Zum Inhalt springen
EU Parl Watch

Entwurf eines Berichts, 3. März 2026

On the proposal for a Council decision on establishing the Specific Programme implementing Horizon Europe - the Framework Programme for Research and Innovation for the period 2028-2034, laying down the rules for participation and dissemination under that Programme, and repealing Decision (EU) 2021/764

Dokument ITRE-PR-781461 · (COM(2025)0544 – C100218/2025 – 2025/0544(CNS))

Committee on Industry, Research and Energy · Berichterstattung: René Repasi

Auf der Website des Parlaments PDF Word

KI: In Kürze

This is the rapporteur's draft report on the proposed Council decision establishing the Specific Programme implementing Horizon Europe for 2028-2034, which also lays down participation and dissemination rules and repeals Decision (EU) 2021/764. The draft approves the Commission proposal as amended and calls on the Commission and Council to align their texts with Parliament's amendments. It amends the recitals and articles to keep the Specific Programme strictly implementing, to anchor excellence, frontier research and investigator-driven research, and to strengthen the ERC, MSCA and EIC. It adds rules on European Partnerships, work programmes, research infrastructures, committee procedures, and review and evaluation, and creates a new sectoral plan instrument under the ERC Scientific Council.

Standpunkt. The rapporteur proposes to approve the Commission proposal as amended, aligning the legal architecture with the Treaty framework, separating Horizon Europe governance from the European Competitiveness Fund, and strengthening the ERC, MSCA and EIC.

Kernpunkte

  1. The Specific Programme should remain strictly limited to its implementing function and not modify, supplement or reinterpret the essential elements, objectives and governance arrangements of the Horizon Europe Regulation.
  2. The Commission should adopt immediately applicable implementing acts where duly justified imperative grounds of urgency relating to work programmes so require.
  3. Excellence should remain the guiding principle, with support for investigator-driven frontier research, bottom-up actions and high-risk, high-gain projects.
  4. The Specific Programme should promote equality, diversity and inclusion, mainstream gender, and foster international cooperation based on mutual benefit and protection of academic freedom and research security.
  5. Work programmes should indicate the budget allocated to each action and mission and an indicative timetable, set a single funding rate per action, and include an evaluation procedure.
  6. European Partnerships should follow a clear lifecycle, be selected competitively only in the most strategically relevant cases, include independent scientific advisory mechanisms, and launch their final calls before 31 December 2034.
  7. The Commission should submit a consolidated report on the performance, added value and portfolio coherence of all European Partnerships to Parliament and the Council every two years.
  8. The ERC President should be appointed after a public hearing before Parliament, serve a four-year renewable term, and work mainly in Brussels with adequate resources.
  9. The ERC Scientific Council should have 22 members with gender and generational balance, four-year renewable terms, and three Vice-Presidents with administrative support.
  10. The ERC Scientific Council may invite research institutions to develop six-year sectoral plans with a pre-allocated budget, approved through a dedicated expert peer-review panel.
  11. The EIC Board should establish the draft work programme recommendation, draft investment guidelines, and appoint Programme Managers, with members serving four-year renewable terms and the President consulted with Parliament.
  12. The Commission should carry out interim and final evaluations, make conclusions public and present them to Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions, and assess establishing the ERC as an independent Union agency.

Wen es betrifft

  • Researchers and research organisations, who gain support for frontier research, mobility, careers and sectoral plans.
  • European Partnerships, which must meet selection criteria, governance and monitoring rules and launch final calls before 31 December 2034.
  • The European Research Council, whose governance, President and Scientific Council rules are amended.
  • The European Innovation Council, whose Board composition, terms and Programme Manager rules are amended.
  • The Commission, which must adopt implementing acts, report on partnerships and carry out evaluations.

Zahlen und Fristen

  • 22 independent scientists, engineers and scholars compose the ERC Scientific Council.
  • Four years is the term of office for the ERC President, renewable once.
  • Four years is the term of office for ERC Scientific Council members, renewable once.
  • 15 to 20 independent high-level individuals compose the EIC Board.
  • Four years is the term of office for EIC Board members, renewable once.
  • Four years is the maximum term of the EIC Board President, extendable once for up to 4 years.
  • Three years is the maximum term of EIC Programme Managers, renewable once.
  • 31 December 2034 is the deadline for European Partnerships to launch their final calls.

Rechtsgrundlage. Article 182(4) of the Treaty on the Functioning of the European Union.

Von KI aus dem Volltext geschrieben · jede Zahl stammt aus dem Text · ¶ öffnet den Absatz · 5. Okt. 2026 · KI-Texte gibt es bisher nur auf Englisch. · Problem melden

Volltext

Den Wortlaut des Dokuments zeigt diese Website bisher nur auf Englisch. Deutsche Fassung auf der Website des Parlaments →

Der Vorschlag der Kommission COM(2025)0544 in der auf EUR-Lex veröffentlichten Fassung; eingearbeitet sind die 126 Änderungsanträge dieses Dokuments; 34 davon konnten nicht zugeordnet werden.

249 Absätze, 91 geändert, 92 Änderungsanträge übernommen, 34 nicht zugeordnet

Ausgangstext: COM(2025)0544 auf EUR-Lex →

gestrichen: Durchgestrichene Wörter werden aus dem Vorschlag gestrichen, eingefügt: markierte Wörter eingefügt; ein Strich am Rand kennzeichnet einen geänderten Absatz.

Zu einer Änderung springen (92)
Begründung 10 Absätze

EXPLANATORY MEMORANDUM

CONTEXT OF THE PROPOSAL

Reasons for and objectives of the proposal

The objective of this proposal is to implement Horizon Europe, the EU Framework Programme for Research and Innovation 2028-2034, and the relevant research and innovation parts of the European Competitiveness Fund. This proposal is fully consistent with the regulations it implements as well as the Multiannual Financial Framework for 2028-2034.

The Specific Programme established by this Council Decision is based on Article 182(4) Treaty on the Functioning of the European Union (TFEU) and.

As set out in Article 182(4) of the TFEU, the Framework Programme shall be implemented through Specific Programmes that set out detailed rules for implementing it, fix its duration and provide for the means deemed necessary. Horizon Europe will be implemented through the Specific Programme established by this Council Decision.

For more information on the overall Horizon Europe proposal, see the explanatory memorandum of the basic act of the Framework Programme [(proposal for a regulation establishing 'Horizon Europe – the Framework Programme for Research and Innovation and laying down its rules for participation and dissemination').]

OTHER ELEMENTS

Detailed explanation of the specific provisions of the proposal

With the exception of the support for the integration of the knowledge triangle – higher education, research and innovation, and business – across the Union, the Specific Programme provisions follow the structure of the [proposal for a regulation establishing 'Horizon Europe – the Framework Programme for Research and Innovation and laying down its rules for participation and dissemination'.]

