amendment list, 19 October 2026
Proposal for a Regulation of the European Parliament and of the Council establishing a framework of measures for the acceleration of industrial capacity and decarbonisation in strategic sectors and amending Regulations (EU) 2018/1724, (EU) 2024/1735 and (EU) 2024/3110
Document CJ80-AM-796451 · (COM(2026)0100 – C100067/2026 – 2026/0068(COD))
Committee on International Trade Committee on Industry, Research and Energy Committee on the Internal Market and Consumer Protection
Full text
This is Parliament’s document as it publishes it: 292 amendments, each as a table with the wording it changes on the left and Parliament’s wording on the right. It has no running text — Parliament publishes no consolidated version. For the whole proposal with these amendments written in, read the text as amended.
Jump to an amendment (292)
- Amendment 4296
- Amendment 4297
- Amendment 4298
- Amendment 4299
- Amendment 4300
- Amendment 4301
- Amendment 4302
- Amendment 4303
- Amendment 4304
- Amendment 4305
- Amendment 4306
- Amendment 4307
- Amendment 4308
- Amendment 4309
- Amendment 4310
- Amendment 4311
- Amendment 4312
- Amendment 4313
- Amendment 4314
- Amendment 4315
- Amendment 4316
- Amendment 4317
- Amendment 4318
- Amendment 4319
- Amendment 4320
- Amendment 4321
- Amendment 4322
- Amendment 4323
- Amendment 4324
- Amendment 4325
- Amendment 4326
- Amendment 4327
- Amendment 4328
- Amendment 4329
- Amendment 4330
- Amendment 4331
- Amendment 4332
- Amendment 4333
- Amendment 4334
- Amendment 4335
- Amendment 4336
- Amendment 4337
- Amendment 4338
- Amendment 4339
- Amendment 4340
- Amendment 4341
- Amendment 4342
- Amendment 4343
- Amendment 4344
- Amendment 4345
- Amendment 4346
- Amendment 4347
- Amendment 4348
- Amendment 4349
- Amendment 4350
- Amendment 4351
- Amendment 4352
- Amendment 4353
- Amendment 4354
- Amendment 4355
- Amendment 4356
- Amendment 4357
- Amendment 4358
- Amendment 4359
- Amendment 4360
- Amendment 4361
- Amendment 4362
- Amendment 4363
- Amendment 4364
- Amendment 4365
- Amendment 4366
- Amendment 4367
- Amendment 4368
- Amendment 4369
- Amendment 4370
- Amendment 4371
- Amendment 4372
- Amendment 4373
- Amendment 4374
- Amendment 4375
- Amendment 4376
- Amendment 4377
- Amendment 4378
- Amendment 4379
- Amendment 4380
- Amendment 4381
- Amendment 4382
- Amendment 4383
- Amendment 4384
- Amendment 4385
- Amendment 4386
- Amendment 4387
- Amendment 4388
- Amendment 4389
- Amendment 4390
- Amendment 4391
- Amendment 4392
- Amendment 4393
- Amendment 4394
- Amendment 4395
- Amendment 4396
- Amendment 4397
- Amendment 4398
- Amendment 4399
- Amendment 4400
- Amendment 4401
- Amendment 4402
- Amendment 4403
- Amendment 4404
- Amendment 4405
- Amendment 4406
- Amendment 4407
- Amendment 4408
- Amendment 4409
- Amendment 4410
- Amendment 4411
- Amendment 4412
- Amendment 4413
- Amendment 4414
- Amendment 4415
- Amendment 4416
- Amendment 4417
- Amendment 4418
- Amendment 4419
- Amendment 4420
- Amendment 4421
- Amendment 4422
- Amendment 4423
- Amendment 4424
- Amendment 4425
- Amendment 4426
- Amendment 4427
- Amendment 4428
- Amendment 4429
- Amendment 4430
- Amendment 4431
- Amendment 4432
- Amendment 4433
- Amendment 4434
- Amendment 4435
- Amendment 4436
- Amendment 4437
- Amendment 4438
- Amendment 4439
- Amendment 4440
- Amendment 4441
- Amendment 4442
- Amendment 4443
- Amendment 4444
- Amendment 4445
- Amendment 4446
- Amendment 4447
- Amendment 4448
- Amendment 4449
- Amendment 4450
- Amendment 4451
- Amendment 4452
- Amendment 4453
- Amendment 4454
- Amendment 4455
- Amendment 4456
- Amendment 4457
- Amendment 4458
- Amendment 4459
- Amendment 4460
- Amendment 4461
- Amendment 4462
- Amendment 4463
- Amendment 4464
- Amendment 4465
- Amendment 4466
- Amendment 4467
- Amendment 4468
- Amendment 4469
- Amendment 4470
- Amendment 4471
- Amendment 4472
- Amendment 4473
- Amendment 4474
- Amendment 4475
- Amendment 4476
- Amendment 4477
- Amendment 4478
- Amendment 4479
- Amendment 4480
- Amendment 4481
- Amendment 4482
- Amendment 4483
- Amendment 4484
- Amendment 4485
- Amendment 4486
- Amendment 4487
- Amendment 4488
- Amendment 4489
- Amendment 4490
- Amendment 4491
- Amendment 4492
- Amendment 4493
- Amendment 4494
- Amendment 4495
- Amendment 4496
- Amendment 4497
- Amendment 4498
- Amendment 4499
- Amendment 4500
- Amendment 4501
- Amendment 4502
- Amendment 4503
- Amendment 4504
- Amendment 4505
- Amendment 4506
- Amendment 4507
- Amendment 4508
- Amendment 4509
- Amendment 4510
- Amendment 4511
- Amendment 4512
- Amendment 4513
- Amendment 4514
- Amendment 4515
- Amendment 4516
- Amendment 4517
- Amendment 4518
- Amendment 4519
- Amendment 4520
- Amendment 4521
- Amendment 4522
- Amendment 4523
- Amendment 4524
- Amendment 4525
- Amendment 4526
- Amendment 4527
- Amendment 4528
- Amendment 4529
- Amendment 4530
- Amendment 4531
- Amendment 4532
- Amendment 4533
- Amendment 4534
- Amendment 4535
- Amendment 4536
- Amendment 4537
- Amendment 4538
- Amendment 4539
- Amendment 4540
- Amendment 4541
- Amendment 4542
- Amendment 4543
- Amendment 4544
- Amendment 4545
- Amendment 4546
- Amendment 4547
- Amendment 4548
- Amendment 4549
- Amendment 4550
- Amendment 4551
- Amendment 4552
- Amendment 4553
- Amendment 4554
- Amendment 4555
- Amendment 4556
- Amendment 4557
- Amendment 4558
- Amendment 4559
- Amendment 4560
- Amendment 4561
- Amendment 4562
- Amendment 4563
- Amendment 4564
- Amendment 4565
- Amendment 4566
- Amendment 4567
- Amendment 4568
- Amendment 4569
- Amendment 4570
- Amendment 4571
- Amendment 4572
- Amendment 4573
- Amendment 4574
- Amendment 4575
- Amendment 4576
- Amendment 4577
- Amendment 4578
- Amendment 4579
- Amendment 4580
- Amendment 4581
- Amendment 4582
- Amendment 4583
- Amendment 4584
- Amendment 4585
- Amendment 4586
- Amendment 4587
Text 2,504 paragraphs
Amendment 4296
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli, Klara Dostalova, Jana Nagyová, Ondřej Knotek, Jaroslav Bžoch, Tomáš Kubín
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I - part I – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that origintates in the Union: power plant control, inverter and battery cells. |
Or. en
Justification
The European supply chain of inverters, power plant control, battery management systems and assembly can be ready to meet the needs of new storage systems. Given the current concentration of global battery cell production outside the EU, introducing Union-origin requirements for cells from Phase 1 under Article 26 NZIA is crucial. Cells are the foundational component of a BESS, determining voltage profiles, thermal behavior, safe operating limits, degradation patterns, and system-level performance, including cybersecurity. Early requirements prevent formal compliance loopholes, such as partial offshoring or reliance on equivalent content, ensuring genuine EU-based manufacturing capacity. Introducing cells in the initial phase also provides a timely market signal, supporting rapid BESS deployment, investor readiness, and Europe’s industrial capacity, while strengthening strategic autonomy in net-zero technologies.
Amendment 4297
Mariateresa Vivaldini, Nicolas Bay, Giovanni Crosetto, Marion Maréchal, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Read the rest (2,492 paragraphs)
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – 1(a) - part I – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [ 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originates in the Union: power plant control, inverter and battery cells. |
Or. en
Justification
Environmental sustainability labelling for construction products should be based on a robust and comparable life-cycle methodology. Relying on the established EN 15804 framework avoids duplicative methodologies, reduces administrative burdens for manufacturers and provides greater legal certainty across the internal market.
Amendment 4298
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originate in the Union: power plant control, inverter and battery cells. |
Or. en
Amendment 4299
Pierre Jouvet, Raphaël Glucksmann, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – point 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system, power-conversion system and energy-management system that originate in the Union. |
Or. fr
Amendment 4300
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall be assembled in the Union and contain the BESS PCS that originates in the Union. |
Or. en
Amendment 4301
Bart Groothuis, Nikola Minchev, Christophe Grudler, Jeannette Baljeu, Morten Løkkegaard, Sandro Gozi, Sophie Wilmès, Benoit Cassart, Dan Barna, Brigitte van den Berg, Sigrid Friis, Ivars Ijabs
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Amendments to Regulation (EU) 2024/1735 [NZIA]
Annex II – part I – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and a power conversion system that originates in the Union. |
Or. en
Justification
The power conversion system links a battery to the grid and can be controlled remotely. Like the battery management system, it should be listed as a component, to reduce dependency and cybersecurity risks.
Amendment 4302
Jan Farský
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2026/0068
Annex II – part I – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall be assembled in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Amendment 4303
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 2 years after entry into force of this Regulation] until [5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Amendment 4304
Daniel Obajtek, Marion Maréchal, Anna Zalewska, Jadwiga Wiśniewska, Jacek Ozdoba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part 1 – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 3 year after entry into force of this Regulation] until [5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Justification
The postponement allows sufficient time for Union manufacturing capacity for battery energy storage systems and battery management systems to scale up. Applying the Union-origin requirements too early could create supply bottlenecks, increase project costs and delay the deployment of energy-storage projects essential for the clean-energy transition.
Amendment 4305
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Delara Burkhardt, Bruno Tobback, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – Part I Public Procurement – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, cathode active material, a battery management system as well as one additional main specific component that originate in the Union and recycled content originating in the Union, in accordance with the requirements on minimum levels of recycled content laid down in Regulation (EU) 2023/1542 (EU Battery Regulation), and verified pursuant to that Regulation’s rules on the calculation, declaration and traceability of recycled content. At least 20% of the relevant strategic raw materials used shall be mined, processed or recycled within the European Union. By 2036, this threshold shall rise to as least 40%. |
Or. en
Amendment 4306
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall shall be assembled in the Union and contain the BESS PCS, the Battery Management System (BMS), EMS/SCADA and the battery cellthat originate in the Union. |
| Only after a mandatory and thorough assessment of the Union BESS manufacturing capacity confirms that such requirements would neither disrupt the deployment of battery energy storage systems nor create supply constraints, shall battery cells, battery management systems (BMS) and EMS/SCADA systems be required to originate in the Union in Phase II. |
Or. en
Amendment 4307
Pierre Jouvet, Raphaël Glucksmann, Jean-Marc Germain, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – point 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, cathode active material, a battery management system, power-conversion system and energy-management system, as well as one additional main specific component that originate in the Union. At least 20 % of the relevant strategic raw materials used in them must have been extracted, processed or recycled in the Union or in an overseas country or territory listed in Annex II to the TFEU. By 2036, this threshold shall rise to at least 40 %. |
Or. fr
Justification
The overseas countries and territories (OCTs) associated with the Union may contribute to the resilience and security of its supply chains for strategic raw materials: some of them have significant reserves of nickel, graphite or rare earths. The strategic raw materials that are extracted, processed or recycled from them must therefore be included under the equivalent requirements for batteries and storage systems.
Amendment 4308
Matthias Ecke
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, cathode active materials as well as one additional main specific component that originate in the Union. At least 20% of the relevant strategic raw materials used shall be mined, processed or recycled within the European Union. By 2036, this threshold shall rise to as least 40%. |
Or. en
Amendment 4309
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union, and 35 % of the strategic raw materials used in the battery energy storage systems are recycled. |
Or. en
Justification
To build a truly European battery supply chain, the EU should also ensure that the raw materials used in the batteries originate in the EU and promoting recycling is key to achieve this goal. As recycling of some strategic raw materials is still at an early stage of market deployment, it is however appropriate to extend the deadlines.
Amendment 4310
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part I – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation] until [5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, the binders, a battery management system, as well as one additional main specific component that originate in the Union. |
Or. en
Amendment 4311
Mariateresa Vivaldini, Nicolas Bay, Giovanni Crosetto, Marion Maréchal, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter, as well as one additional main specific component that originate in the Union. |
Or. en
Justification
The transition to stronger Union origin requirements should reflect the availability of European manufacturing capacity across the main components of battery energy storage systems. An earlier and broader requirement provides a clearer demand signal for investment in the European BESS value chain.
Amendment 4312
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter as well as one additional main specific component that originate in the Union. |
Or. en
Amendment 4313
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli, Klara Dostalova, Jana Nagyová, Ondřej Knotek, Jaroslav Bžoch, Tomáš Kubín
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter as well as one additional main specific component that originate in the Union. |
Or. en
Amendment 4314
Bart Groothuis, Nikola Minchev, Christophe Grudler, Jeannette Baljeu, Morten Løkkegaard, Sandro Gozi, Sophie Wilmès, Benoit Cassart, Dan Barna, Brigitte van den Berg, Sigrid Friis, Ivars Ijabs
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power conversion system as well as one additional main specific component that originate in the Union. |
Or. en
Justification
The power conversion system links a battery to the grid and can be controlled remotely. Like the battery management system, it should be listed as a component, to reduce dependency and cybersecurity risks.
Amendment 4315
Andrea Wechsler, Christian Ehler, Angelika Niebler, Jens Gieseke, Andreas Schwab, Norbert Herhammer, Hildegard Bentele, Markus Ferber, Oliver Schenk, Christian Doleschal, Monika Hohlmeier, Verena Mertens, Ralf Seekatz, Marie-Sophie Christ, Alexandra Mehnert, Norbert Lins, Marion Walsmann
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, cathode active materials, a battery management system as well as one additional main specific component that originate in the Union. |
Or. en
Justification
Cathode active materials are a key value-creating step in battery production and are strategically important for European battery resilience.
