the implementing services who are already or will be assigned to the management of the action and related policy instruments and/or have been redeployed within the DGs. As from the collection of the assigned revenue, the human resources required would be financed from the Assigned Revenue.
Description of tasks to be carried out by:
Task | 2026 estimated FTEs | 2027 estimated FTEs | 2028 estimated FTEs | 2029 estimated FTEs | 2030 estimated FTEs
MS opt-in | Develop and adopt Delegated Act specifying the conditions and procedure for a MS opt-in | 1.5 | 3 | 1.5
Assess MS requests for opt-in
Adopt decision(s) on MS opt-in requests
General implementation | Develop and adopt Delegated Act on collection of revenue and breakdown per MS | 3.5 | 2
Develop and adopt Implementing Act on conditionality requirements
Application procedure | Develop and adopt Implementing Act on application procedure | 3 | 3 | 5.5 | 4
Develop Implementing Act to amend ALC/AVR (provisions on MMP, further division into sub-installation, evtl on control system and data gaps)
Develop guidance documents on application procedure/ conditionality requirements
Amend relevant ALC/AVR guidance documents
Review calculation performed by competent authorities; assess inclusion of each operator and installation in the list provided by the competent, authority, and related data submitted, adopt support Decision
Financial management | Financial management, including disbursement of support to competent authorities | 1 | 1 | 1 | 1
Reporting | Prepare an evaluation report, to be presented to EP and Council (including preparation of permanent solution and link to the IDB) | 1 | 1 | 1
8 | 9 | 9 | 6 | 2
3.2.5.Overview of estimated impact on digital technology-related investments
TOTAL Digital and IT appropriations | Year | Year | Year | Year | Year | Year | TOTAL 2026- 2031
2026 | 2027 | 2028 | 2029 | 2030 | 2031
IT expenditure (corporate) | 0 | 0 | 0 | 0 | 0 | 0 | 0
Subtotal HEADING 7 | 0 | 0 | 0 | 0 | 0 | 0 | 0
Policy IT expenditure on operational programmes | 0 | 0 | 0 | 0 | 0 | 0 | 0
Subtotal outside HEADING 7 | 0 | 0 | 0 | 0 | 0 | 0 | 0
TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | 0
3.2.6.Compatibility with the current multiannual financial framework
The proposal/initiative:
– can be fully financed through redeployment within the relevant heading of the multiannual financial framework (MFF)
N/A
–requires use of the unallocated margin under the relevant heading of the MFF and/or use of the special instruments as defined in the MFF Regulation
– requires a revision of the MFF
N/A
3.2.7.Third-party contributions
The proposal/initiative:
– does not provide for co-financing by third parties
– provides for the co-financing by third parties estimated below:
Appropriations in EUR million (to three decimal places)
Year 202 8 | Year 202 9 | Total
Member States | 308,324 | 324,201 | 632,525
TOTAL appropriations co-financed | 308,324 | 324,201 | 632,525
3.3. Estimated impact on revenue
– The proposal/initiative has no financial impact on revenue.
– The proposal/initiative has the following financial impact:
– on own resources
– on other revenue
– please indicate, if the revenue is assigned to expenditure lines
EUR million (to three decimal places)
Budget revenue line: | Appropriations available for the current financial year | Impact of the proposal/initiative
Year 2028 | Year 2029
New budget line to be cerated under chapter 621/66 (TBC) | 308,324 | 324,201
For assigned revenue, specify the budget expenditure line(s) affected.
New line for expenditure
Other remarks (e.g. method/formula used for calculating the impact on revenue or any other information).
The measure will be financed by a monetary amount transferred by Member States to the Fund, corresponding to 25% of the revenues generated by the sale of CBAM certificates by Member States in relation to embedded emissions declared for 2026 and 2027.
4.Digital dimensions
N/A
When completing this Section, it is acceptable to present the information in a table format, where appropriate.
4.1.Requirements of digital relevance
–N/A
4.2.Data
–N/A
4.3.Digital solutions
N/A.
4.4.Interoperability assessment
N/A
4.5.Measures to support digital implementation
–N/A
ANNEX
Goods eligible for support by the Fund
For the purpose of the identification of goods, this Regulation shall apply to goods falling under the Combined Nomenclature (‘CN’) codes set out in the table below. The CN codes shall be those under Regulation (EEC) No 2658/87.