Proposal for a COUNCIL DECISION

On establishing the Specific Programme implementing Horizon Europe - the Framework Programme for Research and Innovation for the period 2028-2034, laying down the rules for participation and dissemination under that Programme, and repealing Decision (EU) 2021/764

(Text with EEA relevance)

THE COUNCIL OF THE EUROPEAN UNION,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 182(4) thereof,

Having regard to the proposal from the European Commission,

After transmission of the draft legislative act to the national parliaments,

Having regard to the opinion of the European Parliament,

Having regard to the opinion of the European Economic and Social Committee,

Having regard to the opinion of the Committee of the Regions,

Acting in accordance with a special legislative procedure,

Whereas:

(1)In accordance with Article 182(3) of the Treaty on the Functioning of the European Union (TFEU), Horizon Europe – the Framework Programme for Research and Innovation for the period 2028-2034 (‘Horizon Europe’), established by Regulation XXX [reference to the Horizon Europe Regulation] of the European Parliament and of the Council, is to be implemented through Specific Programmes which define the detailed rules for their implementation, fix their duration and provide for the means deemed necessary.

(2)eingefügt: (2) Regulation XXX[reference to the Horizon Europe Regulation] sets out the general and specific objectives of Horizon Europe, the structure and the broad lines of activities to be carried gestrichen: out,eingefügt: out. gestrichen: whileeingefügt: By eingefügt: contrast, in accordance with Article 182(3) TFEU, this Specific Programme implementing Horizon Europe (the ‘Specific Programme’) should gestrichen: defineeingefügt: remain eingefügt: strictly limited to its implementing function and therefore should not modify, supplement or reinterpret the gestrichen: operationaleingefügt: essential eingefügt: elements, objectives and gestrichen: theeingefügt: governance gestrichen: activitieseingefügt: arrangements gestrichen: whicheingefügt: established gestrichen: areeingefügt: in gestrichen: specificeingefügt: Regulation gestrichen: toeingefügt: XXX gestrichen: partseingefügt: [reference gestrichen: ofeingefügt: to eingefügt: the Horizon gestrichen: Europe.eingefügt: Europe eingefügt: Regulation]. The provisions on implementation set out in Regulation XXX eingefügt: [reference to the Horizon Europe Regulation] apply fully to the Specific Programme.

(3)The Board of Governors of the Joint Research Centre (JRC) set up by Commission Decision 96/282/Euratom has been consulted on the scientific and technological content of the Specific Programme on the non-nuclear direct actions of the JRC.

(4)This Council Decision lays down an indicative financial envelope for the Specific Programme.

(5)In order to ensure uniform conditions for the implementation of the Specific Programme through work programmes, implementing powers should be conferred on the Commission. Those powers should be exercised in accordance with Regulation (EU) No 182/2011 of the European Parliament and of the Council.

(6)The advisory and examination procedures set out in Regulation (EU) No 182/2011 of the European Parliament and of the Council should be used for the adoption of the work programmes given the important financial implications of the Specific Programme.

(6a)eingefügt: The Commission should adopt immediately applicable implementing acts where, in duly justified cases relating to the adoption of the work programmes, imperative grounds of urgency so require.

(7)The Specific Programme replaces the Horizon Europe Specific Programme established by Council Decision (EU) No 2021/764. Council Decision (EU) 2021/764 should therefore be repealed.

(8)eingefügt: (8) The Specific Programme should be implemented in compliance with the principle of the rule of law and the rights and principles set out in the Charter of Fundamental Rights of the European Union and be in line with the international obligations of the Union and the Member States arising from the international instruments to which they are party, including Human rights instruments such as the eingefügt: Convention for the Protection of Human Rights and Fundamental Freedoms and the UN Convention on the Rights of Persons with disabilities.eingefügt: It should also give due regard to other relevant instruments, such as the European Charter for Researchers.

(8a)eingefügt: The Report of Commission Expert Group on the interim evaluation of Horizon Europe of 6 December 2024 (the ‘Heitor report’) underlines the need for more self-governance in Horizon Europe through the establishment of dedicated high-level councils, in particular a European technology and industrial competitiveness council and a European societal challenges council. Such a reinforced governance structure should be accompanied by less prescriptive calls for proposals, in order to promote scientific excellence, flexibility, and greater impact across the Programme.

(8b)eingefügt: The report on the future of the internal market commissioned by the European Council of April 2024, entitled ‘Much more than a market’ (the ‘Letta report’) proposes the establishment of a “Fifth Freedom” to encompass research, innovation and education as a new dimension of the internal market as the four original freedoms that guarantee the free movement of goods, capital, services, and people are fundamentally based on 20th century theoretical principles.

(8c)eingefügt: Excellence should remain the guiding principle of the Specific Programme. Research and innovation activities supported under the Regulation XXX [reference to the Horizon Europe Regulation] should be selected on the basis of excellence, and they should enable ambitious, high-quality projects across all fields of science, technology, social sciences and humanities, and should support breakthrough ideas with the potential to generate transformative advances. Particular attention should be given to attracting and retaining outstanding talents at all stages of their careers, including early-stage researchers, fostering open and competitive access to funding, preventing brain drain and promoting brain gain across the Union and associated countries.

(8d)eingefügt: The Specific Programme should establish clear operational objectives, in order to maximise the scientific, technological and societal impact of Union funding. It should also preserve and strengthen investigator-driven frontier research, including through support for bottom-up research actions not predetermined by thematic priorities, to fully tap into the potential of high-risk, high-gain projects. Transformative innovation often arises from unexpected scientific breakthroughs and cannot always be anticipated, predefined, or strategically planned. Ensuring continued support for excellence-based, investigator-initiated research is therefore essential to sustaining the Union’s global competitiveness and long-term innovation capacity.

HAS ADOPTED THIS DECISION:

Chapter I

General Provisions

Article 1 Subject matter

1.This Decision establishes the Specific Programme implementing Horizon Europe - the Framework Programme for Research and Innovation for the period of the multiannual financial framework (the ‘MFF’) 2028-2034 (the ‘Specific Programme’) as set out in Article 1 (2) point (a) of Regulation XXX [reference to the Horizon Europe Regulation].

2.This Decision lays down the budget of the Specific Programme for the period 2028-2034, the rules for implementation of the Specific Programme and the activities to be carried out under the Specific Programme.

3.The definitions, objectives, structure and budget of Horizon Europe - the Framework Programme for Research and Innovation set out in Regulation XXX [reference to the Horizon Europe Regulation] also apply to the Specific Programme.

Article 2 Operational objectives

1.eingefügt: 1. The Specific Programme shall contribute to the general and specific objectives set out in Article 3 of Regulation XXX [reference to the Horizon Europe gestrichen: Regulation](.eingefügt: Regulation].