Amendment 4316
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as at least one additional main specific component that originate in the Union. |
Or. en
Amendment 4317
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as two additional main specific component that originate in the Union. |
Or. en
Amendment 4318
Daniel Obajtek, Marion Maréchal, Anna Zalewska, Jadwiga Wiśniewska, Jacek Ozdoba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | From [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. |
Or. en
Justification
The postponement allows sufficient time for Union manufacturing capacity for battery energy storage systems and battery management systems to scale up. Applying the Union-origin requirements too early could create supply bottlenecks, increase project costs and delay the deployment of energy-storage projects essential for the clean-energy transition.
Amendment 4319
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8a (new)
Regulation (EU)2024/1735
Annex II – part I – point (a) - third subparagraph (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I point (a) a third subparagraph is added : |
|---|---|
| From [OP: Please insert the date = 5 years after entry into force of this Regulation] the battery energy storage systems shall originate in the Union and contain battery cells, the binders, cathode active materials, a battery management system, as well as one additional main specific component that originate in the Union. At least 20% of lithium used shall be extracted, processed or recycled within the Union. |
Or. en
Amendment 4320
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Javier Moreno Sánchez, José Cepeda, Hana Jalloul Muro, Lina Gálvez, Elena Sancho Murillo, Laura Ballarín Cereza, Nicolás González Casares, Idoia Mendia, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (ca) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ca is added : |
|---|---|
| ca) Electric charging technologies for transport: From [OP: Please insert the date = 2 years after entry into force of this Regulation], electric vehicle supply equipment, shore-side electricity supply equipment, and electric air transport supply equipment shall originate within the Union. |
Or. en
Amendment 4321
Zala Černilec Tomašič
Proposal for a regulation
Article 34 – paragraph 1 – point 8a (new)
Regulation 2024/1735Annex II – Part I
Annex II –– part I – paragraph 1 – point (ea) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added : |
|---|---|
| (ea) Where Union origin requirements apply to steel under this Annex, steel which has been melted and poured in the Union, including steel produced predominantly from ferrous scrap in electric arc furnaces, shall be considered to be of Union origin, irrespective of the origin of the primary iron input. The use of ferrous scrap and other secondary raw materials shall be recognised as contributing to the low-carbon classification of steel referred to in Article 10. |
Or. en
Justification
Steel produced from scrap in electric arc furnaces is the least carbon-intensive steel production route in the Union. Any Union origin rule for steel should make clear that such steel qualifies, irrespective of rules on primary iron inputs.
Amendment 4322
András Gyürk, Enikő Győri, Ernő Schaller-Baross, András László
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – Part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1point ea is added |
|---|---|
| (aa) Electricity grid technologies: From [OP: please insert the date = 1 year after entry into force of this Regulation], transformers, switchgear, high-voltage direct current transmission equipment, onshore and offshore substations, grid digitalisation and protection systems shall originate in the Union. |
Or. en
Amendment 4323
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ae) Electricity grid technologies: From [OP: Please insert the date = 1 year after entry into force of this Regulation], cables and lines for electricity transmission and distribution shall originate in the Union. |
Or. en
Amendment 4324
Pierre Jouvet, Raphaël Glucksmann, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – point 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar technologies: from [OP: Please insert the date = one year after entry into force of this Regulation], the PV inverter, the polysilicon and one additional main specific component, namely the solar trackers and their specific mounting structures where the project includes them, shall originate in the Union. From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent and one additional main specific component, namely the solar trackers and their specific mounting structures where the project includes them, shall originate in the Union. From [OP: Please insert the date = 3 years after entry into force of this Regulation], the solar thermal collector shall originate in the Union. |
Or. fr
Justification
Solar trackers and their mounting structures were already main specific components within the meaning of Regulation (EU) 2024/1735, but they avoided scrutiny owing to the lack of dedicated customs codes, so European capacity, which largely consists of SMEs in galvanisation and metal structures, is being eroded. Mentioning them by name will make the requirement applicable.
Amendment 4325
Piotr Müller
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – paragraph 1 - point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter shall originate in the Union and the PV modules shall be assembled in the Union. From [OP: Please insert the date = 5 years after entry into force of this Regulation], the PV cells or equivalent shall also originate in the Union, provided that the Commission has established, by means of an implementing act adopted in accordance with the examination procedure referred to in Article 45(3) by [OP: Please insert the date = 4 years after entry into force of this Regulation], that Union manufacturing capacity for PV cells is sufficient to meet the expected demand without price increases which are disproportionate in comparison with world market prices, taking into account the security of supply. |
Or. en
Justification
Union production of PV cells is currently marginal. Requiring Union cells after three years would sharply raise costs or halt public PV projects. Inverters and module assembly build on existing Union capacity, and inverters are also a matter of grid security. Cells should follow only once the Member States, through an implementing act, have confirmed that capacity and prices allow it.
Amendment 4326
Maria Grapini
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Article 34 – Annex II – Part I – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From [OP: Please insert the date = one year after entry into force of this Regulation], the PV inverter, the polysilicon, the PV tracking systems and associated specific mountings, and one additional main specific component shall originate in the Union. |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent, the PV tracking systems and associated specific mountings, and one additional main specific component shall originate in the Union. |
Or. ro
Amendment 4327
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – Part I – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar technologies: From [OP: Please insert the date = 1 years after entry into force of this Regulation], the PV inverter, the polysilicon and one additional main specific component shall originate in the Union. |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent and one additional main specific component shall originate in the Union. Solar thermal technologies: | |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the solar thermal collector shall originate in the Union. |
Or. en
Amendment 4328
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – paragraph 1– point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], PV cells or equivalent, PV inverters and at least one of the following additional main specific components shall originate in the Union: PV-grade polysilicon, PV-grade silicon ingots or equivalent, PV wafers or equivalent, solar glass, PV modules, or PV trackers and their specific mounting structures. |
| From 1 January 2035, PV cells or equivalent, PV inverters and at least three of the additional main specific components referred to in the second subparagraph shall originate in the Union. |
Or. en
Amendment 4329
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza, Jonás Fernández
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part 1 – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From [OP: Please insert the date = 1 year after entry into force of this Regulation], the PV inverter, the polysilicon and one additional main specific component shall originate in the Union. |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent as well as three additional main specific components shall originate in the Union. |
Or. en
Amendment 4330
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part I – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: |
| From [OP: Please insert the date = 1 year after entry into force of this Regulation], the PV inverter, and one additional main specific component shall originate in the Union. | |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, and the PV cells or equivalent, and one additional main specific component shall originate in the Union. |
Or. en
Amendment 4331
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. |
| [OP: Please insert the date = 1 year after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent and one additional main specific component shall originate in the Union. |
Or. en
Amendment 4332
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II – part I – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From [OP: Please insert the date = 1 year after entry into force of this Regulation], the PV inverter and the PV cells or equivalent and two additional main specific components shall originate in the Union. |
Or. en
Amendment 4333
Mariateresa Vivaldini, Nicolas Bay, Giovanni Crosetto, Marion Maréchal, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From [OP: Please insert the date = 1 years after entry into force of this Regulation], the PV inverter, the PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Justification
Union origin requirements for strategic solar components should take effect sufficiently early to provide a meaningful demand signal for European manufacturing. The requirement should also cover PV modules, reflecting their role in the solar value chain and supporting existing and emerging manufacturing capacity in the Union.
Amendment 4334
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: |
| From the date of the entry into force of this Regulation the PV inverter, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Amendment 4335
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From the date entry into force of this Regulation the PV inverter, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Amendment 4336
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (ba) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ba is added : |
|---|---|
| (ba) Solar thermal technologies: From [OP: Please insert the date = 2 years after entry into force of this Regulation], the solar thermal collector shall originate in the Union. |
Or. en
Amendment 4337
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II – part I – paragraph 1 – point (ba) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ba is added : |
|---|---|
| (ba) Solar thermal technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], the solar thermal collector shall originate in the Union. |
Or. en
Amendment 4338
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (c)
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: From [OP: Please insert: 3 years after the entry into force of this Regulation] the hydronic heat pump shall originate in the Union. | (c) Heat pumps and geothermal energy technologies: From [OP: Please insert: 3 years after the entry into force of this Regulation] heat pumps and heat-pump rotary compressors shall originate in the Union. |
| From 1 January 2035, four-way valves shall also originate in the Union where they form part of the relevant heat pump. | |
| From [OP: please insert the date = three years after the entry into force of this Regulation], for geothermal power plants and geothermal direct-use systems, at least one of the following main specific components shall originate in the Union: | |
| (a) heat exchangers resistant to geothermal corrosive operating conditions; | |
| (b) submersible pumps resistant to geothermal corrosive operating conditions. |
Or. en
Amendment 4339
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point c
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: From [OP: Please insert: 3 years after the entry into force of this Regulation] the hydronic heat pump shall originate in the Union. | (c) Heat pump technologies: From [OP: Please insert: 3 years after the entry into force of this Regulation], heat pump technologies, including hydronic heat pumps, air-air heat pumps, industrial heat pumps and high-temperature heat pumps, shall originate in the Union. |
Or. en
Amendment 4340
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (c
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: From [OP: Please insert: 3 years after the entry into force of this Regulation] the hydronic heat pump shall originate in the Union. | (c) Heat pumps: From [OP: Please insert: 3 years after the entry into force of this Regulation] the hydronic heat pump shall originate in the Union. |
Or. en
Amendment 4341
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part 1 – paragraph 1 – point c
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: From [OP: Please insert: 3 years after the entry into force of this Regulation] the hydronic heat pump shall originate in the Union. | (c) Heat pumps: From [OP: Please insert: 3 years after the entry into force of this Regulation] the heat pump shall originate in the Union. |
Or. en
Amendment 4342
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (c)
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: From [OP: Please insert: 3 years after the entry into force of this Regulation] the hydronic heat pump shall originate in the Union. | (c) Heat pumps: From [OP: Please insert: 2 years after the entry into force of this Regulation] the heat pump shall originate in the Union. |
Or. en
Amendment 4343
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 1 (new)
Regulation (EU) 2024/1735
Article 3– paragraph 27 – point (ca) (new)
| Text proposed by the Commission | Amendment |
|---|---|
| (8a) In Article 3(27), the definition of “auction” is replaced by the following: ‘“auction” means a mechanism for competitive tendering procedures to support the production or consumption of energy from renewable sources, or the deployment, operation or procurement of Net-Zero technologies, including stationary battery energy storage systems, that does not fall under Directive 2009/81/EC of the European Parliament and of the Council (*) or Directive 2014/23/EU, 2014/24/EU or 2014/25/EU;’ |
Or. en
Amendment 4344
Christophe Grudler, Bart Groothuis, Nikola Minchev, Stéphanie Yon-Courtin, Barry Andrews, Sandro Gozi, Brigitte van den Berg, Yvan Verougstraete
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (ca) (new)
| Text proposed by the Commission | Amendment (8a) In Annex |
|---|---|
| (ca) Hydrogen: | |
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] the stacks as well as one additional main specific component shall originate in the Union. | |
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], the stacks as well as two additional main specific components shall originate in the Union. |
Or. en
Amendment 4345
Raúl de la Hoz Quintano, Gabriel Mato, Adrián Vázquez Lázara, Esteban González Pons, Pilar del Castillo Vera, Dolors Montserrat, Javier Zarzalejos, Susana Solís Pérez, Borja Giménez Larraz, Carmen Crespo Díaz, Antonio López-Istúriz White, Esther Herranz García, Nicolás Pascual de la Parte, Juan Ignacio Zoido Álvarez, Francisco José Millán Mon, Maravillas Abadía Jover, Isabel Benjumea Benjumea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – paragraph 1 – point (ca) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ca is added : |
|---|---|
| (ca) Electric charging technologies for transport: From [OP: please insert the date = two years after the date of entry into force of this Regulation], electric vehicle supply equipment, shore-side electricity supply equipment and electric air transport supply equipment shall originate in the Union. |
Or. en
Amendment 4346
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II
| Text proposed by the Commission | Amendment |
|---|---|
| (ca) Electric charging technologies for transport: From [OP: Please insert the date = 2 years after entry into force of this Regulation], electric vehicle supply equipment, shore-side electricity supply equipment, and electric air transport supply equipment shall originate within the Union. |
Or. en
Amendment 4347
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II – part I– paragraph 1 – point (ca) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ca is added : |
|---|---|
| (ca) Electric charging technologies for transport: From [OP: Please insert the date = 2 years after entry into force of this Regulation], electric vehicle supply equipment, shore-side electricity supply equipment, and electric air transport supply equipment shall originate within the Union. |
Or. en
Amendment 4348
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II – part I – paragraph 1 – point (cb) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point cb is added : |
|---|---|
| (cb) From [3 years after entry into force of this Regulation], cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), inverters, converters, electric cabinets, and protection relays shall originate within the Union. |
Or. en
Amendment 4349
Christophe Grudler, Stéphanie Yon-Courtin, Sigrid Friis, Barry Andrews, Sandro Gozi, Martin Hojsík, Yvan Verougstraete
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (cb) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point cb is added : |
|---|---|
| (cb) Geothermal energy technologies: | |
| From [OP: Please insert: 3 years after the entry into force of this Regulation], geothermal heating, cooling and power generation technologies, including enhanced geothermal systems, advanced geothermal systems and geothermal energy storage, and one main specific component shall originate in the Union. |
Or. en
Amendment 4350
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II part I– paragraph 1 – point (cc) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point cc is added : |
|---|---|
| (cc) From [3 years after entry into force of this Regulation], smart meters / advanced metering and control infrastructures shall originate within the Union. |
Or. en
Amendment 4351
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola, Jessika van Leeuwen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d)
| Text proposed by the Commission | Amendment |
|---|---|
| (d) Onshore and offshore wind technologies: | (d) Onshore wind technologies: |
Or. en
Justification
See the justification of the next amendment.
Amendment 4352
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | deleted |
Or. en
Amendment 4353
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least three of the following main specific components shall originate in the Union: nacelle assemblies, rotor hubs, main, yaw and pitch bearings, direct-drive drivetrains including generators or gearbox drivetrains including generators, permanent magnets, gearboxes, blades, towers and foundations or floaters. |
Or. en
Amendment 4354
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola, Jessika van Leeuwen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From the date entry into force of this Regulation one main specific component shall originate in the Union. |
Or. en
Justification
The amendment on the letter (d) is proposed aiming to shorten the timeline of main components that must originate in the Union. It accelerates the transition from one to two EU-origin components, strengthening European industrial capacity more quickly. The supply chain is already mature, with key NZIA-listed components already capable of meeting these requirements for IAA.