Aluminium
CN code | Description
76069100 | Plates, sheets and strip, of non-alloy aluminium, of a thickness of > 0,2 mm (other than square or rectangular)
76072010 | Aluminium foil, backed, of a thickness (excl. any backing) of < 0,021 mm (excl. stamping foils of heading 3212, and foil made up as christmas tree decorating material)
76051900 | Wire of non-alloy aluminium, with a maximum cross-sectional dimension of <= 7 mm (other than stranded wires, cables, ropes and other articles of heading 7614, electrically insulated wires, strings for musical instruments)
76071910 | Aluminium foil, not backed, rolled and further worked, of a thickness of < 0,021 mm (excl. stamping foils of heading 3212, and foil made up as christmas tree decorating material)
76032000 | Powders of aluminium, of lamellar structure, and flakes of aluminium (excl. pellets of aluminium, and spangles)
76161000 | Nails, tacks, staples, screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles, of aluminium (excl. staples in strips, plugs, bungs and the like, threaded)
76061130 | Aluminium Composite Panel, of non-alloy aluminium, of a thickness of > 0,2 mm
Fertilisers
28342100 | Nitrate of potassium
31026000 | Double salts and mixtures of calcium nitrate and ammonium nitrate (excl. those in tablets or similar forms, or in packages with a gross weight of <= 10 kg)
31051000 | Mineral or chemical fertilisers of animal or vegetable origin, in tablets or similar forms, or in packages with a gross weight of <= 10 kg
31052010 | Mineral or chemical fertilisers containing phosphorus and potassium, with a nitrogen content > 10 % by weight on the dry anhydrous product (excl. those in tablets or similar forms, or in packages with a gross weight of <= 10 kg)
31054000 | Ammonium dihydrogenorthophosphate "monoammonium phosphate", whether or not mixed with diammonium hydrogenorthophosphate "diammonium phosphate" (excl. that in tablets or similar forms, or in packages with a gross weight of <= 10 kg)
31055100 | Mineral or chemical fertilisers containing nitrates and phosphates (excl. ammonium dihydrogenorthophosphate "Monoammonium phosphate", diammonium hydrogenorthophosphate "Diammonium phosphate", and those in tablets or similar forms, or in packages with a gross weight of <= 10 kg)
31055900 | Mineral or chemical fertilisers containing the two fertilising elements nitrogen (excl. nitrate) and phosphorus but not nitrates (excl. ammonium dihydrogenorthophosphate "monoammonium phosphate", diammonium hydrogenorthophosphate "diammonium phosphate" in tablets or similar forms, or in packages with a gross weight of <= 10 kg)
31059080 | Mineral or chemical fertilisers containing the two fertilising elements nitrogen and potassium, or one main fertilising element, incl. mixtures of animal or vegetable fertilisers with chemical or mineral fertilisers, not containing nitrogen or with a nitrogen content, by weight, of <= 10% (excl. in tablets or similar forms or in packages of a gross weight of <= 10 kg)
Iron & Steel
26011200 | Agglomerated iron ores and concentrates (excl. roasted iron pyrites)
72011019 | Non-alloy pig iron in pigs, blocks or other primary forms, containing by weight <= 0,5% phosphorus, >= 0,4% manganese and > 1% silicon
72012000 | Non-alloy pig iron in pigs, blocks or other primary forms, containing by weight >= 0,5% phosphorus
72015010 | Alloy pig iron in pigs, blocks or other primary forms, containing by weight >= 0,3% but <= 1% titanium and >= 0,5% but <= 1% vanadium
72015090 | Alloy pig iron and spiegeleisen, in pigs, blocks or other primary forms (excl. alloy iron containing, by weight, >= 0,3% but <= 1% titanium and >= 0,5% but <= 1% vanadium)
72021180 | Ferro-manganese, containing by weight > 2% carbon (excl. ferro-manganese with a granulometry of <= 5 mm and containing by weight > 65% manganese)
72021900 | Ferro-manganese, containing by weight <= 2% carbon
72024190 | Ferro-chromium, containing by weight > 6% carbon
72024910 | Ferro-chromium, containing by weight <= 0,05% carbon
72026000 | Ferro-nickel
72039000 | Spongy ferrous products, obtained from molten pig iron by atomisation, iron of a purity of >= 99,94%, in lumps, pellets or similar forms
72052100 | Powders, of alloy steel (excl. powders of ferro-alloys and radioactive iron powders "isotopes")
72052900 | Powders, of pig iron, spiegeleisen, iron or non-alloy steel (excl. powders of ferro-alloys and radioactive iron powders "isotopes")
72072039 | Semi-finished products of iron or non-alloy steel, containing by weight >= 0,25% carbon, of rectangular "other than square" cross-section and the width >= twice the thickness, forged