2.The Specific Programme has the following operational objectives:

(a)foster the production of high-quality scientific research and world-leading research institutions;

(b)eingefügt: (b) support gestrichen: theeingefügt: structured mobility and training and career development of researchers;eingefügt: at all stages of their careers, with a particular focus on early-career researchers;

(c)eingefügt: (c) strengthen Europe’s capacity to attract eingefügt: retain and gestrichen: retaineingefügt: interact eingefügt: with excellent researchers gestrichen: ineingefügt: from gestrichen: Europe;eingefügt: within and outside the Union;

(d)eingefügt: (d) foster eingefügt: cross-sectoral collaboration and multidisciplinarity, including gestrichen: witheingefügt: the eingefügt: systematic and comprehensive participation of Social Sciences and Humanities (SSH) to generate new knowledge;eingefügt: address societal challenges, enhance the societal relevance and uptake of innovation, and provide information for evidence-based policymaking;

(e)eingefügt: (e) enhance knowledge valorisation;eingefügt: by facilitating the effective transfer of research results into economic, social, cultural, and policy impact, while safeguarding open science principles and the public value of research;

(f)eingefügt: (f) connect eingefügt: develop and gestrichen: developeingefügt: strengthen research and technology infrastructures across the European Research Area (ERA) eingefügt: ensuring open access to gestrichen: provideeingefügt: them eingefügt: and fostering transnational gestrichen: access;eingefügt: synergies across domains and sectors;

(g)eingefügt: (g) support the eingefügt: development of disruptive innovation and scientific breakthrough to stimulate the creation and scale-up of deep tech and innovative start-ups;

(h)gestrichen: foster technology uptake and demonstration of disruptive innovation;

(i)gestrichen: increasingeingefügt: (i) eingefügt: promote scientific excellence across the eingefügt: Union while contributing to the reduction of disparities in research and innovation performance, including by supporting measures aimed at enhancing the participation eingefügt: and integration of research organisation from gestrichen: the wideningeingefügt: Member gestrichen: countrieseingefügt: States and gestrichen: transitioneingefügt: associated countries gestrichen: referredeingefügt: identified gestrichen: toeingefügt: pursuant gestrichen: ineingefügt: to Article 19 of Regulation XXX [reference to the Horizon Europe Regulation];eingefügt: with a view to enhancing cohesion and reinforcing the ERA as a whole;

(j)eingefügt: (j) foster open science eingefügt: practices and ensure gestrichen: visibility toeingefügt: where gestrichen: theeingefügt: possible, public eingefügt: transparent, non-discriminatory and open access to gestrichen: resultseingefügt: peer-reviewed gestrichen: whereeingefügt: scientific gestrichen: possible.eingefügt: publications, research data and other research outputs following the principle 'as open as possible, as closed as necessary';

3.The Specific Programme shall also address collaborative research activities under the policy windows of the European Competitiveness Fund.

Article 3 Budget

1.In accordance with Article 6(1) of Regulation XXX [reference to the Horizon Europe Regulation], the indicative financial envelope for the implementation of the Specific Programme for the period 2028 to 2034 is set at be EUR 175 002 000 000 in current prices.

2.The amount referred to in paragraph 1 of this Article shall be distributed among the parts as set out with Article 6(2) of Regulation XXX [reference to the Horizon Europe Regulation].

Article 4 Work programmes

1.The Specific Programme shall be implemented by the work programmes referred to in paragraph 2 of this Article in accordance with Article 110 of Regulation (EU, Euratom) 2024/2509. Without prejudice to the first subparagraph, the work programmes may in particular set out:

(a)gestrichen: actionseingefügt: (a) gestrichen: andeingefügt: an eingefügt: indication of the associated budget;eingefügt: allocated to each action and mission and an indicative implementation timetable;

(b)eingefügt: (b) the applicable eligibility and award criteria;eingefügt: among those set out in the Regulation XXX [reference to the Horizon Europe Regulation];

(c)eingefügt: (c) a single gestrichen: co-financingeingefügt: funding rate per action;

(d)gestrichen: rules applicable to actions concerning more than one specific objective;

(e)eingefügt: (e) actions to which specific rules apply, in particular on gestrichen: ownership ofeingefügt: research gestrichen: results,eingefügt: security, valorisation and dissemination, transfer and licensinggestrichen: as well as access rights to results.

2.The Commission shall adopt separate work programmes, by means of implementing acts, for the implementation of actions under the following components, as set out in Article 1(3):

(a)eingefügt: (a) the European Research Council (ERC), eingefügt: and Sectoral Plan, for which the draft work programme shall be established by the ERC Scientific Council under Article 7(9)(a)(ii), in accordance with Article gestrichen: 18(3).eingefügt: 18(3) eingefügt: and be based solely on the award criteria of excellence. The Commission shall depart from the draft work programme established by the ERC Scientific Council only in accordance with Article 7(4), second subparagraph; in that case, the Commission shall adopt the work programme by means of an implementing act in accordance with Article 18(4); the Commission shall eingefügt: inform the ERC Scientific Council, the European Parliament and the Council of its duly gestrichen: motivateeingefügt: motivated gestrichen: that;eingefügt: departure from the draft work programme established by the ERC Scientific Council;

(b)eingefügt: (b) the European Innovation Council (EIC), for which the work programme shall be prepared following the gestrichen: adviceeingefügt: recommendation of the EIC Board under Article 12(1)(b), in accordance with Article 18(4);

(c)gestrichen: Marie Sklodowska-Curie Actions (MSCA), global societal challenges, EU Missions, New European Bauhaus Facility, innovation ecosystems, reforming and enhancing the European R&I system, research and technology infrastructures, widening participation and spreading excellence, in accordance with Article 18(4);

(d)the JRC, for which the multi-annual work programme shall take into account the opinion provided by the Board of Governors of the JRC referred to in Commission Decision 96/282/Euratom.

3.gestrichen: The research and innovation activities referred to under the policy windows described in Chapters IV to VII of Regulation XXX [reference to the European Competitiveness Fund Regulation]shall be included in a specific dedicated part of the work programmes implementing the corresponding specific objectives referred to in Article 3(2), points (a) to (d) of Regulation XXX [reference to the European Competitiveness Fund Regulation]. Those work programmes shall be adopted in accordance with Articles 15 and 84 of Regulation XXX [reference to the European Competitiveness Fund Regulation].

Article 5 European Partnerships

1.eingefügt: 1. European Partnerships shall follow a clear lifecycle approach, including their selection, implementation and monitoring, and transitioning out of Regulation XXX [reference to the Horizon Europe gestrichen: Regulation] on the basis of the following:eingefügt: Regulation].

(a)eingefügt: (a) European Partnerships shall be selected following a competitive, open, non-discriminatory, and transparent procedure, on the basis of areas proposed by the gestrichen: Commission.eingefügt: Commission, eingefügt: and established only in the most strategically relevant cases where Union action alone or other forms of support under the Specific Programme cannot achieve the desired objectives in addressing research and innovation challenges. In addition the requirements set out in Article 11 of Regulation (EU) Regulation XXX [reference to the Horizon Europe Regulation], candidate partnerships shall comply with the following selection criteria:

I.eingefügt: i. portfolio relevance: overall consistency eingefügt: coherence and gestrichen: coherenceeingefügt: complementarity of the partnership portfolio shall be ensured, provided that candidates meet all selection criteria and demonstrate relevance as part of a strategic portfolio of actions;

II.critical mass: the partnerships’ budget (Union and partners’ contributions) shall match their duration, ensuring sufficient resources to fund at least one substantial call per year, each comparable in size to an average Horizon Europe call in the relevant thematic area;

III.partners’ composition: unless duly justified, the participation of public entities from at least five Member States and private entities representing substantial segments of their respective ecosystems is required, ensuring a broad and balanced involvement of key stakeholders;

IV.pan-European relevance: partnerships shall have pan-European relevance, reflected in a balanced geographic distribution of partners among Member States;

V.eingefügt: v. mission-orientation: partnerships shall formulate clear, measurable, time-bound objectives gestrichen: withineingefügt: that gestrichen: theeingefügt: reflect gestrichen: durationeingefügt: industrial gestrichen: ofeingefügt: competitiveness gestrichen: Horizoneingefügt: and gestrichen: Europeeingefügt: societal eingefügt: impact goals within their duration that will inform monitoring, assessment, and evaluation exercises;