Amendment 4355
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From the date entry into force of this Regulation one main specific component shall originate in the Union. |
Or. en
Amendment 4356
Kathleen Van Brempt, Jens Geier, Marc Angel, Nicolás González Casares, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Javier Moreno Sánchez, José Cepeda, Hana Jalloul Muro, Lina Gálvez, Elena Sancho Murillo, Idoia Mendia, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the nacelles (assembly), blades, towers, and at least three additional main specific component shall originate in the Union. |
Or. en
Amendment 4357
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least the nacelles (assembly), blades, towers, and three additional main specific component shall originate in the Union. |
Or. en
Amendment 4358
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least three main specific components shall originate in the Union. |
Or. en
Amendment 4359
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], three main specific components shall originate in the Union. |
Or. en
Amendment 4360
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], three main specific component shall originate in the Union. |
Or. en
Amendment 4361
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 3 years after the entry into force of this Regulation], at least four of those main specific components shall originate in the Union, including the nacelle assembly and at least one of the following: the drivetrain including the generator, blades or foundations or floaters. |
Or. en
Amendment 4362
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph)
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 3 years after the entry into force of this Regulation], at least the nacelles (assembly), blades, towers, and three additional main specific components shall originate in the Union. |
Or. en
Amendment 4363
Kathleen Van Brempt, Jens Geier, Marc Angel, Nicolás González Casares, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Javier Moreno Sánchez, José Cepeda, Hana Jalloul Muro, Lina Gálvez, Elena Sancho Murillo, Idoia Mendia, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 3 years after the entry into force of this Regulation], the nacelles (assembly), blades, towers, and at least four additional main specific components shall originate in the Union. |
Or. en
Amendment 4364
Christophe Grudler
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 3 years after the entry into force of this Regulation], at least four main specific components of the wind turbine, including permanent magnets shall originate in the Union. |
Or. en
Amendment 4365
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 3 years after the entry into force of this Regulation], at least four main specific components shall originate in the Union. |
Or. en
Amendment 4366
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 3 years after the entry into force of this Regulation], four main specific components shall originate in the Union. |
Or. en
Amendment 4367
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 3 years after the entry into force of this Regulation], four main specific components shall originate in the Union. |
Or. en
Amendment 4368
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 1 years after the entry into force of this Regulation], two main specific components shall originate in the Union. |
Or. en
Amendment 4369
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation], two main specific components shall originate in the Union. |
Or. en
Amendment 4370
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (d) – second subparagraph)
| Text proposed by the Commission | Amendment |
|---|---|
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. | From [OP: Please insert the date = 1 year after the entry into force of this Regulation], two main specific components shall originate in the Union. |
Or. en
Justification
See the justification of the previous amendment.
Amendment 4371
Sigrid Friis, Barry Andrews, Christophe Grudler, Brigitte van den Berg
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (da) new
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point da is added: |
|---|---|
| (da) Electricity grid technologies: | |
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], cables and lines for electricity transmission and distribution, cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), smart meters or metering systems, inverters, converters, transformers, onshore and offshore substations, grid digitalisation and protection systems, shall originate in the Union. | |
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], cables and lines for electricity transmission and distribution, cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), smart meters or metering systems, inverters, converters, transformers, onshore and offshore substations, grid digitalisation and protection systems, shall originate in the Union. |
Or. en
Amendment 4372
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation EU 2024/1735
Annex II – part I – paragraph 1 – point (da) new
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point da is added : |
|---|---|
| (da) Electricity grid technologies: For auctions published from [OP: please insert the date corresponding to one year after the entry into force of this Regulation]: | |
| - for electricity grid technologies, the final products onshore substations and offshore substations with a voltage above 1 kV shall originate in the Union; | |
| - for electric charging technologies for transport, the final products shall originate in the Union. |
Or. en
Amendment 4373
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (da) new
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point da is added |
|---|---|
| (da) Electricity grid technologies: | |
| From [OP: please insert the date = 1 year after the entry into force of this Regulation], cables and lines used for electricity transmission and distribution, as well as cables connecting net-zero technologies to the electricity grid (including overhead lines, underground and subsea cables, whether HVAC or HVDC), shall originate in the Union. |
Or. en
Amendment 4374
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli, Klara Dostalova, Jana Nagyová, Ondřej Knotek, Jaroslav Bžoch, Tomáš Kubín
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (db) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point db is added : |
|---|---|
| (db) Geothermal technologies: From [OP: Please insert: 3 years after the entry into force of this Regulation], geothermal heating, cooling and power generation technologies, including hydrothermal systems, binary-cycle Organic Rankine Cycle systems, Enhanced Geothermal Systems and Advanced Geothermal Systems, shall originate in the Union. |
Or. en
Amendment 4375
Klara Dostalova, Jaroslava Pokorná Jermanová, Tomáš Kubín, Jaroslav Bžoch, Ondřej Knotek, Jana Nagyová, Jaroslav Knot, Anna Bryłka
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 point (e)
| Text proposed by the Commission | Amendment |
|---|---|
| (e) Nuclear fission technologies: | deleted |
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | |
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | |
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. |
Or. en
Justification
The global supply chain is irreplaceable for the nuclear energy sector. EU-only supply chain is not robust enough and most of the designs offered today have integrated non-EU suppliers, therefore no EU-only supply chain be created within a realistic timeframe for all required components to ensure effective competition. Imposing Union origin requirements for nuclear components (heavy forgings, special alloys, pressure vessels, fuel cycle components) would immediately hinder new nuclear construction in the EU Member States investing in nuclear, and would jeopardize SMR programes. The nuclear value chain depends critically on non-EU suppliers such as Westinghouse (US), and South Korean/Japanese partners. Partial EU sourcing can be explored only where EU manufacturing actually exists at the required technical specification.
Amendment 4376
Ondřej Krutílek
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e)
| Text proposed by the Commission | Amendment |
|---|---|
| (e) Nuclear fission technologies: | deleted |
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | |
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | |
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. |
Or. en
Amendment 4377
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II– part I – paragraph 1 – point (e)
| Text proposed by the Commission | Amendment |
|---|---|
| (e) Nuclear fission technologies: | deleted |
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | |
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | |
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. |
Or. en
Amendment 4378
Daniel Obajtek, Anna Zalewska, Jadwiga Wiśniewska, Jacek Ozdoba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e
| Text proposed by the Commission | Amendment |
|---|---|
| (e) Nuclear fission technologies: | deleted |
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | |
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | |
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. |
Or. en
Justification
Criteria regarding Union origin must take market realities into account and be aligned with technological conditions. The EU currently does not possess advanced nuclear fission technologies for SMRs., and their development is essential for achieving the EU's decarbonisation goals and reducing energy prices.
Amendment 4379
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II- part I – paragraph 1 – point (e)
| Text proposed by the Commission | Amendment |
|---|---|
| (e) Nuclear fission technologies: | deleted |
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | |
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | |
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. |
Or. en
Amendment 4380
Sofie Eriksson, Adnan Dibrani
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (e)
| Text proposed by the Commission | Amendment |
|---|---|
| (e) Nuclear fission technologies: | deleted |
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | |
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | |
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. |
Or. en
Amendment 4381
Sofie Eriksson, Adnan Dibrani
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | deleted |
Or. en
Amendment 4382
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | deleted |
Or. en
Amendment 4383
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), the contracting authority or contracting entity shall require the project to meet minimum European industrial content requirements, assessed at the level of the project as a whole in accordance with the criteria set out below. |
Or. en
Amendment 4384
Matej Tonin
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this EN United in diversity EN Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), the project-tailored “Made in EU” criteria defined in article 28d of Regulation (EU) 2024/1735 should be considered in the procurement process by procuring entities, in relation with Member States. |
Or. en
Justification
In line with AM 3 (IAA) and AM 5 (NZIA), this amendment, specific to nuclear fission technologies, establishes the arrangements for applying holistic “Made in EU” criteria in this sector. Nuclear is a clear example of a net-zero technology whose deployment relies on large-scale infrastructure projects and therefore requires a case-by-case approach. Projects differ significantly in terms of complexity and contractual structures—including extended EPC scopes covering interconnected systems organised in packages rather than individual components—as well as geographic location, installed generation capacity, potential cogeneration uses and the presence of a local nuclear ecosystem. They are also subject to significant national prerogatives, including nuclear safety and security frameworks and electricity grid structures. These specificities make a single NZIA component-based approach particularly ill-suited to nuclear projects. Given their high capital intensity and long delivery timescales, legal certainty must be established at an early stage. The amendment therefore proposes a tailored regulatory framework for nuclear fission technologies, with implementation entrusted to the Member States (cf. Article 7(3) new of the IAA Regulation and Article 28d(3) new of the NZIA Regulation), given their direct and systemic involvement in nuclear projects through State aid, public procurement and regulatory oversight.
Amendment 4385
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II –part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. |
Or. en
Amendment 4386
Julie Rechagneux, Aleksandar Nikolic, Mathilde Androuët, Virginie Joron, Christophe Bay, Thierry Mariani, Mélanie Disdier
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after entry into force of this Regulation where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular reactors (SMR), at least three main specific components shall originate in the Union. |
Or. fr
Amendment 4387
Claudiu-Richard Târziu
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II –part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
Or. ro
Justification
Public procurements of critical infrastructure must not be used as tools of ideological coercion. If the internal market cannot supply the necessary components quickly and cheaply, Member States must remain at liberty to contract with global strategic partners (such as the USA and South Korea) to ensure timely delivery of projects.
Amendment 4388
Maria Grapini, Andi Cristea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II –part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
Or. ro
Amendment 4389
Eszter Lakos, Dóra Dávid
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union or Partner Countries. |
Or. en
Justification
Necessary to ensure energy security and access to cutting-edge SMR technologies.
Amendment 4390
Kateřina Konečná
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least one main specific component shall originate in the Union. |
Or. en
Justification
Nuclear-grade components are subject to extensive qualification, testing, certification and design-compatibility requirements, while nuclear projects have long development, licensing, procurement and construction cycles. Requiring one main specific component after four years provides a realistic initial step towards greater Union participation without unnecessarily restricting access to qualified suppliers or creating additional project costs and delays.
Amendment 4391
Gheorghe Piperea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
| (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) |
Or. en
Amendment 4392
Dan Barna, Eugen Tomac, Katri Kulmuni, Barry Cowen, Cynthia Ní Mhurchú, Billy Kelleher
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part I – paragraph 1 – point e – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
Or. en
Amendment 4393
Georgiana Teodorescu
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
Or. en
Amendment 4394
Adina Vălean, Iuliu Winkler, Gheorghe Falcă
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
Or. en
Amendment 4395
Virgil-Daniel Popescu, Siegfried Mureşan, Daniel Buda, Dan-Ştefan Motreanu, Ioan-Rareş Bogdan, Mircea-Gheorghe Hava, Gheorghe Falcă, Loránt Vincze
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
Or. en
Amendment 4396
Sophie Wilmès, Benoit Cassart, Yvan Verougstraete
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraphn
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after entry into force of this Regulation where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. |
Or. en
Amendment 4397
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) –first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least two main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 4 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), all components shall originate in the Union. |
Or. en
Justification
As it is a new technology that Europe can decide to develop itself if it gives the correct political signals, it would not be appropriate to renounce to technology sovereignty and create unnecessary external dependencies
Amendment 4398
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (eb) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point eb is added : |
|---|---|
| Transformative industrial technologies for decarbonisation ; From [OP: Please insert the date = 3 years after entry into force of this Regulation], the technologies and their main specific components shall originate in the Union. |
Or. en
Amendment 4399
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e)- second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | deleted |
Or. en
Amendment 4400
Sofie Eriksson, Adnan Dibrani
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | deleted |
Or. en
Amendment 4401
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | deleted |
Or. en
Amendment 4402
Matej Tonin
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | deleted |
Or. en
Amendment 4403
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For the purposes of the first paragraph, the European industrial content of the project shall be assessed on the basis of the following criteria: |
| (a) the number and significance of main specific components and sub-components originating in the Union; | |
| (b) the ownership and control by undertakings established in the Union of intellectual property rights and relevant know-how associated with main specific components and sub-components; | |
| (c) the origin in the Union of materials used in the manufacture of main specific components and sub-components; | |
| (d) the extent to which manufacturing, processing and assembly operations relating to main specific components and sub-components are carried out in the Union; | |
| (e) the proportion of gross value added generated in the Union; | |
| (f) the extent to which the workforce used for the manufacturing and assembly of main specific components and sub-components is located in the Union; and | |
| (g) the extent to which long-term maintenance and servicing activities are carried out in the Union. | |
| Where the application of the criteria referred to in points (a) and (c) requires the determination of the origin of goods, such origin shall be determined in accordance with the applicable Union rules on non-preferential origin. Member States shall determine the minimum levels to be achieved in relation to the criteria referred to in points (a) to (g), and may adapt those levels to the specific characteristics of the project concerned, taking into account, in particular, the technology and scale of the project, nuclear safety requirements, the availability of relevant technologies, components and materials in the Union, security and resilience of supply, the need to ensure effective competition and the need to avoid disproportionate increases in costs or delays in project implementation. | |
| The Commission may adopt implementing acts establishing a common methodology for the assessment of the criteria referred to in points (a) to (g) |
Or. en
Amendment 4404
Claudiu-Richard Târziu
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II Part I Public procurement paragraph 1
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least three main specific components shall originate in the Union. |
Or. ro
Justification
Public procurements of critical infrastructure must not be used as tools of ideological coercion. If the internal market cannot supply the necessary components quickly and cheaply, Member States must remain at liberty to contract with global strategic partners (such as the USA and South Korea) to ensure timely delivery of projects.
Amendment 4405
Maria Grapini, Andi Cristea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Article 34 – point 8 – Annex II – Part I – point (e)
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least three main specific components shall originate in the Union. |
Or. ro
Amendment 4406
Eszter Lakos, Dóra Dávid
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II – Ppart I – point e – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union or Partner Countries. |
Or. en
Justification
Necessary to ensure energy security and access to cutting-edge SMR technologies from reliable EU partner countries.
Amendment 4407
Kateřina Konečná
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least two main specific components shall originate in the Union. |
Or. en
Justification
A two-component requirement after six years provides a gradual pathway towards increased Union participation in nuclear supply chains. The additional time is necessary for European manufacturing capacity, supplier qualification and certification to develop, particularly given the specialised nature of nuclear-grade components and the long procurement cycles of nuclear projects.