72081000 | Flat-rolled products of iron or non-alloy steel, of a width of >= 600 mm, in coils, simply hot-rolled, not clad, plated or coated, with patterns in relief directly due to the rolling process
72099020 | Flat-rolled products of iron or steel, of a width of >= 600 mm, cold-rolled "cold-reduced" and further worked, but not clad, plated or coated, perforated
72101100 | Flat-rolled products of iron or non-alloy steel, of a width of >= 600 mm, hot-rolled or cold-rolled "cold-reduced", tinned, of a thickness of >= 0,5 mm
72101220 | Tinplate of iron or non-alloy steel, of a width of >= 600 mm and of a thickness of < 0,5 mm, tinned [coated with a layer of metal containing, by weight, >= 97% of tin], not further worked than surface-treated
72107010 | Tinplate of a width of >= 600 mm and of a thickness of < 0,5 mm, tinned [coated with a layer of metal containing, by weight, >= 97% of tin], not further worked than varnished, and flat products plated or coated with chromium oxides or with chromium and chromium oxides, of iron or non-alloy steel, of a width of >= 600 mm, hot-rolled or cold-rolled "cold-reduced", varnished
72109040 | Flat-rolled products of iron or non-alloy steel, tinned and printed, of a width of >= 600 mm, hot-rolled or cold-rolled "cold-reduced"
72124020 | Tinplate of a width of < 600 mm and of a thickness of < 0,5 mm, tinned [coated with a layer of metal containing, by weight, >= 97% of tin], not further worked than varnished, and flat products plated or coated with chromium oxides or with chromium and chromium oxides, of iron or non-alloy steel, of a width of < 600 mm, hot-rolled or cold-rolled "cold-reduced", varnished
72124080 | Flat-rolled products of iron or non-alloy steel, of a width of < 600 mm, hot-rolled or cold-rolled "cold-reduced", painted, varnished or plastic coated (excl. tinplate, not further worked than varnished, and products plated or coated with chromium oxides or with chromium and chromium oxides, varnished)
72139120 | Bars and rods, hot-rolled, of the type used for tyre cord, smooth, of iron or non-alloy steel, in irregularly wound coils
72189920 | Semi-finished products of stainless steel, of circular cross-section or of cross-section other than square or rectangular, rolled or obtained by continuous casting
72202089 | Flat-rolled products of stainless steel, of a width of < 600 mm, not further worked than cold-rolled "cold-reduced", of a thickness of <= 0,35 mm and containing by weight < 2,5% nickel
72209020 | Flat-rolled products of stainless steel, of a width of < 600 mm, hot-rolled or cold-rolled "cold-reduced" and further worked, perforated
72221189 | Bars and rods of stainless steel, not further worked than hot-rolled, hot-drawn or extruded, of circular cross-section measuring < 80 mm and containing by weight < 2,5% nickel
72221990 | Bars and rods of stainless steel, not further worked than hot-rolled, hot-drawn or extruded, containing by weight < 2,5% nickel (excl. such products of circular cross-section)
72222011 | Bars and rods of stainless steel, of circular cross-section of a diameter >= 80 mm, simply cold-formed or cold-finished, containing by weight >= 2,5% nickel
72222019 | Bars and rods of stainless steel, of circular cross-section of a diameter >= 80 mm, simply cold-formed or cold-finished, containing by weight < 2,5% nickel
72222021 | Bars and rods of stainless steel, not further worked than cold-formed or cold-finished, of circular cross-section measuring >= 25 mm but < 80 mm and containing by weight >= 2,5% nickel
72222029 | Bars and rods of stainless steel, not further worked than cold-formed or cold-finished, of circular cross-section measuring >= 25 mm but < 80 mm and containing by weight < 2,5% nickel
72222031 | Bars and rods of stainless steel, not further worked than cold-formed or cold-finished, of circular cross-section measuring < 25 mm and containing by weight >= 2,5% nickel
72222039 | Bars and rods of stainless steel, not further worked than cold-formed or cold-finished, of circular cross-section measuring < 25 mm and containing by weight < 2,5% nickel
72222081 | Bars and rods of stainless steel, not further worked than cold-formed or cold-finished, containing by weight >= 2,5% nickel (excl. such products of circular cross-section)
72222089 | Bars and rods of stainless steel, not further worked than cold-formed or cold-finished, containing by weight < 2,5% nickel (excl. such products of circular cross-section)
72224010 | Angles, shapes and sections of stainless steel, only hot-rolled, only hot-drawn or only extruded
72224090 | Angles, shapes and sections of stainless steel, cold-formed or cold-finished and further worked, or not further worked than forged, or forged, or hot-formed by other means and further worked, n.e.s.