VI.gestrichen: businesseingefügt: vi. eingefügt: implementation plan: partners shall develop gestrichen: aeingefügt: an gestrichen: businesseingefügt: implementation plan ex-ante, including a set of key performance indicators to track progress eingefügt: dissemination and eingefügt: valorisation activities and a forward-looking transition strategy, including actions for phasing out from Horizon Europe funding;

VII.eingefügt: vii. openness and transparency: partnerships shall demonstrate openness eingefügt: transparency and gestrichen: transparencyeingefügt: non-discrimination regarding the identification of priorities and objectives – including expected results and impacts – and the engagement of partners and stakeholders across the entire value chain and from diverse sectors, backgrounds, and disciplines, including eingefügt: where relevant eingefügt: the systematic integration of SSH across their Strategic Research and Innovation Agendas (SRIAs) and including relevant international ones without affecting European competitiveness;

VIII.legacy: in cases where candidate partnerships build on predecessor initiatives, the efficiency, effectiveness and impact of previous partnerships shall be demonstrated;

IX.throughout their implementation, European Partnerships shall ensure:

X.gestrichen: internaleingefügt: i. transparent governance arrangements and gestrichen: internal rules, eingefügt: based on common guidelines, including codes of conduct, eingefügt: and conflict-of-interest rules that ensure eingefügt: accountability and public oversight and their functioning in an open and transparent manner;

XI.continuous openness of the initiative through clear and transparent accession and exit criteria, including through open calls to potential new partner organisations

XII.eingefügt: iii. flexibility through timely revisions of key documents such as the gestrichen: Strategic Research and Innovation Agendas (SRIAs)eingefügt: SRIAs and transition strategies, adapted as necessary to ensure relevance and feasibility;

XIII.eingefügt: iv. continuous monitoring shall include tracking progress towards a set of partnership-specific common indicators including partner contributions, cost efficiency, and openness to new partners. Partnership-specific common indicators shall build on the common indicators as defined under Regulation XXX [reference to Performance Regulation] and set out in the biennial monitoring reports on the performance of European partnerships under Horizon Europe gestrichen: 2021-2027;eingefügt: 2021-2027. Every two years, the Commission shall submit a consolidated report on the performance, added value and portfolio coherence of all European Partnerships to the European Parliament and to the Council;

XIV.eingefügt: v. European Partnerships shall launch their final calls before 31 December 2034. European Partnerships shall determine and implement the best mode of transition. Taking into account the transition strategies prepared ex-ante, partnerships shall undergo an independent assessment determining whether their objectives have been met, the suitability of the partnership approach, and their continued relevance for the Union’s policy priorities. This assessment should include a recommendation for the most effective policy intervention mode for any future actions.eingefügt: It shall be transmitted to the European Parliament and to the Council.

(b)In the absence of renewal, European Partnerships shall implement appropriate measures based on their phasing-out actions identified in their transition strategies.

Chapter II

Excellent Science

Article 6 European Research Council

1.The Commission shall establish a European Research Council (the ‘ERC’) to implement the actions under Part I ‘Excellent Science’ of Regulation XXX [reference to the Horizon Europe Regulation] which relate to the ERC. The ERC shall succeed the European Research Council set up by Council Decision (EU) 2021/764.

2.The ERC shall be composed of the independent ERC Scientific Council provided for in Article 7 and the ERC dedicated implementation structure provided for in Article 8.

3.The ERC Scientific Council shall have a President (‘ERC President’) who shall be chosen from among senior and internationally respected scientists.

4.eingefügt: 4. The ERC President shall be appointed by the Commission following a transparent recruitment process involving an independent dedicated search committee. The recruitment process and the candidate selected shall have the approval of the ERC Scientific Council. eingefügt: Prior to their appointment, the selected candidate shall appear at a public hearing before the European Parliament. The eingefügt: Commission shall take due account of the views expressed by the European Parliament. The term of office of the ERC President shall be limited to gestrichen: twoeingefügt: four years, gestrichen: extendable once for up to twoeingefügt: renewable gestrichen: years.eingefügt: once.

5.eingefügt: 5. The ERC President shall chair the ERC Scientific Council and ensure the leadership of the ERC Scientific Council and its liaison with the ERC dedicated implementation structure and shall represent the ERC Scientific Council in the world of gestrichen: science.eingefügt: science as well as in its interactions with the Union institutions.

6.The President shall be assisted by three Vice-Presidents chosen by the Scientific Council from among its members.

7.eingefügt: 7. The ERC shall operate according to its core principles which are scientific excellence, open science, autonomy, efficiency, effectiveness, transparency, accountability and research gestrichen: integrity, while respecting the corporate policies of the European Commission.eingefügt: integrity. It shall ensure continuity with ERC actions conducted under Council Decision (EU) 2021/764.

8.eingefügt: 8. Through its activities, the ERC shall support, in a bottom-up manner, frontier research carried out across all fields by principal investigators and their teams in competition at European level, including gestrichen: early-stageeingefügt: early career researchers.eingefügt: Financing decisions shall be based solely on the criterion of scientific excellence. In line with its mission, the ERC shall support ‘high risk/high gain’ research, including projects employing novel research methods. It shall develop agile and transparent procedures tailored to this approach to science funding, while respecting the need for accountability for the use of public funding.

9.The Commission shall act as the guarantor of the autonomy and integrity of the ERC and shall ensure the proper execution of the tasks entrusted to it.

10.eingefügt: 10. The Commission shall ensure that the implementation of ERC actions is in accordance with the principles set out in paragraph 7 of this Article as well as with the overall strategy gestrichen: foreingefügt: procedures eingefügt: and positions of the ERC, referred to in Article gestrichen: 7(4)(a),eingefügt: 7(4), established by the ERC Scientific Council.

Article 7 ERC Scientific Council

1.eingefügt: 1. The ERC Scientific Council shall be composed of 22 independent scientists, engineers and scholars of the highest repute and with the appropriate expertise, gestrichen: including botheingefügt: ensuring gestrichen: womeneingefügt: gender and gestrichen: men in different age groups, andeingefügt: generational gestrichen: ensuringeingefügt: balance, a diversity of research areas and a variety of geographical origins. They shall act in their personal capacity, independent of extraneous interests. The members of the ERC Scientific Council shall be appointed by the Commission, following an independent and transparent procedure for their identification agreed with the ERC Scientific Council, including an open consultation of the scientific community and gestrichen: a report to the European Parliament and the Council.

2.eingefügt: 2. The term of office for members of the ERC Scientific Council shall be gestrichen: upeingefügt: limited to four years, gestrichen: extendableeingefügt: renewable once gestrichen: by up to two years, based on a rotating system which shall ensure the continuity of the work of the ERC Scientific Council.

3.eingefügt: 3. The ERC Scientific Council shall elect from amongst its members three Vice-Presidents who shall assist the ERC President in its representation and the organisation of its work. They shall hold the title of ERC Vice-President. gestrichen: The members of the ERC Scientific Councileingefügt: Support shall be gestrichen: compensatedeingefügt: provided gestrichen: foreingefügt: to the gestrichen: tasks they perform by means ofeingefügt: three gestrichen: aneingefügt: Vice-Presidents gestrichen: honorariumeingefügt: to gestrichen: and,eingefügt: ensure gestrichen: whereeingefügt: adequate gestrichen: appropriate,eingefügt: local gestrichen: reimbursementeingefügt: administrative gestrichen: ofeingefügt: assistance gestrichen: traveleingefügt: at gestrichen: andeingefügt: their gestrichen: subsistenceeingefügt: home gestrichen: expenses.eingefügt: institutions.