Amendment 4408
Virgil-Daniel Popescu, Siegfried Mureşan, Daniel Buda, Dan-Ştefan Motreanu, Ioan-Rareş Bogdan, Mircea-Gheorghe Hava, Gheorghe Falcă, Loránt Vincze
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least three main specific components shall originate in the Union. |
Or. en
Amendment 4409
Gheorghe Piperea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (e) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least three main specific components shall originate in the Union. |
| (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) |
Or. en
Amendment 4410
Dan Barna, Eugen Tomac, Katri Kulmuni, Barry Cowen, Cynthia Ní Mhurchú, Billy Kelleher
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least three main specific components shall originate in the Union. |
Or. en
(Regulation (EU) 2024/1735)
Amendment 4411
Adina Vălean, Iuliu Winkler, Gheorghe Falcă
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least three main specific components shall originate in the Union. |
Or. en
Amendment 4412
Georgiana Teodorescu
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, at least three main specific components shall originate in the Union. |
Or. en
Amendment 4413
Sophie Wilmès, Benoit Cassart, Yvan Verougstraete
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point e – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 3 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. |
Or. en
Amendment 4414
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part I – paragraph 1 – point e – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For public procurement procedures published after [OP: Please insert the date = 6 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least three main specific components shall originate in the Union. | For public procurement procedures published after [OP: Please insert the date = 3 years after entry into force of this Regulation] where works contracts or work concessions include the construction on a new-build nuclear power plant, including small modular nuclear reactors (SMR), at least four main specific components shall originate in the Union. |
Or. en
Amendment 4415
Sophie Wilmès, Yvan Verougstraete
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | deleted |
Or. en
Amendment 4416
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Brando Benifei, François Kalfon, Stefano Bonaccini
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | deleted |
Or. en
Amendment 4417
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II– part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | deleted |
Or. en
Amendment 4418
Piotr Müller
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, nor to projects for which, before [OP: Please insert the date of entry into force of this Regulation], the Member State concerned has adopted a decision in principle or an equivalent decision, has concluded an intergovernmental agreement, has adopted a decision on the environmental conditions or on the site, or for which a contract with the technology supplier has been concluded; that exemption shall also cover subsequent modifications and additional units at the same site using the same technology. For the purposes of this point, content originating in a third country shall be deemed to be of Union origin where that third country is a member of the Organisation for Economic Co-operation and Development, is not subject to restrictive measures adopted pursuant to Article 215(1) TFEU interrupting or reducing economic and financial relations with it, and has concluded with the Union, the European Atomic Energy Community or a Member State an agreement for cooperation in the peaceful uses of nuclear energy. Main specific components shall not be used in new-build nuclear power plants, including in the projects exempted under the first sentence, under contracts, including subcontracts and orders for main specific components, concluded after [OP: Please insert the date of entry into force of this Regulation], where they originate in the Russian Federation or the Republic of Belarus, or in a third country whose economy is described, in the most recent report concerning that country published by the Commission pursuant to Article 2(6a), point (c), of Regulation (EU) 2016/1036, as affected by significant distortions resulting from State intervention, or where they are manufactured by undertakings controlled, within the meaning of Article 3(2) of Council Regulation (EC) No 139/2004, by such a country or by natural or legal persons having their residence or registered office there, or by undertakings in respect of which the Commission has found, pursuant to Regulation (EU) 2022/2560, that foreign subsidies distort the internal market, until the commitments or redressive measures imposed under that Regulation have been fully implemented. Content originating in such countries shall in no case be deemed to be of Union origin. The origin of a main specific component shall be determined in accordance with Article 60 of Regulation (EU) No 952/2013. |
Or. en
Justification
Nuclear projects take a decade to prepare and the plants operate for many decades. Advanced projects should not be disrupted. Equivalence should cover OECD partners not subject to Union economic sanctions. Components from the Russian Federation, which uses energy as a weapon, or from economies distorted by State subsidies must be excluded. The exclusion follows from this Regulation itself, relies on existing Union findings and respects contracts already concluded.
Amendment 4419
Virgil-Daniel Popescu, Siegfried Mureşan, Daniel Buda, Dan-Ştefan Motreanu, Ioan-Rareş Bogdan, Mircea-Gheorghe Hava, Gheorghe Falcă, Loránt Vincze
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. as well as to mature nuclear projects in advanced stages of development (engineering, licensing, procurement, and financing) which already received the positive opinion from the European Commission under Article 41 of the Euratom Treaty. |
Or. en
Amendment 4420
Adina Vălean, Iuliu Winkler, Gheorghe Falcă
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, as well as to mature nuclear projects in advanced stages of development (engineering, licensing, procurement, and financing) which already received the positive opinion from the European Commission under Article 41 of the Euratom Treaty. |
Or. en
Amendment 4421
Georgiana Teodorescu
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
ANNEX II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, as well as to mature nuclear projects in advanced stages of development (engineering, licensing, procurement, and financing) which already received the positive opinion from the European Commission under Article 41 of the Euratom Treaty. |
Or. en
Amendment 4422
Gheorghe Piperea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, as well as to mature nuclear projects in advanced stages of development (engineering, licensing, procurement, and financing) which already received the positive opinion from the European Commission under Article 41 of the Euratom Treaty. |
| (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) |
Or. en
Amendment 4423
Dan Barna, Vlad Vasile-Voiculescu, Eugen Tomac, Katri Kulmuni, Bart Groothuis, Barry Cowen, Cynthia Ní Mhurchú, Billy Kelleher, João Cotrim De Figueiredo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, as well as to mature nuclear projects in advanced stages of development (engineering, licensing, procurement, and financing) which already received a positive opinion from the European Commission under Article 41 of the Euratom Treaty. |
Or. en
Amendment 4424
Maria Grapini, Andi Cristea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Article 34 – point 8 – Annex II – Part I – point (e)
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, or to mature nuclear projects at an advanced stage of development (engineering, authorisation, procurement and financing), that have already received a positive opinion from the European Commission under Article 41 of the Euratom Treaty. |
Or. ro
Amendment 4425
Claudiu-Richard Târziu
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II Part I Public procurement paragraph 1
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, or to mature nuclear projects at advanced stages of development (engineering, authorisation, procurement and financing), that have already received a favourable opinion from the European Commission under Article 41 of the Euratom Treaty. |
Or. ro
Justification
Public procurements of critical infrastructure must not be used as tools of ideological coercion. If the internal market cannot supply the necessary components quickly and cheaply, Member States must remain at liberty to contract with global strategic partners (such as the USA and South Korea) to ensure timely delivery of projects.
Amendment 4426
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e – third subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants. | These requirements shall not apply to research, development and innovation projects including first industrial deployment of nuclear power plants, as well as to projects supported by a Decision in Principle, undergoing advanced environmental assessments and undertaking advanced design activities under concluded agreements with the technology supplier. |
Or. en
Amendment 4427
Kateřina Konečná
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point e –subparagraph 4 (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point e a subparagraph 4 is added: |
|---|---|
| The Union-origin requirements for nuclear fission energy technologies shall not apply to small modular nuclear reactors (SMR). |
Or. en
Justification
SMRs are at an earlier stage of industrial development and their supply chains are still being established. Applying fixed Union-origin component requirements to first deployments could limit supplier choice before sufficient qualified European capacity exists. Excluding SMRs from these requirements therefore preserves the flexibility needed for their initial deployment and for the development of a competitive European supply chain.
Amendment 4428
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point (ea) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added : |
|---|---|
| (ea) Carbon capture and storage technologies: From [OP: Please insert the date = 3 years after entry into force of this Regulation], at least two main specific components of the carbon capture equipment concerned shall originate in the Union. | |
| The main specific components referred to in the first subparagraph shall be those identified for the relevant carbon capture technology in the applicable Union list of net-zero technology final products and their main specific components. |
Or. en
Amendment 4429
Thomas Pellerin-Carlin, Pierre Jouvet, Christophe Clergeau, Jean-Marc Germain
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) Electricity grid technologies and critical grid components: From [OP: Please insert the date = 1 year after entry into force of this Regulation], the following main specific components, to the extent that they are included in the subject-matter of the procurement, shall originate in the Union: (i) supervisory control and data acquisition (SCADA) systems and control systems; (ii) digital protection and automation systems; (iii) smart meters or metering systems; (iv) storage-related control systems; (v) operational technology (OT) and information technology (IT) communication systems and OT cybersecurity systems, including gateways, industrial routers and switches, radios and modems, and remote access components; (vi) sensors and monitoring systems; (vii) offshore substations, including offshore converter platforms (assembly). From [OP: Please insert the date = 3 years after entry into force of this Regulation], in addition to the components referred to in the first subparagraph, at least four of the following main specific components with a rated voltage above 1 kV, or all of them where fewer than four are included in the subject-matter of the procurement, shall originate in the Union: (i) switchgear, circuit breakers and protection relays; (ii) power transformers; (iii) inverters and converters, including high-voltage direct current (HVDC) converters; (iv) cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid, including overhead lines and underground and submarine cables, both HVDC and HVAC, and conductors; (v) capacitors and reactive power compensation equipment; (vi) onshore substations (assembly). |
Or. en
Justification
Grid technologies are recognised as strategic net-zero technologies under Regulation (EU) 2024/1735 but are not covered by the Union origin requirements of Annex II. In many Member States, grids and offshore grid connections are procured by regulated transmission and distribution system operators subject to public procurement rules, which makes public procurement the main lever for Union demand.The amendment follows a component-based, two-phased approach. Active components come first, given the cybersecurity risks they raise, and are set out in a closed list to ensure legal certainty. The assembly of offshore substations is also covered from the first phase, as Union capacity already exists and a component-only approach would allow substations built outside the Union to comply through a single low-value Union component. Passive and heavy equipment above 1 kV follows after three years, with a minimum of four components, to reduce strategic dependencies while allowing Union manufacturing capacity to be scaled up. According to industry estimates, requiring the assembly of offshore substations in the Union would raise the cost of electricity from an offshore wind farm by around 1 to 1.5%.
Amendment 4430
Christophe Grudler, Stéphanie Yon-Courtin, Sigrid Friis, Sandro Gozi, Martin Hojsík, Ľubica Karvašová, Brigitte van den Berg, Yvan Verougstraete
Proposal for a regulation
Article 34 – paragraph 1 – point 8a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) Electricity grid technologies: | |
| From [OP: Please insert the date = 1 year after entry into force of this Regulation], smart meters or metering systems, inverters, converters, offshore substations, cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC) shall originate in the Union. | |
| From [OP: Please insert the date = 3 year after entry into force of this Regulation], in addition to the requirements set out in the preceding paragraph, switchgear, circuit breakers, protection relays, transformers, conductors and high- and medium-voltage power electronics (including DC technologies) shall originate in the Union. |
Or. en
Amendment 4431
Pierre Jouvet, Raphaël Glucksmann, Jean-Marc Germain, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment |
|---|---|
| (ea) Electricity grid technologies: from [OP: Please insert the date = one year after entry into force of this Regulation], power transformers, switchgear, high-voltage direct-current converter stations, and their main specific components, as well as terrestrial and subsea transmission and distribution cables acquired for the construction, extension, reinforcement or replacement of electricity transmission and distribution networks, shall originate in the Union. Article 25a(3), point (c), shall not apply to products within the meaning of this point. |
Or. fr
Justification
The impact analysis recommended that grid equipment be covered, but the proposal has omitted it. European cable and transformer manufacturers are increasing their capacity, and cables are not a bottleneck. The safety of equipment that has been connected to the grid for decades cannot be sacrificed for the sake of their purchase price.
Amendment 4432
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part 1 – paragraph 1 – point ea
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) Electricity grid technologies: | |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], onshore and offshore substations (avobe 1kV), cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), power transformers, inverters, converters, high-voltage (above 1 kV) switgear compliant with Regulation (EU) 2024/573, electric cabinets protection relays and smart circuit breakers shall originate within the Union. |
Or. en
Amendment 4433
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Javier Moreno Sánchez, José Cepeda, Hana Jalloul Muro, Lina Gálvez, Elena Sancho Murillo, Laura Ballarín Cereza, Nicolás González Casares, Idoia Mendia, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) (f) Hydrogen: From [OP: Please insert the date = 1 year after the entry into force of this Regulation] where contracts include the procurement of electrolysers, or of hydrogen produced with electrolysers, the stacks as well as one additional main specific component shall originate in the Union. | |
| For public procurement procedures published after [OP: Please insert the date = 3 years after the entry into force of this Regulation], the stacks as well as two additional main specific components shall originate in the Union |
Or. en
Amendment 4434
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) f) Offshore wind technologies: From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. |
Or. en
Justification
As regards wind technologies, the amendment proposes to differentiate the phase timing for onshore and offshore wind technologies. A diluted approach is necessary regarding offshore wind, which projects are characterized by specific technical, industrial and project-development constraints, including larger components, more complex installation and maintenance requirements, longer lead times and more specialized supply chains. Hence requirements shall be designed for offshore technologies to a segment with materially different industrial and deployment conditions.
Amendment 4435
Christophe Clergeau, Pierre Jouvet
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) From [OP: date = 1 year after the entry into force of the Regulation]: electrical substations, smart meters, electric vehicle charging equipment, electricity transmission and distribution cables and lines, cables connecting net-zero technologies to the electricity grid (overhead lines, underground and submarine cables, including HVDC and HVAC), power transformers, switchgear, circuit breakers and capacitors. |
Or. en
Amendment 4436
Davor Ivo Stier
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Article 34, paragraph 1, point (8)
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) Electricity grid technologies: From [OP: please insert the date = 1 year after entry into force of this Regulation], transformers, switchgear, high-voltage direct current transmission equipment, onshore and offshore substations, grid digitalisation and protection systems, and other strategic electricity network technologies identified by delegated act shall originate in the Union. |
Or. en
Amendment 4437
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II – part I –paragraph 1 - point (ea) new
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added |
|---|---|
| (ea) Hydrogen: From [1 year after entry into force] until [OP: Please insert the date = 3 years after the entry into force of this Regulation], where contracts include the procurement of electrolysers, or of hydrogen produced with electrolysers, those electrolysers, including the stacks as well as one additional main specific component shall originate in the Union. |
Or. en
Amendment 4438
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) (f) Geothermal technologies: From [OP: Please insert: 3 years after the entry into force of this Regulation], geothermal heating, cooling and power generation technologies, including hydrothermal systems, binary-cycle Organic Rankine Cycle systems, Enhanced Geothermal Systems and Advanced Geothermal Systems, shall originate in the Union. |
Or. en
Amendment 4439
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation EU 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) electricity grid technologies: | |
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], high-voltage (above 1 kV) switchgear compliant with Regulation (EU) 2024/573 shall originate in the Union. |
Or. en
Justification
The EU industry has made and continues to make a major effort to develop high-voltage switchgear (above 1 kV) and the associated manufacturing processes and plants that comply with Regulation (EU) 2024/573 on fluorinated gases, so that current SF6 emissions, which contribute a modest 0.1% annually to the EU's CO2 equivalent emissions, are virtually zero in all new high-voltage electrical switchgear by 2032. This effort must be supported by the EU Member States.