72230091 | Wire of stainless steel, in coils, containing by weight < 2,5% nickel, 13% to 25% chromium and 3,5% to 6% aluminium (excl. bars and rods)
72251100 | Flat-rolled products of silicon-electrical steel, of a width of >= 600 mm, grain-oriented
72254040 | Flat-rolled products of alloy steel other than stainless, of a width of >= 600 mm, not further worked than hot-rolled, not in coils, of a thickness of > 10 mm (excl. products of tool steel, high-speed steel or silicon-electrical steel)
72254060 | Flat-rolled products of alloy steel other than stainless, of a width of >= 600 mm, not further worked than hot-rolled, not in coils, of a thickness of >= 4,75 mm but <= 10 mm (excl. products of tool steel, high-speed steel or silicon-electrical steel)
72254090 | Flat-rolled products of alloy steel other than stainless, of a width of >= 600 mm, not further worked than hot-rolled, not in coils, of a thickness of < 4,75 mm (excl. products of tool steel, high-speed steel or silicon-electrical steel)
72255020 | Flat-rolled products of high-speed steel, of a width of >= 600 mm, not further worked than cold-rolled "cold-reduced"
72255080 | Flat-rolled products of alloy steel other than stainless, of a width of >= 600 mm, not further worked than cold-rolled "cold-reduced" (excl. products of high-speed steel or silicon-electrical steel)
72259900 | Flat-rolled products of alloy steel other than stainless, of a width of >= 600 mm, hot-rolled or cold-rolled "cold-reduced" and further worked (excl. plated or coated with zinc and products of silicon-electrical steel)
72261100 | Flat-rolled products of silicon-electrical steel, of a width of < 600 mm, hot-rolled or cold-rolled "cold-reduced", grain-oriented
72262000 | Flat-rolled products of high-speed steel, of a width of <= 600 mm, hot-rolled or cold-rolled "cold-reduced"
72281090 | Bars and rods of high-speed steel, not further worked than cold-formed or cold-finished, whether or not further worked, or hot-formed and further worked (excl. forged products, semi-finished products, flat-rolled products and hot-rolled bars and rods in irregularly wound coils)
72282099 | Bars and rods of silico-manganese stee, of square or other than rectangular cross-section, only cold-formed or cold-finished, incl. further worked, or hot-rolled and further worked (excl. hot-rolled, hot drawn or extruded, not further worked than clad, semi-finished products, flat-rolled products and hot-rolled bars and rods in irregularly wound coils)
72283020 | Bars and rods of tool steel, only hot-rolled, only hot-drawn or only extruded (excl. semi-finished products, flat-rolled products and hot-rolled bars and rods in irregularly wound coils)
72284010 | Bars and rods of tool steel, only forged (excl. semi-finished products, flat-rolled products and hot-rolled bars and rods in irregularly wound coils)
72285020 | Bars and rods of tool steel, only cold-formed or cold-finished (excl. semi-finished products, flat-rolled products and hot-rolled bars and rods in irregularly wound coils)
72285069 | Bars and rods of alloy steel, other than stainless steel, not further worked than cold-formed or cold-finished, of circular cross-section, of a diameter of < 80 mm (excl. of high-speed steel, silico-manganese steel, tool steel, articles of subheading 7228.50.40, semi-finished products, flat-rolled products and hot-rolled bars and rods in irregularly wound coils)
72285080 | Bars and rods of alloy steel, other than stainless steel, not further worked than cold-formed or cold-finished (excl. of circular cross-section and products of high-speed steel, silico-manganese steel, tool steel, articles of subheading 7228.50.40, semi-finished products, flat-rolled products and hot-rolled bars and rods in irregularly wound coils)
72299050 | Wire of steel containing by weight 0,9% to 1,1% of carbon, 0,5% to 2% of chromium and, if present, <= 0,5% of molybdenum, in coils (excl. rolled bars and rods)
73011000 | Sheet piling of iron or steel, whether or not drilled, punched or made from assembled elements
73041910 | Line pipe of a kind used for oil or gas pipelines, seamless, of iron or steel, of an external diameter of <= 168,3 mm (excl. products of stainless steel or of cast iron)