4.The ERC Scientific Council shall exercise its tasks solely and exclusively within the scope and for the purposes of the Specific Programme. In that context, it shall establish:

(a)the overall strategy for the ERC;

(b)the draft work programme for the implementation of the ERC activities;

(c)eingefügt: (c) the methods and procedures for peer review and proposal evaluation on the basis of which the proposals to be funded are determined;eingefügt: and, where appropriate, the introduction of elements of anonymised evaluation for individual research grants, in accordance with which research proposals may be evaluated without considering the person and geographical base of the applicant and the research institution they belong to;

(d)eingefügt: (d) its position on any matter which from a scientific perspective may enhance the achievements and impact of the ERC gestrichen: and the quality of the research carried out;eingefügt: and the implementation of ERC actions, including reference documents and IT systems;

(e)a code of conduct covering, among other matters, the avoidance of conflicts of interest;

(f)the procedure for the election of the ERC Vice-Presidents.

The Commission shall depart from the positions established by the ERC Scientific Council in accordance with the first subparagraph only if it considers that this Decision has not been respected. In that case, the Commission shall adopt measures to maintain continuity in the implementation of the Specific Programme and the achievements of its objectives, setting out and duly motivating the points of departure from the ERC Scientific Council gestrichen: positions.eingefügt: positions, informing the European Parliament and the Council.

5.eingefügt: 5. The ERC Scientific Council shall inform the Commission eingefügt: the European Parliament and the Council on research trends, data and any matter relevant for policy making and may perform analysis in this respect.

6.eingefügt: 6. The ERC gestrichen: Scientific Council and the Commissioneingefügt: President shall gestrichen: meeteingefügt: engage gestrichen: ateingefügt: in gestrichen: leasteingefügt: a gestrichen: twiceeingefügt: structured gestrichen: aeingefügt: dialogue gestrichen: yeareingefügt: with gestrichen: toeingefügt: the gestrichen: haveeingefügt: European gestrichen: aeingefügt: Parliament gestrichen: broadeingefügt: at gestrichen: andeingefügt: least gestrichen: timelyeingefügt: once gestrichen: exchangeeingefügt: a gestrichen: ofeingefügt: year, gestrichen: viewseingefügt: including gestrichen: ineingefügt: for the gestrichen: contexteingefügt: purpose of the gestrichen: developmenteingefügt: presentation of the gestrichen: ERC’s strategyeingefügt: ERC gestrichen: andeingefügt: annual gestrichen: theeingefügt: report gestrichen: Commission'seingefügt: and gestrichen: policyeingefügt: strategic gestrichen: making.eingefügt: priorities.

7.eingefügt: 7. The ERC Scientific Council is the guarantor of the quality of the activity from the scientific perspective and has full authority over decisions on the type of research eingefügt: and grant schemes to be funded.

8.eingefügt: 8. The ERC Scientific Council shall act exclusively in the interest of the ERC, according to the principles set out in Article 6(7). It shall act with integrity and probity and carry out its work efficiently and with the greatest possible transparency.eingefügt: There shall be no constraints on the ability of its members to communicate with the academic sector, Member States, all Union institutions, and any other relevant persons or entities.

9.gestrichen: In the context of the implementation of the Specific Programme, andeingefügt: 9. gestrichen: ineingefügt: In order to carry out these tasks, the ERC Scientific Council shall do the following:

(a)as regards scientific strategy:

I.eingefügt: i. establish the overall scientific strategy for the ERC, in the light of scientific opportunitiesgestrichen: and European scientific needs;

II.establish the work programme and develop the ERC's mix of support measures in accordance with its scientific strategy;

III.establish the necessary international cooperation initiatives including outreach activities, to increase the visibility of the ERC for the best researchers from the rest of the world, in accordance with its scientific strategy;

(b)as regards scientific management, monitoring and quality control:

I.ensure a world-class peer review system based on scientific excellence and on fully transparent, fair and impartial treatment of proposals by establishing positions on the implementation and management of calls for proposals, evaluation criteria, peer review processes including the selection of experts, the methods for peer review and proposal evaluation and the necessary implementing rules and guidelines, on the basis of which the proposals to be funded will be determined under the supervision of the ERC Scientific Council;

II.make a proposal based on which experts shall be appointed in the case of ERC frontier research actions;

III.ensure that ERC grants are implemented according to simple and transparent procedures that maintain the focus on excellence, encourage initiative and combine flexibility with accountability by continuously monitoring the quality of the operations and implementation;

IV.review and assess the ERC's achievements and the quality and impact of the research funded by the ERC and make recommendations and guidelines for corrective or future actions accordingly;

V.establish positions on any other matter affecting the achievements and impact of the ERC's activities and the quality of the research carried out under this part of Horizon Europe.

(c)as regards communication and dissemination:

I.raise the global profile and visibility of the ERC by conducting communication and outreach activities, including scientific conferences, to promote the ERC's activities and achievements and the results of the projects funded by the ERC with the scientific community, key stakeholders and the general public;

II.gestrichen: where appropriate,eingefügt: ii. consult with the scientific, engineering and academic community, regional and national research funding agencies and other stakeholders;

III.gestrichen: regularlyeingefügt: iii. gestrichen: reporteingefügt: regularly gestrichen: toeingefügt: inform the Commission gestrichen: oneingefügt: of its own activities.

Article 8 ERC dedicated implementation structure

1.The ERC dedicated implementation structure shall be responsible for the administrative implementation and execution of this component of the Specific Programme. It shall, in particular, implement the evaluation procedures, peer review and selection process in accordance with the strategy established by the ERC Scientific Council and shall ensure the financial and scientific management of the grants.

The ERC dedicated implementation structure shall support the ERC Scientific Council in the conduct of all of its tasks as set out in Article 7 including the development of its scientific strategy, its monitoring of the operations and its review and assessment of the ERC's achievements as well as its outreach and communications activities. The ERC dedicated implementation structure shall also provide access to the necessary documents and data in its possession and keep the ERC Scientific Council informed of its activities.

To ensure an effective liaison with the ERC dedicated implementation structure on strategy and operational matters, the leadership of the ERC Scientific Council and the Director of the ERC dedicated implementation structure shall hold regular coordination meetings.