Amendment 4440
Angelika Winzig
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) ea) Electric charging technologies for transport: | |
| From [OP: Please insert the date = 2 years after the entry into force of this Regulation], electric vehicle supply equipment, shore-side electricity supply equipment and electric air transport supply equipment shall originate in the Union. |
Or. en
Amendment 4441
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendmen (8a) In Annex II part I paragraph 1 point ea is added: t |
|---|---|
| (ea) Electric charging technologies for transport (EVSE) [OP: Please insert: 1 years after the entry into force of this Regulation] the electric charging technologies for transport (EVSE) shall originate in the Union. |
Or. en
Amendment 4442
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II– part I – paragraph 1 – point ea (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ea is added: |
|---|---|
| (ea) Electricity grid technologies; |
Or. en
Amendment 4443
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point eb (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point eb is added: |
|---|---|
| (eb) Electricity grid technologies: From [OP: Please insert the date = 1 year after entry into force of this Regulation], cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), transformers, switchgear, high-voltage direct current transmission equipment, onshore and offshore substations, grid digitalisation and protection systems shall originate in the Union. |
Or. en
Amendment 4444
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point eb (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point eb is added: |
|---|---|
| (eb) (g) Offshore wind technologies: From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. |
Or. en
Amendment 4445
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation EU 2024/1735
Annex II–part I – paragraph 1 – point eb (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point eb is added: |
|---|---|
| (eb) Electricity grid technologies: From [OP: please insert the date corresponding to one year after the entry into force of this Regulation]: | |
| - for electricity grid technologies, the final products onshore substations and offshore substations with a voltage above 1 kV shall originate in the Union; | |
| - for electric charging technologies for transport, the final products shall originate in the Union. |
Or. en
Amendment 4446
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II – part I –paragraph 1 - point (eb) new
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point eb is added |
|---|---|
| (eb) Hydrogen: From [3years after entry into force], where contracts include the procurement of electrolysers, or of hydrogen produced with electrolysers, those electrolysers, including the stacks as well as two additional main specific component shall originate in the Union. |
Or. en
Amendment 4447
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part 1 – Paragraph 1 – point eb (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point eb is added: |
|---|---|
| (eb) Technologies to digitalise the grid and other electricity grid technologies: | |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], smart meters, advanced metering and control infrastructures shall originate within the Union. |
Or. en
Amendment 4448
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ec (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ec is added: |
|---|---|
| (ec) Energy system-related energy efficiency technologie; | |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation],at least three main specific component of the relevant energy system-related energy efficiency technology shall originate in the Union. | |
| For the purposes of this point, main specific components shall include, where applicable, energy management systems, building automation systems, automated demand-response systems, variable-speed drives, Organic Rankine Cycle turbines and heating and cooling distribution system pipework. |
Or. en
Amendment 4449
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ec (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ec is added: |
|---|---|
| (ec) (h) Electricity grid technologies: From [OP: Please insert the date = 1 year after entry into force of this Regulation], cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC) shall originate in the Union. |
Or. en
Amendment 4450
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part I – paragraph 1 – point ed (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point ed is added: |
|---|---|
| (ed) Hydrogen: From [1 year after entry into force], where contracts include the procurement of electrolysers, or of hydrogen produced with electrolysers, at least three out of four main specific components, including the stacks, of the electrolysers shall originate in the Union. |
Or. en
Amendment 4451
Niels Flemming Hansen
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex I – part I – paragraph 1 – point fa (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point fa is added: |
|---|---|
| (fa) Electricity grid technologies: From [OP: Please insert the date = 1 year after entry into force of this Regulation], cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC) shall originate in the Union. |
Or. en
Amendment 4452
Dimitris Tsiodras
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (E) 2024/1735
Annex II, Part I – paragraph 1 – point fa (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part I paragraph 1 point fa is added: |
|---|---|
| (fa) Solar thermal technologies: The solar thermal collector shall originate within the Union. |
Or. en
Justification
Solar thermal energy is a key EU-made technology enabling the decarbonisation of heating systems of many buildings subject to public procurement (e.g. social housing, hospitals, swimming pools, care homes, etc.) and district heating networks. Consequently, solar thermal collectors manufactured in Europe should be given priority in public procurement, otherwise there is a risk of favouring imports.
Amendment 4453
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II - part II - paragraph 1 introductory part
| Text proposed by the Commission | Amendment |
|---|---|
| In accordance with Article 26, when auctions have the following net-zero technologies as part of their subject-matter, Member States shall include the pre-qualification or award criteria laid down below: | In accordance with Article 26, when auctions have the following net-zero technologies as part of their subject-matter, Member States shall include the pre-qualification criteria laid down below: |
Or. en
Amendment 4454
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part II – part II – paragraph 1 – introductory part
| Text proposed by the Commission | Amendment |
|---|---|
| In accordance with Article 26, when auctions have the following net-zero technologies as part of their subject-matter, Member States shall include the pre-qualification or award criteria laid down below: | In accordance with Article 26, when auctions have the following net-zero technologies as part of their subject-matter, Member States shall include the pre-qualification criteria laid down below: |
Or. en
Amendment 4455
Daniel Attard, Alex Agius Saliba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Article 26 – part 2- paragraph 1 – point a
| Text proposed by the Commission | Amendment |
|---|---|
| (a) Battery energy storage systems: | deleted |
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | |
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. |
Or. en
(See Article 26 paragraph 2 point a of Regulation (EU) 2024/1735.)
Justification
See justification for Amendment 8. Deleting point (a) would avoid imposing additional costs on Malta’s planned public battery storage projects, estimated between EUR 3.46 million to EUR 6.63 million. As a small, isolated market, Malta faces higher transport and maintenance costs and has less scope to secure volume discounts. Applying the same requirements as in larger markets could strain public budgets and delay storage projects needed for the energy transition.
Amendment 4456
Pierre Jouvet, Raphaël Glucksmann, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | (a) Battery energy storage systems: For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system, power-conversion system and energy-management system that originate in the Union. |
Or. fr
Amendment 4457
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | From [OP: Please insert the date = 1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the battery energy storage systems shall be assembled in the Union and contain the BESS PCS that originates in the Union. |
Or. en
Amendment 4458
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originates in the Union: power plant control, inverter and battery cells. |
Or. en
Amendment 4459
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originate in the Union: power plant control, inverter and battery cells. |
Or. en
Amendment 4460
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (a)- first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 2 year after entry into force of this Regulation] until [5 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union, and 35 % of the strategic raw material used in the battery energy storage systems are recycled. |
Or. en
Justification
To build a truly European battery supply chain, the EU should also ensure that the raw materials used in the batteries originate in the EU and promoting recycling is key to achieve this goal. As recycling of some strategic raw materials is still at an early stage of market deployment, it is however appropriate to extend the deadlines.
Amendment 4461
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola, Jessika van Leeuwen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [ 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originates in the Union: power plant control, inverter and battery cells. |
Or. en
Justification
Battery energy storage systems should be considered as integrated systems. Union origin requirements should therefore cover not only the battery management system but also components that are essential for storage performance, system control and grid integration, strengthening the European value chain from the first phase of implementation.
Amendment 4462
Bart Groothuis, Nikola Minchev, Christophe Grudler, Jeannette Baljeu, Morten Løkkegaard, Sandro Gozi, Sophie Wilmès, Benoit Cassart, Dan Barna, Brigitte van den Berg, Sigrid Friis, Ivars Ijabs
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
ANNEX II - part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system and a power conversion system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Justification
The power conversion system links a battery to the grid and can be controlled remotely. Like the battery management system, it should be listed as a component, to reduce dependency and cybersecurity risks.
Amendment 4463
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 2 years after entry into force of this Regulation] until [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Amendment 4464
Daniel Obajtek, Marion Maréchal, Anna Zalewska, Jadwiga Wiśniewska, Jacek Ozdoba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 3 year after entry into force of this Regulation] until [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Justification
The postponement allows sufficient time for Union manufacturing capacity for battery energy storage systems and battery management systems to scale up. Applying the Union-origin requirements too early could create supply bottlenecks, increase project costs and delay the deployment of energy-storage projects essential for the clean-energy transition.
Amendment 4465
Barry Andrews, Billy Kelleher, Cynthia Ní Mhurchú, Barry Cowen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], for projects including battery energy storage exceeding 1 Megawatt-hour, the battery energy storage system shall originate in the Union and contain a battery management system that originates in the Union. |
Or. en
Amendment 4466
Barry Cowen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. |
| For battery energy storage systems, Member States shall not be required to apply the prequalification or award criteria laid down in Article 26, paragraph 2a where the battery energy storage system uses a battery chemistry for which the cumulative EUinstalled capacity does not exceed 5 Gigawatt at the time of publication of the auction procedure. Where a Member State chooses to apply a Union origin criterion for such systems, it shall do so only as an award criterion within the weighting range established by Article 26, paragraph 4. |
Or. en
Amendment 4467
Barry Andrews, Billy Kelleher, Cynthia Ní Mhurchú, Barry Cowen, Bart Groothuis
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II– part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. For battery energy storage systems, Member States shall not be required to apply the pre-qualification or award criteria laid down in Article 26, paragraph 2a where the battery energy storage system uses a battery chemistry for which the cumulative EU-installed capacity does not exceed 5 Gigawatt at the time of publication of the auction procedure. Where a Member State chooses to apply a Union origin criterion for such systems, it shall do so only as an award criterion within the weighting range established by Article 26, paragraph 4. |
Or. en
Amendment 4468
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Delara Burkhardt, Bruno Tobback, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, cathode active material, a battery management system as well as one additional main specific components that originate in the Union and recycled content originating in the Union, in accordance with the requirements on minimum levels of recycled content laid down in Regulation (EU) 2023/1542 (EU Battery Regulation), and verified pursuant to that Regulation’s rules on the calculation, declaration and traceability of recycled content. At least 20% of the relevant strategic raw materials used shall be mined, processed or recycled within the European Union. By 2036, this threshold shall rise to as least 40%. |
Or. en
Amendment 4469
Pierre Jouvet, Raphaël Glucksmann, Jean-Marc Germain, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, cathode active material, a battery management system, power-conversion system and energy-management system, as well as one additional main specific component that originate in the Union. At least 20 % of the relevant strategic raw materials used in them must have been extracted, processed or recycled in the Union or in an overseas country or territory listed in Annex II to the TFEU. By 2036, this threshold shall rise to at least 40 %. |
Or. fr
Justification
Consistency with Part I. The overseas countries and territories (OCTs) associated with the Union may contribute to the resilience and security of its supply chains for strategic raw materials. The strategic raw materials that are extracted, processed or recycled from them must therefore be included under the equivalent requirements.
Amendment 4470
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | From [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall shall be assembled in the Union and contain the BESS PCS, the Battery Management System (BMS), EMS/SCADA and the battery cellthat originate in the Union. |
| Only after a mandatory and thorough assessment of the Union BESS manufacturing capacity confirms that such requirements would neither disrupt the deployment of battery energy storage systems nor create supply constraints, shall battery cells, battery management systems (BMS) and EMS/SCADA systems be required to originate in the Union in Phase II. |
Or. en
Amendment 4471
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (a)- second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union, and 35 % of the strategic raw materials used in the battery energy storage systems are recycled. |
Or. en
Justification
To build a truly European battery supply chain, the EU should also ensure that the raw materials used in the batteries originate in the EU and promoting recycling is key to achieve this goal. As recycling of some strategic raw materials is still at an early stage of market deployment, it is however appropriate to extend the deadlines.
Amendment 4472
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published from [OP: Please insert the date = 3 years after entry into force of this Regulation] until [5 years after entry into force of this Regulation] , the battery energy storage system shall originate in the Union and contain battery cells, the binders, a battery management system, as well as one additional main specific components that originate in the Union. . |
Or. en
Amendment 4473
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter as well as one additional main specific component that originate in the Union. |
Or. en
Amendment 4474
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter as well as one additional main specific components that originate in the Union. |
Or. en
Amendment 4475
Bart Groothuis, Nikola Minchev, Christophe Grudler, Jeannette Baljeu, Morten Løkkegaard, Sandro Gozi, Sophie Wilmès, Benoit Cassart, Dan Barna, Brigitte van den Berg, Sigrid Friis, Ivars Ijabs
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system, a power conversion system as well as one additional main specific components that originate in the Union. |
Or. en
Justification
The power conversion system links a battery to the grid and can be controlled remotely. Like the battery management system, it should be listed as a component, to reduce dependency and cybersecurity risks.
Amendment 4476
Andrea Wechsler, Christian Ehler, Angelika Niebler, Jens Gieseke, Andreas Schwab, Norbert Herhammer, Hildegard Bentele, Markus Ferber, Oliver Schenk, Christian Doleschal, Monika Hohlmeier, Verena Mertens, Ralf Seekatz, Marie-Sophie Christ, Alexandra Mehnert, Norbert Lins, Marion Walsmann
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II– part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, cathode active materials, a battery management system as well as one additional main specific components that originate in the Union. |
Or. en
Justification
Cathode active materials are a key value-creating step in battery production and are strategically important for European battery resilience.
Amendment 4477
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as at least one additional main specific components that originate in the Union. |
Or. en
Amendment 4478
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions publisehd after 1 year after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter as well as one additional main specific components that originate in the Union. |
Or. en
Justification
A stronger Union origin requirement should apply at an early stage where European manufacturing capacity is available or developing. Covering the main technological components of battery energy storage systems provides a stronger demand signal for investment and reduces dependencies across the integrated BESS value chain.
Amendment 4479
Daniel Obajtek, Marion Maréchal, Anna Zalewska, Jadwiga Wiśniewska, Jacek Ozdoba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For auctions published after [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage system shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. |
Or. en
Justification
The postponement allows sufficient time for Union manufacturing capacity for battery energy storage systems and battery management systems to scale up. Applying the Union-origin requirements too early could create supply bottlenecks, increase project costs and delay the deployment of energy-storage projects essential for the clean-energy transition.