73041930 | Line pipe of a kind used for oil or gas pipelines, seamless, of iron or steel, of an external diameter of > 168,3 mm but <= 406,4 mm (excl. products of stainless steel or of cast iron)
73041990 | Line pipe of a kind used for oil or gas pipelines, seamless, of iron or steel, of an external diameter of > 406,4 mm (excl. products of stainless steel or of cast iron)
73042200 | Drill pipe, seamless, of stainless steel, of a kind used in drilling for oil or gas
73042400 | Casing and tubing, seamless, of a kind used for drilling for oil or gas, of stainless steel
73042910 | Casing and tubing of a kind used for drilling for oil or gas, seamless, of iron or steel, of an external diameter <= 168,3 mm (excl. products of cast iron)
73042930 | Casing and tubing of a kind used for drilling for oil or gas, seamless, of iron or steel, of an external diameter > 168,3 mm, but <= 406,4 mm (excl. products of cast iron)
73042990 | Casing and tubing of a kind used for drilling for oil or gas, seamless, of iron or steel, of an external diameter > 406,4 mm (excl. products of cast iron)
73043180 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of iron or non-alloy steel, cold-drawn or cold-rolled "cold-reduced" (excl. cast iron products, line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used for drilling for oil or gas and precision tubes)
73044100 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used for drilling for oil or gas)
73044983 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of stainless steel, of an external diameter of <= 168,3 mm (excl. cold-drawn or cold-rolled, line pipe of a kind used for oil or gas pipelines, and casing and tubing of a kind used for drilling for oil or gas and tubes)
73044985 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of stainless steel, of an external diameter of > 168,3 mm but <= 406,4 mm (excl. cold-drawn or cold-rolled, line pipe of a kind used for oil or gas pipelines, and casing and tubing of a kind used for drilling for oil or gas and tubes)
73044989 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of stainless steel, of an external diameter of > 406,4 mm (excl. cold-drawn or cold-rolled, line pipe of a kind used for oil or gas pipelines, and casing and tubing of a kind used for drilling for oil or gas and tubes)
73045181 | Precision tubes, seamless, of circular cross-section, of alloy steel other than stainless, cold-drawn or cold-rolled "cold-reduced" (excl. line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used for drilling for oil and tubes, and pipes and hollow profiles, straight and of uniform wall-thickness, containing by weight >= 0,9% but <= 1,15% carbon and >= 0,5% but <= 2% chrome, whether or not containing by weight <= 0,5% molybdenum)
73045189 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of alloy steel other than stainless, not cold-drawn or cold-rolled "cold-reduced" (excl. line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used for drilling for oil, precision tubes, and , pipes and hollow profiles, straight and of uniform wall-thickness, containing by weight >= 0,9% but <= 1,15% carbon and >= 0,5% but <= 2% chrome, whether or not containing by weight <= 0,5% molybdenum)
73045930 | Tubes, pipes and hollow profiles of alloy steel (excl. stainless), seamless, of circular cross-section (not cold-drawn or cold-rolled), straight and of uniform wall-thickness, containing by weight >= 0,9% but <= 1,15% carbon and >= 0,5% but <= 2% chromium, whether or not containing by weight <= 0,5% molybdenum (excl. tubes, pipes and hollow profiles of subheadings 7304 19 to 7304 29)
73045982 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of alloy steel other than stainless, of an external diameter of <= 168,3 mm (excl. cold-drawn or cold-rolled, line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used for drilling for oil or gas, and products of subheading 7304 59 30)
73045983 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of alloy steel other than stainless, of an external diameter of > 168,3 mm but <= 406,4 mm (excl. cold-drawn or cold-rolled, line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used for drilling for oil or gas, and products of subheading 7304 59 30)