2.The Commission shall ensure that the ERC dedicated implementation structure follows strictly, efficiently and with the necessary flexibility the objectives and requirements of the ERC alone. To fulfil its responsibilities as set out in Articles 6 and 7 and in this Article, in the context of its own responsibilities for budget execution, the Commission shall:

(a)ensure the continuity and renewal of the ERC Scientific Council and provide support for a standing Identification Committee for the identification of future ERC Scientific Council members;

(b)eingefügt: (b) ensure the continuity of the ERC dedicated implementation structure and the delegation of tasks and responsibilities to it, gestrichen: taking intoeingefügt: based gestrichen: accounteingefügt: on the gestrichen: viewseingefügt: decisions of the ERC Scientific Council;

(c)ensure that the ERC dedicated implementation structure carries out the full range of its tasks and responsibilities;

(d)eingefügt: (d) appoint the Director and the members of the management of the ERC dedicated implementation structure, gestrichen: takingeingefügt: following gestrichen: intoeingefügt: a gestrichen: accounteingefügt: transparent gestrichen: theeingefügt: and gestrichen: viewseingefügt: non-discriminatory gestrichen: ofeingefügt: selection eingefügt: procedure agreed with the ERC Scientific Council;

(e)eingefügt: (e) ensure the timely adoption of the ERC work programme, the positions regarding implementing methodology and the necessary implementing rules including the ERC rules of submission and the ERC model grant agreement, taking into account the views of the ERC Scientific Councilgestrichen: and the Commission’s corporate policies implemented through the Specific Programme;

(f)gestrichen: monitor, as responsible for the overall implementation of theeingefügt: (f) gestrichen: Programme,eingefügt: monitor the ERC dedicated implementation structure and evaluate its performance.

Article 9 Marie Sklodowska-Curie Actions

1.eingefügt: 1. The Marie Sklodowska-Curie Actions (MSCA) shall focus on investigator-driven research founded exclusively on scientific excellence to support researchers’ career, skills development, and mobility at all career gestrichen: stages.eingefügt: stages, focusing in particular on a new generation of highly-skilled early-career researchers from all areas, including from the SSH, and providing support for emerging talent from across the Union and beyond.

2.eingefügt: 2. The MSCA shall be open to any scientific domain under the Treaty on the Functioning of the European Union and the Treaty establishing the European Atomic Energy Community. If specific needs arise, eingefügt: and additional funding becomes available, the MSCA may target certain activities in specific thematic priorities, types of research and innovation institutions, or geographical locations to respond to the evolving requirements and needs of the Union regarding skills, research training, career development and knowledge gestrichen: sharing, in pursuit of the Union strategic autonomy.eingefügt: sharing.

3.The implementation of the MSCA shall:

(a)eingefügt: (a) offer attractive eingefügt: employment conditions and opportunities for career progression, eingefügt: including by limiting short-term employment contracts and ensuring fair renumeration corresponding to national salary benchmarks and wage indexation mechanisms, helping to address systemic issues of career instability and precarity in the research sector. The MSCA shall actively support the principles set out in the European Charter for Researchers promoting fair recruitment, transparent procedures, and merit-based gestrichen: advancement;eingefügt: advancement7;

(b)ensure strategic synergies with the European Research Council (ERC) but also with Union instruments that foster innovation, such as the European Innovation Council (EIC) and the activities to foster the integration of the knowledge triangle – higher education, research and innovation, and business – across the Union as well as other Union programmes such as Erasmus+;

(c)eingefügt: (c) promote work-life balance, eingefügt: gender-considerate work environments, diversity, and inclusion, setting high standards for working conditions across the European Research gestrichen: Area.eingefügt: Area that safeguard existing national labour law standards and collective agreements.

Article 10 Joint Research Centre

1.The activities of the Joint Research Centre (JRC) shall be complementary to indirect actions supporting longer-term policy gestrichen: objectives.eingefügt: objectives eingefügt: with clear positive effects for society. To achieve this, the JRC works with international, national, regional, and local stakeholders, including through scientific collaboration agreements.

The JRC activities shall:

–eingefügt: – be flexible and responsive to evolving policy eingefügt: and societal needs.

–ensure synergy with other EU investments.

–focus on the following areas:

I.scientific and technical support to Union policy priorities, in particular (but not limited to) those defined within the framework of the European Competitiveness Fund and those defined for parts I, II, III and IV of the Horizon Europe Programme;

II.knowledge integration and policy impact;

III.territorial development and Member State support;

IV.scientific excellence and international collaboration;

V.open science, knowledge sharing and capacity building.

Chapter III

Competitiveness and Society

Article 11 Collaborative research

Collaborative researcheingefügt: and innovation activities activities referred to in Chapter I of Regulation XXX [reference to the Horizon Europe Regulation] shall cover, in particular, the following research and innovation activities:

(a)eingefügt: (a) under ‘Competitiveness’, research and innovation activities of the policy windows described in Chapters IV to VII of the European Competitiveness Fund:eingefügt: in accordance with the rules set out in Regulation XXX [reference to the Horizon Europe Regulation]:

(b)under ‘Society’, research and innovation activities, such as:

(i)eingefügt: (i) activities aimed at eingefügt: guiding societal transformation and accomplishing priorities for global societal challenges:

–eingefügt: – strengthening democratic values and foundations, civic engagement, the rule of law and fundamental rights, eingefügt: good governance and accountability of the exercise of public power, by fostering resilient, pluralistic societies, and the integrity of the information and media space and countering polarisation, disinformation, hate speech, discrimination, and xenophobia, in a rapidly evolving world of geopolitical shifts;

–promoting social inclusion, social and economic transformations, inclusive societies and social cohesion and tackling inequalities to create opportunities for all, taking into consideration rural areas’ specificities, addressing demographic change and intergenerational fairness, including well-managed migration and mobility, supporting mental health and societal well-being, including for young people;

–fostering a value-based and competitive Europe by advancing future-ready skills, and driving inclusive innovation that empowers people, facilitates societal acceptance of technologies and supports sustainable growth that benefits all.

(ii)eingefügt: (ii) EU Missions: eingefügt: research and innovation activities supporting EU Missions referred to in Article 15(5) of Regulation XXX [reference to the Horizon Europe gestrichen: Regulation].eingefügt: Regulation], with all activities for the deployment and scaling up of innovative research solutions falling under instruments of the European Competitiveness Fund and other Union programmes.

(iii)eingefügt: (iii) activities in the context of the New European Bauhaus (NEB) Facility, established with the Horizon Europe Strategic Plan gestrichen: 2025-2027, shall deliver on theeingefügt: 2025-20278, gestrichen: objectiveseingefügt: strictly gestrichen: ofeingefügt: limited gestrichen: theeingefügt: to gestrichen: Neweingefügt: research gestrichen: Europeaneingefügt: and gestrichen: Bauhaus,eingefügt: innovation gestrichen: ineingefügt: components, gestrichen: particulareingefügt: with gestrichen: supportingeingefügt: all activities gestrichen: to fostereingefügt: for the gestrichen: developmenteingefügt: deployment and scaling up of innovative research solutions for the transformation of neighbourhoods into sustainable, inclusive and beautiful gestrichen: places.eingefügt: places falling under instruments of the European Competitiveness Fund and other Union programmes.

Chapter IV

Innovation

Article 12 The European Innovation Council Board

1.eingefügt: 1. The European Innovation Council Board (EIC Board) shall gestrichen: advise the Commission on:eingefügt: establish:

(a)the overall strategy for the EIC component under Part III ‘Innovation’ of Horizon Europe, taking into account complementarities with the European Competitiveness Fund;

(b)eingefügt: (b) a recommendation to the eingefügt: Commission for the draft work programme for the implementation of the EIC actions, including criteria for assessment of proposals and the appropriate balance between the different types of funding support;

(c)gestrichen: the identification of emerging technology trends from EIC's portfolios, and strategic portfolios of projects;

(d)eingefügt: (d) the profile eingefügt: and appointment of EIC Programme Managers;

(e)gestrichen: coordination with the Advisory Board on the European Competitiveness Fund Guarantees, Financial Instruments and Blending Operations established under the European Competitiveness Fund.