Amendment 4480
Seán Kelly
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II - part II – paragraph 1 – point a – third subparagraph (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point a a third subparagraph is added: |
|---|---|
| For battery energy storage systems, Member States shall not be required to apply the prequalification or award criteria laid down in Article 26, paragraph 2a where the battery energy storage system uses a battery chemistry for which the cumulative EU installed capacity does not exceed 5 Gigawatt at the time of publication of the auction procedure. Where a Member State chooses to apply a Union origin criterion for such systems, it shall do so only as an award criterion within the weighting range established by Article 26, paragraph 4. |
Or. en
Justification
Auctions are the primary route to market for large-scale BESS deployment, making the scope of Union origin criteria here particularly consequential. This amendment aims to ensure that Union origin requirements in auctions apply only where EU manufacturing capacity actually exists to meet them (defined as battery chemistries with at least 5 GW of cumulative EU installed capacity) so that the requirements function as a genuine industrial policy lever rather than a barrier to deploying technologies the EU grid urgently needs.
Amendment 4481
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II - part II – paragraph 1 – point a – third subparagraph (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point (a) a following subparagraph is added: |
|---|---|
| From [OP: Please insert the date = 5 years after entry into force of this Regulation] the battery energy storage systems shall originate in the Union and contain battery cells, the binders, cathode active materials, a battery management system, as well as one additional main specific component that originate in the Union. At least 20% of lithium used shall be extracted, processed or recycled within the Union. |
Or. en
Amendment 4482
Regina Doherty
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point a – third subparagraph (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point a a third subparagraph is added: |
|---|---|
| For battery energy storage systems, Member States shall not be required to apply the prequalification or award criteria laid down in Article 26, paragraph 2a where the battery energy storage system uses a battery chemistry for which the cumulative EUinstalled capacity does not exceed 5 Gigawatt at the time of publication of the auction procedure. Where a Member State chooses to apply a Union origin criterion for such systems, it shall do so only as an award criterion within the weighting range established by Article 26, paragraph 4. |
Or. en
Justification
Auctions are the primary route to market for large-scale BESS deployment, making the scope of Union origin criteria here particularly consequential. The amendment aims to ensure that Union origin requirements in auctions apply only where EU manufacturing capacity actually exists to meet them (defined as battery chemistries with at least 5 GW of cumulative EU installed capacity) so that the requirements function as a genuine industrial policy lever rather than a barrier to deploying technologiesthe EU grid urgently needs.
Amendment 4483
Zala Černilec Tomašič
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II– part II – paragraph 1 – point aa (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point aa is added |
|---|---|
| (aa) Where Union origin requirements apply to steel under this Annex, steel which has been melted and poured in the Union, including steel produced predominantly from ferrous scrap in electric arc furnaces, shall be considered to be of Union origin, irrespective of the origin of the primary iron input. The use of ferrous scrap and other secondary raw materials shall be recognised as contributing to the low-carbon classification of steel referred to in Article 10. |
Or. en
Amendment 4484
Piotr Müller
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1- point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter shall originate in the Union and the PV modules shall be assembled in the Union. For auctions published after [OP: Please insert the date = 5 years after entry into force of this Regulation], the PV cells or equivalent shall also originate in the Union, provided that the Commission has established, by means of an implementing act adopted in accordance with the examination procedure referred to in Article 45(3) by [OP: Please insert the date = 4 years after entry into force of this Regulation], that Union manufacturing capacity for PV cells is sufficient to meet the expected demand without price increases which are disproportionate in comparison with world market prices, taking into account the security of supply. |
Or. en
Justification
Union production of PV cells is marginal. Requiring Union cells in auctions after three years would raise auction prices, which are passed on to electricity consumers. Inverters and module assembly build on existing Union capacity and inverters are a matter of grid security. Cells should follow only once the Member States, through an implementing act, have confirmed that capacity and prices allow it.
Amendment 4485
Maria Grapini
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Article 34 – Annex II – Part II – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: |
| For auctions published from [OP: Please insert the date = one year after entry into force of this Regulation] until [OP: Please insert the date = three years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV tracking systems and associated specific mountings, and one additional main specific component shall originate in the Union. | |
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter, the polysilicon, the PV cells or equivalent, the PV tracking systems and associated specific mountings, as well as two additional main specific components shall originate in the Union. |
Or. ro
Amendment 4486
Pierre Jouvet, Raphaël Glucksmann, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [OP: Please insert the date = one year after entry into force of this Regulation], the PV inverter, the polysilicon and one additional main specific component, namely the solar trackers and their specific mounting structures where the project includes them, shall originate in the Union. For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent and two additional main specific components, including the solar trackers and their specific mounting structures where the project includes them, shall originate in the Union. |
Or. fr
Justification
Solar trackers and their mounting structures were already main specific components within the meaning of Regulation (EU) 2024/1735, but they avoided scrutiny owing to the lack of dedicated customs codes, so European capacity, which largely consists of SMEs in galvanisation and metal structures, is being eroded. Mentioning them by name will make the requirement applicable.
Amendment 4487
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation PV cells or equivalent, PV inverters and at least one of the following additional main specific components shall originate in the Union: PV-grade polysilicon, PV-grade silicon ingots or equivalent, PV wafers or equivalent, solar glass, PV modules, or PV trackers and their specific mounting structures. |
| From 1 January 2035, PV cells or equivalent, PV inverters and at least three of the additional main specific components referred to in the second subparagraph shall originate in the Union. |
Or. en
Amendment 4488
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part II – paragraph 1 -point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: |
| For auctions published from [1 year after entry into force of this Regulation] until [3 years after entry into force of this Regulation], the PV inverter, and one additional main specific component shall originate in the Union; | |
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter, the polysilicon, and the PV cells or equivalent, as well as one additional main specific component shall originate in the Union. |
Or. en
Amendment 4489
Seán Kelly
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II– part II – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [3 years after entry into force of this Regulation], the PV inverter shall originate in the Union. The requirement that the PV cells or equivalent originate in the Union shall apply only where the Commission has demonstrated, through the assessment referred to in Article 29(2), that sufficient Union manufacturing capacity exists in terms of volume, cost and delivery timelines to meet the volumes subject to this Annex without delaying deployment. |
Or. en
Justification
The proposed PV-cell requirement should be made conditional on demonstrated Union capacity to deliver on it.
Amendment 4490
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part II – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar technologies: For auctions published after [OP: Please insert the date = 1 years after entry into force of this Regulation], PV inverter, the polysilicon and one additional main specific component shall originate in the Union. |
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter the polysilicon and the PV cells or equivalent as well as two additional main specific components shall originate in the Union. |
Or. en
Amendment 4491
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza, Jonás Fernández
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 1 year after entry into force of this Regulation], PV inverter, the polysilicon and one additional main specific components shall originate in the Union. |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent as well as three additional main specific components shall originate in the Union. |
Or. en
Amendment 4492
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [OP: Please insert the date =1 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. |
| From the date entry into force of this Regulation the PV inverter, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Justification
The amendment on letter (b) aims to calibrate the timing of Union origin requirements more closely to the technical relevance and strategic criticality of the components concerned in the solar PV and wind value chains. Reducing the transition period for PV inverters and modules from three years to one year ensures that the Regulation produces an earlier industrial effect and provides a clear demand signal for European manufacturers. At the same time, PV cells remain one of the most critical manufacturing steps in the solar value chain, with a promising new supply chain. It is important to underline that cell manufacturing requires more capital-intensive production investment, hence the amendment proposed aims to reduce the transition period for PV cells, strengthening the demand signal for European cell production while maintaining a technically feasible implementation timeframe.
Amendment 4493
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex – part II – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 1 year after entry into force of this Regulation], PV inverter and the PV cells or equivalent and two additional specific components shall originate in the Union. |
Or. en
Amendment 4494
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part II – paragraph 1 - point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From the date entry into force of this Regulation the PV inverter, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Amendment 4495
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part II– paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From the date entry into force of this Regulation the PV inverter, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Amendment 4496
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For auctions published after [OP: Please insert the date = 5 years after entry into force of this Regulation], PV inverter and the PV cells or equivalent shall originate in the Union. |
Or. en
Amendment 4497
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point ba (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph I point ba is added: |
|---|---|
| (ba) Solar thermal and electric technologies; | |
| From [OP: please insert the date = three years after the entry into force of this Regulation], at least two of the following main specific components shall originate in the Union: solar thermal/electirc collectors, solar thermal absorbers, solar glass, or solar thermal/electric trackers and their specific mounting structures. |
Or. en
Amendment 4498
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (c) - first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 1 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as one additional main specific component shall originate in the Union. | deleted |
Or. en
Amendment 4499
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part II – paragraph 1 – point (c) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 1 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as one additional main specific component shall originate in the Union. | For auctions published after [OP: Please insert the date = 1 year after entry into force of this Regulation], the stacks as well as one additional main specific component shall originate in the Union. |
Or. en
Amendment 4500
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (c) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 1 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as one additional main specific component shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as at least one additional main specific component shall originate in the Union. |
Or. en
Amendment 4501
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli, Anna Bryłka, Klara Dostalova, Jana Nagyová, Ondřej Knotek, Jaroslav Bžoch, Tomáš Kubín
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II– part II – paragraph 1 – point (c) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 1 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as one additional main specific component shall originate in the Union. | For auctions published after [OP: Please insert the date = 5 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as one additional main specific component shall originate in the Union. |
Or. en
Justification
The hydrogen electrolyser supply chain remains at an early stage of industrial development. European manufacturing capacity for electrolysers and their main specific components is currently insufficient to meet projected demand, and sourcing delays of up to two years are already being observed in project development. European manufacturers will need sufficient time to scale up production capacity, adapt and expand their supply chains, and make the necessary investments to meet the additional demand generated by these requirements. This industrial ramp-up cannot take place immediately and requires a sufficiently long lead-in period. Applying 'Made in EU' requirements within one and three years of entry into force risks generating artificial cost increases, supply bottlenecks and project delays, ultimately undermining the very industrial development the provision seeks to promote, especially due to the exclusion today of key manufacturing countries, necessary in an infant phase to ramp up the market. Extending both phase-in periods would allow European manufacturing capacity to consolidate before binding origin requirements apply, ensuring a proportionate and effective implementation.
Amendment 4502
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (c) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 1 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as one additional main specific component shall originate in the Union. | For auctions published after [OP: Please insert the date = 1 year after the entry into force of this Regulation], at least three out of four main specific components, including the stacks, of the exectrolysers used to produce hydrogen shall originate in the Union. |
Or. en
Amendment 4503
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (c) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as two additional main specific components shall originate in the Union. | deleted |
Or. en
Amendment 4504
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part II – paragraph 1 – point (c) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as two additional main specific components shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the stacks as well as two additional main specific components shall originate in the Union |
Or. en
Amendment 4505
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (c) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as two additional main specific components shall originate in the Union. | For auctions published after [OP: Please insert the date = 5 years after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as at least two additional main specific components shall originate in the Union. |
Or. en
Amendment 4506
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli, Anna Bryłka, Klara Dostalova, Jana Nagyová, Ondřej Knotek, Jaroslav Bžoch, Tomáš Kubín
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (c) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as two additional main specific components shall originate in the Union. | For auctions published after [OP: Please insert the date = 7 years after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as two additional main specific components shall originate in the Union. |
Or. en
Justification
The hydrogen electrolyser supply chain remains at an early stage of industrial development. European manufacturing capacity for electrolysers and their main specific components is currently insufficient to meet projected demand, and sourcing delays of up to two years are already being observed in project development. European manufacturers will need sufficient time to scale up production capacity, adapt and expand their supply chains, and make the necessary investments to meet the additional demand generated by these requirements. This industrial ramp-up cannot take place immediately and requires a sufficiently long lead-in period. Applying 'Made in EU' requirements within one and three years of entry into force risks generating artificial cost increases, supply bottlenecks and project delays, ultimately undermining the very industrial development the provision seeks to promote, especially due to the exclusion today of key manufacturing countries, necessary in an infant phase to ramp up the market. Extending both phase-in periods would allow European manufacturing capacity to consolidate before binding origin requirements apply, ensuring a proportionate and effective implementation.
Amendment 4507
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (a)- second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as two additional main specific components shall originate in the Union. | For auctions published after [OP: Please insert the date = 1 year after the entry into force of this Regulation], the electrolysers used to produce the hydrogen shall originate in the Union, and the stacks as well as two additional main specific components shall originate in the Union. |
Or. en
Amendment 4508
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II –paragraph 1- point (d)
| Text proposed by the Commission | Amendment |
|---|---|
| (d) Onshore and offshore wind technologies: | (d) Onshore wind technologies: |
Or. en
Amendment 4509
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d)
| Text proposed by the Commission | Amendment |
|---|---|
| (d) Onshore and offshore wind technologies: | (d) Onshore wind technologies: |
Or. en
Justification
The amendment on the letter (d) is proposed aiming to shorten the timeline of main components that must originate in the Union. It accelerates the transition from one to two EU-origin components, strengthening European industrial capacity more quickly, the supply chain is already mature, with key NZIA-listed components already capable of meeting these requirements for IAA. As regards wind technologies, the amendment proposes to differentiate the phase timing for onshore and offshore wind technologies. A diluted approach is necessary regarding offshore wind, which projects are characterized by specific technical, industrial and project-development constraints, including larger components, more complex installation and maintenance requirements, longer lead times and more specialized supply chains. Hence requirements shall be designed for offshore technologies to a segment with materially different industrial and deployment conditions.
Amendment 4510
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | deleted |
Or. en
Amendment 4511
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least three of the following main specific components shall originate in the Union: nacelle assemblies, rotor hubs, main, yaw and pitch bearings, direct-drive drivetrains including generators or gearbox drivetrains including generators, permanent magnets, gearboxes, blades, towers and foundations or floaters. |
Or. en
Amendment 4512
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from the date entry into force of this Regulation one main specific component shall originate in the Union. |
Or. en
Amendment 4513
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least the nacelles (assembly), blades, towers, and three additional main specific components of the wind turbine shall originate in the Union. |
Or. en
Amendment 4514
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Javier Moreno Sánchez, José Cepeda, Hana Jalloul Muro, Lina Gálvez, Elena Sancho Murillo, Laura Ballarín Cereza, Nicolás González Casares, Idoia Mendia, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], the nacelles (assembly), blades, towers, and at least three additional main specific component of the wind turbine shall originate in the Union. |
Or. en
Amendment 4515
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least the nacelles (assembly), blades, towers and three additional main specific components shall originate in the Union. |
Or. en
Amendment 4516
Raúl de la Hoz Quintano, Adrián Vázquez Lázara, Esteban González Pons, Pilar del Castillo Vera, Dolors Montserrat, Javier Zarzalejos, Susana Solís Pérez, Borja Giménez Larraz, Carmen Crespo Díaz, Antonio López-Istúriz White, Esther Herranz García, Nicolás Pascual de la Parte, Juan Ignacio Zoido Álvarez, Francisco José Millán Mon, Maravillas Abadía Jover, Isabel Benjumea Benjumea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (eu) 2024/1735
Annex II – part II – paragraph 1 – point (d) – first
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least the nacelles (assembly), blades, towers and three additional main specific components shall originate in the Union. |
Or. en
Amendment 4517
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola, Jessika van Leeuwen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], From the date entry into force of this Regulation one main specific component shall originate in the Union. |
Or. en
Justification
See the justification of the previous amendment.
