Skip to content
EU Parl Watch

Changes between two versions

What changed between the plenary report and the adopted text

From · plenary report· 30 Jun 2025

A-10-2025-0121

on the security of energy supply in the EU

To · adopted text· 8 Jul 2025

TA-10-2025-0146

Security of energy supply in the EU

AI:What changed, in short

The only substantive change removes the mention of natural gas and biomass as transitional fuels for district heating.3 The other changes are formal: decimal commas are replaced with decimal points in several figures.1245

1 change of substance · 4 formal · 0 of wording only

Written by AI from the two texts only · read the changes before relying on it · 4 Sept 2026 · Report a problem

+4 added · −11 removed · 8 changed paragraphs, packaging included.

Part 3 of 4: Paragraphs 121–126

6 unchanged paragraphs

56. Underlines that data-driven technologies should positively impact energy security management; recognises the importance of comprehensive energy information and data in identifying and responding to evolving energy security threats and in infrastructure planning, and calls for improved coordination in the collection of such information and data;

57. Calls on the Commission to include in the security of supply proposal technical provisions for the standardisation and interoperability of critical components of the EU’s energy system, particularly electrical transformers, to ensure that a lack of standardisation does not hinder European solidarity;

58. Welcomes the establishment by the European Network of Transmission System Operators for Electricity (ENTSO-E) of a new Task Force on the Security of Critical Infrastructure, aimed at analysing and proposing recommendations on the topic of security of critical infrastructure; stresses the importance of incorporating lessons learned from Ukraine’s experience, including the valuable expertise of the dedicated unit within the Ukrainian Transmission System Operator (TSO) tasked with identifying and mitigating threats to critical infrastructure; calls on the Commission to collaborate closely with ENTSO-E in delivering a comprehensive and systemic assessment of threats to the EU electricity grid, to be completed by 2026;

°

° °

59. Instructs its President to forward this resolution to the Council and the Commission.