2.gestrichen: The EIC Board may upon request from the Commission address recommendations to the Commission on:

(a)any matter which, from an innovation perspective, may enhance and foster innovation eco-systems across the Union, the achievements and impact of the objectives of the EIC, and the capacity of innovative firms to roll out their solutions;

(b)identifying in cooperation with relevant Commission services, national and regional authorities and other relevant entities, possible regulatory barriers faced by entrepreneurs, in particular those awarded support under the EIC;

(c)programming in other parts of the Specific Programme.

3.eingefügt: 3. The EIC Board shall act in the interest of achieving the objectives of the EIC. It shall act with integrity and probity and carry out its work efficiently and transparently.eingefügt: There shall be no constraints on the ability of its members to communicate with the world of deep tech innovation, Member States, all Union institutions, and any other relevant persons or entities.

4.eingefügt: 4. The EIC Board shall be composed of 15 to 20 independent high-level individuals drawn from various parts of Europe's eingefügt: research and innovation ecosystem, including entrepreneurs, corporate leaders, investors, innovation experts and gestrichen: innovative researchers and gestrichen: technologyeingefügt: knowledge gestrichen: transfereingefügt: valorisation experts. The EIC Board shall contribute to outreach actions and its members shall strive to enhance the prestige of the EIC brand.

5.The members of the EIC Board shall be appointed by the Commission, following an open call for nominations or for expressions of interest, and taking into account the need for balance in expertise, gender, age and geographical distribution.

6.eingefügt: 6. Their term of office shall be limited to gestrichen: twoeingefügt: four years, renewable gestrichen: twice.eingefügt: once.

7.eingefügt: 7. The EIC Board shall have a President who shall be a high-profile gestrichen: public figure linked to the world of innovation, with a solid understanding of eingefügt: the knowledge continuum, developing innovations from eingefügt: frontier research to market and scale-up.

8.eingefügt: 8. The EIC Board President shall have the status of an independent special adviser and shall be appointed by the Commission following a transparent recruitment gestrichen: process.eingefügt: process eingefügt: and after consulting the European Parliament. The eingefügt: Parliament shall be informed and consulted before the appointment of the President and the members of the EIC Board. The term of office of the EIC Board President shall be limited to a maximum of gestrichen: twoeingefügt: four years, extendable once for up to gestrichen: 2eingefügt: 4 years.

9.The EIC Board President shall chair the EIC Board, prepare its meetings, assign tasks to members and may establish dedicated sub-groups. The EIC Board President shall represent the EIC Board’s views in the world of innovation and act as an interlocutor with the Commission.

10.eingefügt: 10. The Commission shall eingefügt: taking into consideration the views of the EIC Board, establish a EIC Board code of conduct addressing, in particular, the avoidance of conflicts of interest and breach of confidentiality. The members of the EIC Board shall agree to abide by the code of conduct upon assuming gestrichen: office.eingefügt: office, and shall be dismissed in case a conflict of interest or other violation arises.

11.gestrichen: The Commission shall provide administrative support to the EIC Board and the EIC Board President.

Article 13 Innovation Ecosystems

The Specific Programme shall support:

(a)the establishment and support of connected hubs across the Union, providing innovators, start-ups and scale-ups access to resources, services and partners, including investment opportunities, first buyers of R&I and innovative solutions, corporates, experimentation facilities, research and technology infrastructures, entrepreneurial talent, coaching and mentoring;

(b)activities to develop pan-European innovation ecosystems in key thematic areas, support the development of innovation skills and early-stage venture building, fostering the integration of the knowledge triangle – higher education, research and innovation, and business – across the Union;

(c)programmes to support innovative SMEs, start-ups and scale-ups to expand and access international markets through market viability studies, place-based innovation tools, collaborative research and innovation, exchange of talents, tailored mentorship, access to global investor networks, regulatory guidance, localized marketing support, and soft-landing services in target countries;

(d)other actions to support the development of innovation ecosystems and connectivity including studies, benchmarking, mutual learning between innovation actors and coordination of innovation policies.

Chapter V

European Research Area

Article 14 Reforming and enhancing the European R&I system

To support the realisation of the European Research Area (ERA), the Specific Programme shall assist Member States in achieving the objectives set out in the Pact for Research and Innovation in Europe, by supporting actions aligned with ERA objectives and priority areas for joint action, and by promoting upholding ERA values and principles, as established in the Pact.

Article 15 Widening participation and spreading excellence

The Specific Programme shall support a truly integrated and cohesive R&I ecosystem in the Union, addressing especially the third and fourth priority areas of the Pact for R&I, amplifying access to research and innovation excellence across the Union and prioritising investments and reforms. Disparities between leading and less advanced countries in terms of R&I performance shall be tackled through activities building a solid science base and connecting actors and ecosystems, and that encourage structural policy reforms at national and regional level aimed at, such as, improving the attractiveness of research careers, internationalisation, effectiveness of management and governance of R&I institutions or matching activities with Union initiatives.

Article 16 Research infrastructures

1.eingefügt: 1. The Specific Programme shall support the gestrichen: construction, development eingefügt: modernisation and integration of research infrastructures of eingefügt: Union interest to create real European gestrichen: Unioneingefügt: added gestrichen: interest.eingefügt: value by promoting scientific excellence and frontier research through a well-connected ecosystem of world-leading research facilities and services.

2.Research infrastructures activities shall focus on:

(a)eingefügt: (a) developing, consolidating and streamlining the Union landscape of research infrastructures, including coordination between the Union and national capacities gestrichen: andeingefügt: such gestrichen: contributingeingefügt: as gestrichen: upeingefügt: by gestrichen: toeingefügt: promoting gestrichen: 20%eingefügt: synergies gestrichen: ofeingefügt: through the gestrichen: buildingeingefügt: European gestrichen: costseingefügt: Semester eingefügt: process, including the use of gestrichen: criticaleingefügt: structural gestrichen: neweingefügt: funds gestrichen: world-classeingefügt: such gestrichen: capacities;eingefügt: as the European Regional Development Fund (ERDF);

(b)eingefügt: (b) reinforcing transnational access to research infrastructures across domains and sectors, and adapting to new emerging user communities;eingefügt: ensuring flexible and simplified implementation;

(c)making research infrastructures more resilient and sustainable while keeping pace with rapid technological advancements;

(d)eingefügt: (d) developing a web of findable, accessible, interoperable, reusable (FAIR) and machine-actionable research data, including through expanding and consolidating the European Open Science Cloud as Europe’s research data space;eingefügt: while ensuring appropriate frameworks for access and trusted collaboration of industry;

(e)reinforcing European research infrastructure policy and international cooperation.

Article 17 Technology infrastructures

1.eingefügt: 1. The Specific Programme shall improve technology infrastructure capacities in the Union and facilitate access to the integrated services of such infrastructures for innovative companies, including start-ups and gestrichen: scale-ups.eingefügt: scale-ups, while remaining strictly limited to research and innovation components, with all activities for the deployment and scaling up of technology infrastructures falling under instruments of the European Competitiveness Fund and other Union programmes.