Amendment 4518
Katri Kulmuni
Proposal for a regulation
Article 34 – paragraph 1 – point 8
(EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least 60% of the value of each main specific component of the wind turbine shall originate in the Union. |
Or. en
Amendment 4519
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part II – paragraph 1 – point (d) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component of the wind turbine shall originate in the Union. | For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], at least three main specific components of the wind turbine shall originate in the Union. |
Or. en
Amendment 4520
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], at least four of those main specific components shall originate in the Union, including the nacelle assembly and at least one of the following: the drivetrain including the generator, blades or foundations or floaters. |
Or. en
Amendment 4521
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Javier Moreno Sánchez, José Cepeda, Hana Jalloul Muro, Lina Gálvez, Elena Sancho Murillo, Laura Ballarín Cereza, Nicolás González Casares, Idoia Mendia, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the nacelles (assembly), blades, towers, and at least four additional main specific components of the wind turbine shall originate in the Union. |
Or. en
Amendment 4522
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point d – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], the nacelles (assembly), blades, towers, and four additional main specific components of the wind turbine shall originate in the Union. |
Or. en
Amendment 4523
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], at least the nacelles (assembly), blades, towers and four additional main specific components shall originate in the Union. |
Or. en
Amendment 4524
Raúl de la Hoz Quintano, Esteban González Pons, Pilar del Castillo Vera, Dolors Montserrat, Susana Solís Pérez, Javier Zarzalejos, Borja Giménez Larraz, Carmen Crespo Díaz, Antonio López-Istúriz White, Esther Herranz García, Nicolás Pascual de la Parte, Adrián Vázquez Lázara, Juan Ignacio Zoido Álvarez, Francisco José Millán Mon, Maravillas Abadía Jover, Isabel Benjumea Benjumea
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], at least the nacelles (assembly), blades, towers and four additional main specific components shall originate in the Union. |
Or. en
Amendment 4525
Pascal Canfin
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components, including at least permanent magnets, of the wind turbine shall originate in the Union. |
Or. en
Amendment 4526
Christophe Grudler
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], at least four main specific components of the wind turbine, including permanent magnets shall originate in the Union. |
Or. en
Amendment 4527
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], at least four main specific components of the wind turbine shall originate in the Union. |
Or. en
Amendment 4528
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published after [OP: Please insert the date = 1 year after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. |
Or. en
Amendment 4529
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola, Jessika van Leeuwen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (d) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. | For auctions published from [ 1 years after entry into force of this Regulation], two main specific components of the wind turbine shall originate in the Union. |
Or. en
Justification
See the justification of the previous amendment.
Amendment 4530
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point (da) is added: |
|---|---|
| Wind and electric propulsion technologies for transport; | |
| For auctions published from From [OP: Please insert: 3 years after the entry into force of this Regulation] the wind and electric propulsion technologies and their main specific components shall originate in the Union. |
Or. en
Amendment 4531
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (db) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point (db) is added: |
|---|---|
| Electricity grid technologies: | |
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation], cables and lines for electricity transmission and distribution, cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), transformers, switchgear, high-voltage direct current transmission equipment, onshore and offshore substations, grid digitalisation and protection systems shall originate in the Union. |
Or. en
Amendment 4532
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Offshore wind technologies: From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. |
Or. en
Justification
See the justification of the previous amendment.
Amendment 4533
Thomas Pellerin-Carlin, Pierre Jouvet, Christophe Clergeau, Jean-Marc Germain
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – Part II - paragraph 1 – point da (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Electricity grid technologies and critical grid components: For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation], the following main specific components, to the extent that they are included in the project subject to the auction, shall originate in the Union: (i) supervisory control and data acquisition (SCADA) systems and control systems; (ii) digital protection and automation systems; (iii) smart meters or metering systems; (iv) storage-related control systems; (v) operational technology (OT) and information technology (IT) communication systems and OT cybersecurity systems, including gateways, industrial routers and switches, radios and modems, and remote access components; (vi) sensors and monitoring systems; (vii) offshore substations, including offshore converter platforms (assembly). For auctions published from [OP: Please insert the date = 3 years after entry into force of this Regulation], in addition to the components referred to in the first subparagraph, at least four of the following main specific components with a rated voltage above 1 kV, or all of them where fewer than four are included in the project subject to the auction, shall originate in the Union: (i) switchgear, circuit breakers and protection relays; (ii) power transformers; (iii) inverters and converters, including high-voltage direct current (HVDC) converters; (iv) cables and lines for electricity transmission and distribution, and cables connecting net-zero technologies to the electricity grid, including overhead lines and underground and submarine cables, both HVDC and HVAC, and conductors; (v) capacitors and reactive power compensation equipment; (vi) onshore substations (assembly). |
Or. en
Justification
Where the project developer is responsible for building the grid connection, in particular offshore substations and export cables, the same Union origin requirements should apply in auctions as in public procurement, to ensure a level playing field regardless of how the grid connection is organised in each Member State.
Amendment 4534
Sigrid Friis, Barry Andrews, Christophe Grudler, Brigitte van den Berg
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Electricity grid technologies: | |
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], cables and lines for electricity transmission and distribution, cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), smart meters or metering systems, inverters, converters, transformers, onshore and offshore substations, grid digitalisation and protection systems, shall originate in the Union. | |
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], cables and lines for electricity transmission and distribution, cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), smart meters or metering systems, inverters, converters, transformers, onshore and offshore substations, grid digitalisation and protection systems, shall originate in the Union. |
Or. en
Amendment 4535
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli, Anna Bryłka, Klara Dostalova, Jana Nagyová, Ondřej Knotek, Jaroslav Bžoch, Tomáš Kubín
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Biogas, biomethane and renewable fuels technologies: | |
| For auctions published from [OP: Please insert the date = 1 year after 69 entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], biogas upgrading systems used for the production of biomethane, systems used for the liquefaction of biomethane and systems used for the production of renewable fuels shall originate in the Union and at least one main specific component of the upgrading system shall originate in the Union. | |
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], biogas upgrading systems used for the production of biomethane, systems used for the liquefaction of biomethane and systems used for the production of renewable fuels shall originate in the Union and at least two additional main specific components, including compressors, pumps, valves, gas separation or purification systems, heat exchangers or control systems, shall originate in the Union. |
Or. en
Amendment 4536
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (da) (new) – 1(e)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Biogas and biomethane technologies: | |
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], biogas upgrading systems used for the production of biomethane or renewable gases shall originate in the Union and at least one main specific component of the upgrading system shall originate in the Union. | |
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], biogas upgrading systems used for the production of biomethane or renewable gases shall originate in the Union and at least two additional main specific components, including compressors, pumps, valves, gas separation or purification systems, heat exchangers or control systems, shall originate in the Union. |
Or. en
Justification
Biogas and biomethane technologies form part of strategic European clean-tech value chains and should benefit from the same industrial demand signal provided to other net-zero technologies. Union origin requirements can support European manufacturing capacity in upgrading systems and their key components.
Amendment 4537
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Heat pumps and geothermal energy technologies: | |
| For auctions published From [OP: Please insert: 3 years after the entry into force of this Regulation] heat pumps and heat-pump rotary compressors shall originate in the Union. | |
| From 1 January 2035, four-way valves shall also originate in the Union where they form part of the relevant heat pump. | |
| From [OP: please insert the date = three years after the entry into force of this Regulation], for geothermal power plants and geothermal direct-use systems, at least one of the following main specific components shall originate in the Union: heat exchangers resistant to geothermal corrosive operating conditions;submersible pumps resistant to geothermal corrosive operating conditions. |
Or. en
Amendment 4538
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II– paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Offshore wind technologies: | |
| From [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], one main specific component shall originate in the Union. | |
| From [OP: Please insert the date = 3 years after the entry into force of this Regulation], two main specific components shall originate in the Union. |
Or. en
Amendment 4539
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation EU 2024/1735
Annex II – part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) electricity grid technologies: | |
| For auctions published from [OP: Please insert the date = 1 year after the entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], high-voltage (above 1 kV) switchgear compliant with Regulation (EU) 2024/573 shall originate in the Union. |
Or. en
Justification
The EU industry has made and continues to make a major effort to develop high-voltage switchgear (above 1 kV) and the associated manufacturing processes and plants that comply with Regulation (EU) 2024/573 on fluorinated gases, so that current SF6 emissions, which contribute a modest 0.1% annually to the EU's CO2 equivalent emissions, are virtually zero in all new high-voltage electrical switchgear by 2032. This effort must be supported by the EU Member States.
Amendment 4540
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II –part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) Electricity grid technologies: | |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], onshore and offshore substations and high-voltage switgear (above 1 kV) compliant with Regulation (EU) 2024/573, shall originate within the Union. |
Or. en
Amendment 4541
Raúl de la Hoz Quintano, Gabriel Mato, Adrián Vázquez Lázara, Esteban González Pons, Pilar del Castillo Vera, Dolors Montserrat, Javier Zarzalejos, Susana Solís Pérez, Borja Giménez Larraz, Carmen Crespo Díaz, Antonio López-Istúriz White, Esther Herranz García, Nicolás Pascual de la Parte, Juan Ignacio Zoido Álvarez, Francisco José Millán Mon, Maravillas Abadía Jover, Isabel Benjumea Benjumea
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (da) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point da is added: |
|---|---|
| (da) electricity grid technologies For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation], high voltage (above 1 kV) switchgear compliant with Regulation EU 2024/573 shall originate in the Union. |
Or. en
Amendment 4542
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II –paragraph 1- point (db) new
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point db is added: |
|---|---|
| (db) Biogas, biomethane and renewable fuels technologies: | |
| For auctions published from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], biogas upgrading systems used for the production of biomethane, systems used for the liquefaction of biomethane and systems used for the production of renewable fuels shall originate in the Union and at least one main specific component of the upgrading system shall originate in the Union. | |
| For auctions published after [OP: Please insert the date = 3 years after entry into force of this Regulation], biogas upgrading systems used for the production of biomethane, systems used for the liquefaction of biomethane and systems used for the production of renewable fuels shall originate in the Union and at least two additional main specific components, including compressors, pumps, valves, gas separation or purification systems, heat exchangers or control systems, shall originate in the Union. |
Or. en
Amendment 4543
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (db) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point db is added: |
|---|---|
| (db) Transformative industrial technologies for decarbonisation; For auctions published from From [OP: Please insert the date = 3 years after entry into force of this Regulation], the technologies and their main specific components shall originate in the Union. |
Or. en
Amendment 4544
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (dc) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point dc is added: |
|---|---|
| (dc) Carbon capture and storage technologies: | |
| For auctions published from From [OP: Please insert the date = 3 years after entry into force of this Regulation], at least two main specific components of the carbon capture equipment concerned shall originate in the Union. The main specific components referred to in the first subparagraph shall be those identified for the relevant carbon capture technology in the applicable Union list of net-zero technology final products and their main specific components. |
Or. en
Amendment 4545
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (dd) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point dd is added: |
|---|---|
| (dd) Energy system-related energy efficiency technologie; | |
| For auctions published from From [OP: Please insert the date = 3 years after entry into force of this Regulation],at least three main specific component of the relevant energy system-related energy efficiency technology shall originate in the Union. |
Or. en
Amendment 4546
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU) 2024/1735
Annex II – part II – paragraph 1 – point (de) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point de is added: |
|---|---|
| (de) Hydrogen: | |
| For auctions published from From [1 year after entry into force], where contracts include the procurement of electrolysers, or of hydrogen produced with electrolysers, at least three out of four main specific components, including the stacks, of the electrolysers shall originate in the Union. |
Or. en
Amendment 4547
Niels Flemming Hansen
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
reg/2024/1735
Annex II – part II – paragraph 1 – point (de) (new)
| Text proposed by the Commission | Amendment (8a) In Annex II part II paragraph 1 point de is added: |
|---|---|
| (de) Electricity grid technologies: From [3 years after entry into force of this Regulation], cables and lines for electricity transmission [and distribution], and cables connecting net-zero technologies to the electricity grid (overhead lines, underground and undersea cables, including HVDC and HVAC), inverters, converters, and electric cabinets [protection relays] shall originate within the Union. |
Or. en
Amendment 4548
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part III – introductory part
| Text proposed by the Commission | Amendment |
|---|---|
| In accordance with Article 28b, when deciding to set up new schemes or to update existing schemes benefitting households or companies that support the demand for net-zero technology final products listed in this paragraph, Member States, regional or local authorities, bodies governed by public law or associations formed by one or more such authorities or one or more such bodies governed by public law, shall design the schemes in such a way as to ensure that beneficiaries shall be eligible to the scheme or to additional financial compensation only where the requirements laid down below are fulfilled: | In accordance with Article 28a, from 1 January 2029, for schemes benefitting households or companies that support the demand for net-zero technology final products listed in this paragraph, Member States, regional or local authorities, bodies governed by public law or associations formed by one or more such authorities or one or more such bodies governed by public law, shall design the schemes in such a way as to ensure that beneficiaries shall be eligible to the scheme or to additional financial compensation only where the requirements laid down below are fulfilled: |
Or. en
Amendment 4549
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated from [OP: Please insert the date = 1 year after entry into force of this Regulation] until [OP: Please insert the date = 3 years after entry into force of this Regulation], battery energy storage systems shall be assembled in the Union and contain the BESS power conversion system (PCS) that originates in the Union. |
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], battery energy storage systems shall be assembled in the Union and contain the BESS power conversion system (PCS), the system- or container-level Battery Management System (BMS), the EMS/SCADA system and battery cells that originate in the Union. | |
| For the purposes of the second subparagraph, the Union origin requirement applicable to the Battery Management System (BMS) shall apply only to the system- or container-level BMS (level 3). Cell- or module-level BMS (level 1) and rack-level BMS (level 2) shall not be subject to that requirement. | |
| No later than [OP: Please insert the date = 6 months before the date referred to in the second subparagraph], the Commission shall assess the Union manufacturing capacity for battery cells, system- or container-level Battery Management Systems (BMS) and EMS/SCADA systems. The requirements laid down in the second subparagraph shall apply from the date specified therein unless the Commission demonstrates, on the basis of objective and verifiable evidence, that Union manufacturing capacity is manifestly insufficient to meet expected demand and that their application would create a serious risk of disruption to the deployment of battery energy storage systems. |
Or. en
Amendment 4550
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | Between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
| Between [OP: Please insert the date = 3 years after entry into force of this Regulation] and [5 years after entry into force of this Regulation] the battery energy storage system shall originate in the Union and contain battery cells, the binders, a battery management system, as well as one additional main specific components that originate in the Union. | |
| From [OP: Please insert the date = 5 years after entry into force of this Regulation] the battery energy storage systems shall originate in the Union and contain battery cells, the binders, cathode active materials, a battery management system, as well as one additional main specific component that originate in the Union. At least 20% of lithium used shall be extracted, processed or recycled within the Union. |
Or. en
Amendment 4551
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union, and 35 % of the strategic raw material used in the battery energy storage systems are recycled. . |
Or. en
Amendment 4552
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part III – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originate in the Union: power plant control, inverter and battery cells. |
Or. en
Amendment 4553
Pierre Jouvet, Raphaël Glucksmann, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system, power-conversion system and energy-management system that originate in the Union. |
Or. fr
Amendment 4554
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] until [ 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originates in the Union: power plant control, inverter and battery cells |
Or. en
Justification
Battery energy storage systems should be considered as integrated systems. Union origin requirements should therefore cover components that are essential for storage performance, system control and grid integration, strengthening European manufacturing capacity across the BESS value chain from the first phase of implementation.