73045989 | Tubes, pipes and hollow profiles, seamless, of circular cross-section, of alloy steel other than stainless, of an external diameter of > 406,4 mm (excl. cold-drawn or cold-rolled, line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used for drilling for oil or gas, and products of subheading 7304 59 30)
73049000 | Tubes, pipes and hollow profiles, seamless, of non-circular cross-section, of iron or steel (excl. products of cast iron)
73051100 | Line pipe of a kind used for oil or gas pipelines, having circular cross-sections and an external diameter of > 406,4 mm, of iron or steel, longitudinally submerged arc welded
73051200 | Line pipe of a kind used for oil or gas pipelines, having circular cross-sections and an external diameter of > 406,4 mm, of iron or steel, longitudinally arc welded (excl. products longitudinally submerged arc welded)
73052000 | Casing of a kind used in drilling for oil or gas, having circular cross-sections and an external diameter of > 406,4 mm, of flat-rolled products of iron or steel
73061900 | Line pipe of a kind used for oil or gas pipelines, welded, of flat-rolled products of iron or steel, of an external diameter of <= 406,4 mm (excl. products of stainless steel or of cast iron)
73062100 | Casing and tubing of a kind used in drilling for oil or gas, welded, of flat-rolled products of stainless steel, of an external diameter of <= 406,4 mm
73062900 | Casing and tubing of a kind used in drilling for oil or gas, welded, of flat-rolled products of iron or steel, of an external diameter of <= 406,4 mm (excl. products of stainless steel or of cast iron)
73069000 | Tubes, pipes and hollow profiles "e.g., open seam, riveted or similarly closed", of iron or steel (excl. of cast iron, seamless or welded tubes and pipes and tubes and pipes having internal and external circular cross-sections and an external diameter of > 406,4 mm)
73071910 | Tube or pipe fittings of cast iron (excl. of non-malleable)
73071990 | Cast tube or pipe fittings of steel
73072100 | Flanges of stainless steel (excl. cast products)
73072210 | Sleeves, of stainless steel, threaded (excl. cast products)
73072290 | Elbows and bends, of stainless steel, threaded (excl. cast products)
73072310 | Butt welding elbows and bends of stainless steel (excl. cast products)
73072910 | Threaded tube or pipe fittings of stainless steel (excl. cast products, flanges, elbows, bends and sleeves)
73072980 | Tube or pipe fittings of stainless steel (excl. cast, threaded, butt welding fittings and flanges)
73079100 | Flanges of iron or steel (excl. cast or stainless products)
73079210 | Sleeves of iron or steel, threaded (excl. cast or of stainless steel)
73079290 | Elbows and bends, of iron or steel, threaded (excl. cast or of stainless steel)
73079311 | Butt welding elbows and bends, of iron or steel, with greatest external diameter <= 609,6 mm (excl. cast iron or stainless steel products)
73079319 | Butt welding fittings of iron or steel, with greatest external diameter <= 609,6 mm (excl. cast iron or stainless steel products, elbows, bends and flanges)
73079391 | Butt welding elbows and bends, of iron or steel, with greatest external diameter > 609,6 mm (excl. cast iron or stainless steel products)
73079399 | Butt welding fittings of iron or steel, with greatest external diameter > 609,6 mm (excl. cast iron or stainless steel products, elbows, bends and flanges)
73079910 | Threaded tube or pipe fittings, of iron or steel (excl. cast iron or stainless steel products, flanges, elbows, bends and sleeves)
73079980 | Tube or pipe fittings, of iron or steel (excl. of cast iron or stainless steel, threaded, butt welding fittings, and flanges)
73110013 | Containers of iron or steel, seamless, for compressed or liquefied gas, for a pressure >= 165 bar, of a capacity >= 20 l to <= 50 l (excl. containers specifically constructed or equipped for one or more types of transport)
73181100 | Coach screws of iron or steel
73181300 | Screw hooks and screw rings, of iron or steel
73181410 | Self-tapping screws, of stainless steel (excl. wood screws)
73181535 | Screws and bolts, of stainless steel "whether or not with their nuts and washers", without heads (excl. screws and bolts for fixing railway track construction material)