2.Activities shall focus on:

Development of new technology infrastructure capacities

(a)Improving the visibility and uptake of technology infrastructure services;

(b)Access programme for SMEs, start-ups and scale-ups to technology infrastructures across the Union;

(c)Collaboration and networking among the infrastructures, training and upskilling of their staff.

(d)Reinforcing the European technology infrastructure policy.

Chapter VI

Transitional and final provisions

Article 18 Committee procedure

1.The Commission shall be assisted by a committee. That committee shall be a committee within the meaning of Regulation (EU) No 182/2011.

2.The committee may convene in the following configurations, having regard to the subject matter to be discussed:

·General configuration: overview of the implementation of the Specific Programme;

·ERC;

·MSCA;

·eingefügt: – Global societal challenges, gestrichen: EUeingefügt: to gestrichen: Missions,eingefügt: be gestrichen: Neweingefügt: guided eingefügt: in collaboration with the European gestrichen: Bauhauseingefügt: Council gestrichen: Facility;eingefügt: for Global Societal Challenges Research as set out in Regulation XXX [reference to the Horizon Europe Regulation];

·EIC and innovation ecosystems;

·Research and technology infrastructures;

·Reforming and enhancing the European R&I system and widening participation and spreading excellence.

3.Where reference is made to this paragraph, Article 4 of Regulation (EU) No 182/2011 shall apply.

4.Where reference is made to this paragraph, Article 5 of Regulation (EU) No 182/2011 shall apply.

5.Where the opinion of the committee is to be obtained by written procedure, that procedure shall be terminated without result when, within the time-limit for delivery of the opinion, the chair of the committee so decides or a simple majority of committee members so request.

6.eingefügt: 6. In accordance with international agreements concluded by the Union, representatives of third countries or international organisations may be invited as observers in the meetings of the gestrichen: Specific Programme committee under the conditions laid down in its rules of procedure, taking into account security and public order of the Union or its Member States.

Article 19 Repeal

Decision (EU) No 764/2021 is repealed with effect from 1 January 2028.

Article 20 Transitional provisions

1.This Decision shall not affect the continuation or modification of the actions concerned, until their closure, under Decision (EU) 2021/764/EU, which shall continue to apply to those actions until their closure.

2.The financial envelope for the Specific Programme may also cover technical and administrative assistance expenses necessary to ensure the transition between the Specific Programme and the measures adopted under its Decision (EU) 2021/764.

Article 21 Entry into force and application

This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

It shall apply from 1 January 2028.

Nicht im Text zugeordnet

Diese Änderungsanträge konnten keiner Stelle im Vorschlag zugeordnet werden und sind daher nicht darin enthalten.

  • Änderungsantrag 9 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 2 – paragraph 2 – point -a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 2 – paragraph 2 – point -a (new).

  • Änderungsantrag 15 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 2 – paragraph 2 – point f a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 2 – paragraph 2 – point f a (new).

  • Änderungsantrag 20 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 2 – paragraph 2 – point j a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 2 – paragraph 2 – point j a (new).

  • Änderungsantrag 21 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 2 – paragraph 2 – point j b (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 2 – paragraph 2 – point j b (new).

  • Änderungsantrag 22 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 2 – paragraph 2 – point j c (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 2 – paragraph 2 – point j c (new).

  • Änderungsantrag 28 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 4 – paragraph 1 – point e a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 4 – paragraph 1 – point e a (new).

  • Änderungsantrag 30 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 4 – paragraph 2 – point a a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 4 – paragraph 2 – point a a (new).

  • Änderungsantrag 31 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 4 – paragraph 2 – point a b (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 4 – paragraph 2 – point a b (new).

  • Änderungsantrag 34 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 4 – paragraph 2 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 4 – paragraph 2 a (new).

  • Änderungsantrag 39 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 5 – paragraph 1 – point a – point iii a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 5 – paragraph 1 – point a – point iii a (new).

  • Änderungsantrag 41 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 5 – paragraph 1 – point a – point v a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 5 – paragraph 1 – point a – point v a (new).

  • Änderungsantrag 45 · keine Plenarabstimmung zugeordnet

    Nach ähnlichem Wortlaut eingefügt: Der Änderungsantrag zitiert den Vorschlag leicht abweichend.

    Grund: der Änderungsantrag ändert nichts an dem Wortlaut, den er zitiert. Stelle: Article 5 – paragraph 1 – point a – point ix – point ii.

  • Änderungsantrag 49 · keine Plenarabstimmung zugeordnet

    Nach ähnlichem Wortlaut eingefügt: Der Änderungsantrag zitiert den Vorschlag leicht abweichend.

    Grund: der Änderungsantrag ändert nichts an dem Wortlaut, den er zitiert. Stelle: Article 5 – paragraph 1 – point b.

  • Änderungsantrag 50 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 5 – paragraph 1 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 5 – paragraph 1 a (new).

  • Änderungsantrag 51 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 5 – paragraph 1 b (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 5 – paragraph 1 b (new).

  • Änderungsantrag 54 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 6 – paragraph 5 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 6 – paragraph 5 a (new).

  • Änderungsantrag 61 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 7 – paragraph 3 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 7 – paragraph 3 a (new).

  • Änderungsantrag 81 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 9 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 9 a (new).

  • Änderungsantrag 93 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 12 – paragraph 1 – point b a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 12 – paragraph 1 – point b a (new).

  • Änderungsantrag 103 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 12 – paragraph 9 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 12 – paragraph 9 a (new).

  • Änderungsantrag 104 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 12 – paragraph 9 b (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 12 – paragraph 9 b (new).

  • Änderungsantrag 106 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 12 – paragraph 10 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 12 – paragraph 10 a (new).

  • Änderungsantrag 107 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 12 – paragraph 10 b (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 12 – paragraph 10 b (new).

  • Änderungsantrag 109 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 12 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 12 a (new).

  • Änderungsantrag 110 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 13 – paragraph 1 – point c a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 13 – paragraph 1 – point c a (new).

  • Änderungsantrag 112 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 16 – paragraph 1 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 16 – paragraph 1 a (new).

  • Änderungsantrag 114 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 16 – paragraph 2 – point a a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 16 – paragraph 2 – point a a (new).

  • Änderungsantrag 117 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 16 – paragraph 2 – point d a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 16 – paragraph 2 – point d a (new).

  • Änderungsantrag 119 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 18 – paragraph 2 – indent 3 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 18 – paragraph 2 – indent 3 a (new).

  • Änderungsantrag 121 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 18 – paragraph 2 – indent 4 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 18 – paragraph 2 – indent 4 a (new).

  • Änderungsantrag 122 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 18 – paragraph 2 – indent 4 b (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 18 – paragraph 2 – indent 4 b (new).

  • Änderungsantrag 123 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 18 – paragraph 2 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 18 – paragraph 2 a (new).

  • Änderungsantrag 124 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 18 – paragraph 4 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 18 – paragraph 4 a (new).

  • Änderungsantrag 126 · keine Plenarabstimmung zugeordnet

    Nach seiner Stelle im Vorschlag eingefügt.

    Grund: die Stelle „Article 18 a (new)“ wurde im Vorschlag nicht gefunden. Stelle: Article 18 a (new).

Das Dokument des Parlaments in der veröffentlichten Fassung (die Änderungsanträge als Tabellen) →