73181548 | Screws and bolts, of iron or steel other than stainless "whether or not with their nuts and washers", without heads, with a tensile strength of >= 800 MPa (excl. screws and bolts for fixing railway track construction material)
73181568 | Hexagonal-socket head screws and bolts, of iron or steel other than stainless "whether or not with their nuts and washers" (excl. wood screws, self-tapping screws and screws and bolts for fixing railway track construction material)
73181575 | Hexagon screws and bolts, of stainless steel "whether or not with their nuts and washers" (excl. with socket head, wood screws, self-tapping screws and screws and bolts for fixing railway track construction material)
73181588 | Hexagon screws and bolts, of iron or steel other than stainless "whether or not with their nuts and washers", with a tensile strength of => 800 MPa (excl. with socket head, wood screws, self-tapping screws and screws and bolts for fixing railway track construction material)
73181595 | Screws and bolts, of iron or steel "whether or not with their nuts and washers", with heads (excl. with slotted, cross-recessed or hexagonal head; wood screws, self-tapping screws and screws and bolts for fixing railway track construction material, screw hooks and screw rings)
73181631 | Blind rivet nuts of stainless steel
73181639 | Nuts of stainless steel (excl. blind rivet nuts)
73181640 | Blind rivet nuts of iron or steel other than stainless
73181660 | Self-locking nuts of iron or steel other than stainless
73181692 | Nuts of iron or steel other than stainless, with an inside diameter <= 12 mm (excl. blind rivet nuts and self-locking nuts)
73181699 | Nuts of iron or steel other than stainless, with an inside diameter > 12 mm (excl. blind rivet nuts and self-locking nuts)
73181900 | Threaded articles, of iron or steel, n.e.s.
73182100 | Spring washers and other lock washers, of iron or steel
73182200 | Washers of iron or steel (excl. spring washers and other lock washers)
73182400 | Cotters and cotter pins, of iron or steel
73182900 | Non-threaded articles, of iron or steel
73269040 | Pallets and similar platforms for handling goods, of iron or steel
73269050 | Reels for cables, piping and the like, of iron or steel
73269092 | Articles of iron or steel, open-die forged, n.e.s.
73269094 | Articles of iron or steel, closed-die forged, n.e.s.
73269096 | Sintered articles of iron or steel, n.e.s.
Not placed in the text
These amendments could not be matched to a place in the proposal, so they are not shown in it.
Amendment 1 · no plenary vote matched
Placed by similar wording: the amendment quotes the proposal slightly differently.
Why: one row of the amendment quote wording no paragraph of the proposal matches; the rest is applied. Location: Recital 1.
Amendment 29 · no plenary vote matched
Placed by its location in the proposal.
Why: location Proposal for a regulation Recital 17 a (new) is not one the proposal can be searched for.
Amendment 30 · no plenary vote matched
Placed by its location in the proposal.
Why: location Proposal for a regulation Recital 17 b (new) is not one the proposal can be searched for.
Amendment 37 · no plenary vote matched
Placed by its location in the proposal.
Why: location Article 4 a – paragraph 1 (new) not found in the proposal. Location: Article 4 a – paragraph 1 (new).
Amendment 38 · no plenary vote matched
Placed by its location in the proposal.
Why: location Article 4 a – paragraph 2 (new) not found in the proposal. Location: Article 4 a – paragraph 2 (new).
Amendment 39 · no plenary vote matched
Placed by its location in the proposal.
Why: location Article 4 a – paragraph 3 (new) not found in the proposal. Location: Article 4 a – paragraph 3 (new).
Amendment 40 · no plenary vote matched
Placed by its location in the proposal.
Why: location Article 4 a – paragraph 4 (new) not found in the proposal. Location: Article 4 a – paragraph 4 (new).
Amendment 41 · no plenary vote matched
Placed by its location in the proposal.
Why: location Proposal for a regulation Article 4 a – paragraph 5 (new) is not one the proposal can be searched for.
Parliament’s document as published (the amendments as tables) →