Amendment 4555
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II –part III – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system and two out of the following components that originate in the Union: power plant control, inverter and battery cells |
Or. en
Amendment 4556
Bart Groothuis, Nikola Minchev, Christophe Grudler, Jeannette Baljeu, Morten Løkkegaard, Sandro Gozi, Sophie Wilmès, Benoit Cassart, Dan Barna, Brigitte van den Berg, Sigrid Friis, Ivars Ijabs
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems and a power conversion system shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Justification
The power conversion system links a battery to the grid and can be controlled remotely. Like the battery management system, it should be listed as a component, to reduce dependency and cybersecurity risks.
Amendment 4557
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II - part III – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 2 year after entry into force of this Regulation] and [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Amendment 4558
Daniel Obajtek, Marion Maréchal, Anna Zalewska, Jadwiga Wiśniewska, Jacek Ozdoba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – paragraph 1 – point a – first subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated between [OP: Please insert the date = 1 year after entry into force of this Regulation] and [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. | For schemes set up or updated between [OP: Please insert the date = 3 year after entry into force of this Regulation] and [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and, for projects including battery energy storage exceeding 1 Megawatt-hour, contain a battery management system that originates in the Union. |
Or. en
Justification
The postponement allows sufficient time for Union manufacturing capacity for battery energy storage systems and battery management systems to scale up. Applying the Union-origin requirements too early could create supply bottlenecks, increase project costs and delay the deployment of energy-storage projects essential for the clean-energy transition.
Amendment 4559
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Delara Burkhardt, Bruno Tobback, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – paragraph 1 – point a – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, cathode active material, a battery management system as well as one additional main specific components that originate in the Union and recycled content originating in the Union, in accordance with the requirements on minimum levels of recycled content laid down in Regulation (EU) 2023/1542 (EU Battery Regulation), and verified pursuant to that Regulation’s rules on the calculation, declaration and traceability of recycled content. At least 20% of the relevant strategic raw materials used shall be mined, processed or recycled within the European Union. By 2036, this threshold shall rise to as least 40%. |
Or. en
Amendment 4560
Pierre Jouvet, Raphaël Glucksmann, Jean-Marc Germain, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific component that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, cathode active material, a battery management system, power-conversion system and energy-management system, as well as one additional main specific component that originate in the Union. At least 20 % of the relevant strategic raw materials used in the batteries must have been extracted, processed or recycled in the Union or in an overseas country or territory listed in Annex II to the TFEU. By 2036, this threshold shall rise to at least 40 %. |
Or. fr
Justification
Consistency with Parts I and II. The overseas countries and territories (OCTs) associated with the Union may contribute to the resilience and security of its supply chains for strategic raw materials. The strategic raw materials that are extracted, processed or recycled from them must therefore be included under the equivalent requirements.
Amendment 4561
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union, and 35 % of the strategic raw material used in the battery energy storage systems are recycled. . |
Or. en
Amendment 4562
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control and an inverter as well as one additional main specific component that originate in the Union. |
Or. en
Amendment 4563
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter as well as one additional main specific component that originate in the Union. |
Or. en
Amendment 4564
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 2 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power plant control, an inverter as well as one additional main specific component that originate in the Union. |
Or. en
Justification
Stronger Union origin requirements should apply as European manufacturing capacity develops. Covering the principal technological components of battery energy storage systems provides a clear demand signal for investment and reduces dependencies across the integrated BESS value chain.
Amendment 4565
Bart Groothuis, Nikola Minchev, Christophe Grudler, Jeannette Baljeu, Morten Løkkegaard, Sandro Gozi, Sophie Wilmès, Benoit Cassart, Dan Barna, Brigitte van den Berg, Sigrid Friis, Ivars Ijabs
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system, a power conversion system as well as one additional main specific components that originate in the Union. |
Or. en
Justification
The power conversion system links a battery to the grid and can be controlled remotely. Like the battery management system, it should be listed as a component, to reduce dependency and cybersecurity risks.
Amendment 4566
Andrea Wechsler, Christian Ehler, Angelika Niebler, Jens Gieseke, Andreas Schwab, Norbert Herhammer, Hildegard Bentele, Markus Ferber, Oliver Schenk, Christian Doleschal, Monika Hohlmeier, Verena Mertens, Ralf Seekatz, Marie-Sophie Christ, Alexandra Mehnert, Norbert Lins, Marion Walsmann
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | ,For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, cathode active materials, a battery management system as well as one additional main specific components that originate in the Union. |
Or. en
Justification
Cathode active materials are a key value-creating step in battery production and are strategically important for European battery resilience.
Amendment 4567
Kamila Gasiuk-Pihowicz, Krzysztof Hetman, Borys Budka, Bogdan Andrzej Zdrojewski, Dariusz Joński, Adam Jarubas, Mirosława Nykiel, Andrzej Buła
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as at least one additional main specific components that originate in the Union. |
Or. en
Amendment 4568
Daniel Obajtek, Marion Maréchal, Anna Zalewska, Jadwiga Wiśniewska, Jacek Ozdoba
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (a) – second subparagraph
| Text proposed by the Commission | Amendment |
|---|---|
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. | For schemes set up or updated from [OP: Please insert the date = 5 years after entry into force of this Regulation], the battery energy storage systems shall originate in the Union and contain battery cells, a battery management system as well as one additional main specific components that originate in the Union. |
Or. en
Justification
The postponement allows sufficient time for Union manufacturing capacity for battery energy storage systems and battery management systems to scale up. Applying the Union-origin requirements too early could create supply bottlenecks, increase project costs and delay the deployment of energy-storage projects essential for the clean-energy transition.
Amendment 4569
Piotr Müller
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part III – paragraph 1–point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter shall originate in the Union and the PV modules shall be assembled in the Union. For schemes set up or updated from [OP: Please insert the date = 5 years after entry into force of this Regulation], the PV cells or equivalent shall also originate in the Union, provided that the Commission has established, by means of an implementing act adopted in accordance with the examination procedure referred to in Article 45(3) by [OP: Please insert the date = 4 years after entry into force of this Regulation], that Union manufacturing capacity for PV cells is sufficient to meet the expected demand without price increases which are disproportionate in comparison with world market prices, taking into account the security of supply. |
Or. en
Justification
Rooftop solar support schemes are used by millions of households to cut their bills. Requiring Union-made cells before sufficient capacity exists would make panels much more expensive. Cells should follow only once the Member States have confirmed through an implementing act that capacity and prices allow it, while Union inverters protect grid security.
Amendment 4570
Maria Grapini
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – Part III – paragraph 1–point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: |
| For schemes set up or updated from [OP: Please insert date: one year after entry into force of this Regulation] and [OP: Please insert the date = three years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV tracking systems and associated specific mountings, and one additional main specific component shall originate in the Union. | |
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent, the PV tracking systems and associated specific mountings, and one additional main specific component shall originate in the Union. |
Or. ro
Amendment 4571
Pierre Jouvet, Raphaël Glucksmann, François Kalfon, Christophe Clergeau
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = one year after entry into force of this Regulation], the PV inverter, the polysilicon and one additional main specific component, namely the solar trackers and their specific mounting structures where the project includes them, shall originate in the Union. For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent and one additional main specific component, namely the solar trackers and their specific mounting structures where the project includes them, shall originate in the Union. |
Or. fr
Justification
Solar trackers and their mounting structures were already main specific components within the meaning of Regulation (EU) 2024/1735, but they avoided scrutiny owing to the lack of dedicated customs codes, so European capacity, which largely consists of SMEs in galvanisation and metal structures, is being eroded. Mentioning them by name will make the requirement applicable.
Amendment 4572
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV cells or equivalent, PV inverters and at least one of the following additional main specific components shall originate in the Union: PV-grade polysilicon, PV-grade silicon ingots or equivalent, PV wafers or equivalent, solar glass, PV modules, or PV trackers and their specific mounting structures. |
| For schemes set up or updated from 1 January 2035, PV cells or equivalent, PV inverters and at least three of the additional main specific components referred to in the first subparagraph shall originate in the Union. |
Or. en
Amendment 4573
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU)2024/1735
Annex II – part III – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: |
| For schemes set up or updated between [1 year after entry into force of this Regulation] and [3 years after entry into force of this Regulation], the PV inverter, and one additional main specific component shall originate in the Union. | |
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, and the PV cells or equivalent, and one additional main specific component shall originate in the Union. |
Or. en
Amendment 4574
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part III – paragraph 1 – point (b)
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 1 years after entry into force of this Regulation], the PV inverter, the polysilicon and one additional main specific component shall originate in the Union. |
| For schemes set up or updated from [OP: Please insert the date = 3 year after entry into force of this Regulation], the PV inverter, the polysilicon and the PV cells or equivalent and one additional main specific component shall originate in the Union. |
Or. en
Amendment 4575
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza, Jonás Fernández
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 1 year after entry into force of this Regulation], the PV inverter, the polysilicon and one additional main specific component shall originate in the Union. |
| From [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter, the polysilicon, the PV cells or equivalent as well as three additional main specific components shall originate in the Union. |
Or. en
Amendment 4576
Oihane Agirregoitia Martínez
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation EU 2024/1735
Annex II –part III –paragraph 1 –point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 1 year after entry into force of this Regulation], the PV inverter and the PV cells or equivalent and two additional specific components shall originate in the Union. |
Or. en
Amendment 4577
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: From the date entry into force of this Regulation the PV inverter, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Amendment 4578
Mariateresa Vivaldini, Giovanni Crosetto, Daniele Polato, Carlo Fidanza, Elena Donazzan, Nicola Procaccini, Sergio Berlato, Stefano Cavedagna, Carlo Ciccioli, Alessandro Ciriani, Pietro Fiocchi, Alberico Gambino, Chiara Gemma, Paolo Inselvini, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Michele Picaro, Ruggero Razza, Antonella Sberna, Marco Squarta, Francesco Torselli, Francesco Ventola, Jessika van Leeuwen
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 1 year after entry into force of this Regulation], the PV invertir, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Justification
The amendment on letter (b) aims to calibrate the timing of Union origin requirements more closely to the technical relevance and strategic criticality of the components concerned in the solar PV and wind value chains. Reducing the transition period for PV inverters and modules from three years to one year ensures that the Regulation produces an earlier industrial effect and provides a clear demand signal for European manufacturers. At the same time, PV cells remain one of the most critical manufacturing steps in the solar value chain, with a promising new supply chain. It is important to underline that cell manufacturing requires more capital-intensive production investment, hence the amendment proposed aims to reduce the transition period for PV cells, strengthening the demand signal for European cell production while maintaining a technically feasible implementation timeframe.
Amendment 4579
Paolo Borchia, Isabella Tovaglieri, Raffaele Stancanelli
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II - part III – paragraph 1 – point b
| Text proposed by the Commission | Amendment |
|---|---|
| (b) Solar PV technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the PV inverter and the PV cells or equivalent shall originate in the Union. | (b) Solar PV technologies: For schemes set up or updated from the date of the entry into force of this Regulation, the PV inverter, PV module and the PV cells or equivalent shall originate in the Union. |
Or. en
Amendment 4580
David Cormand, Anna Cavazzini, Sara Matthieu
on behalf of the Verts/ALE Group
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation (EU)2024/1735
Annex II – part III – paragraph 1 – point (ba) new
| Text proposed by the Commission | Amendment (8a) In Annex II part III paragraph 1 point ba is added: |
|---|---|
| (ba) Solar thermal technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the solar thermal collector shall originate in the Union. |
Or. en
Amendment 4581
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – Part III – paragraph 1 – point (ba) new
| Text proposed by the Commission | Amendment 8a) In Annex II part III paragraph 1 point ba is added: |
|---|---|
| (ba) Solar thermal technologies: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the solar thermal collector shall originate in the Union |
Or. en
Amendment 4582
Marina Mesure, Rudi Kennes
Proposal for a regulation
Article 34 – paragraph 1 – point 8 a (new)
Regulation 2024/1735
Annex II – Part III– paragraph 1 – point (ba)
| Text proposed by the Commission | Amendment (8a) In Annex II part III paragraph 1 point ba is added: |
|---|---|
| (ba) Solar thermal technologies: From [OP: Please insert the date = 2 years after entry into force of this Regulation], the solar thermal collector shall originate in the Union. |
Or. en
Amendment 4583
Tomislav Sokol
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (c)
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the hydronic heat pump shall originate in the Union. | (c) Heat pumps and geothermal energy technologies; |
| For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], heat pumps shall be manufactured in the Union and scroll compressors or heat-pump rotary compressors shall originate in the Union. | |
| For schemes set up or updated from 1 January 2035, four-way valves shall also originate in the Union where they form part of the relevant heat pump. For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation] concerning geothermal power plants or geothermal direct-use systems, at least one of the following main specific components shall originate in the Union: | |
| (i) heat exchangers resistant to geothermal corrosive operating conditions; | |
| (ii) submersible pumps resistant to geothermal corrosive operating conditions. |
Or. en
Amendment 4584
Letizia Moratti, Fulvio Martusciello, Massimiliano Salini, Salvatore De Meo
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II –part III – paragraph 1 – point (c)
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the hydronic heat pump shall originate in the Union. | (c) (c) Heat pump technologies: From [OP: Please insert: 3 years after the entry into force of this Regulation], heat pump technologies, including hydronic heat pumps, air-air heat pumps, industrial heat pumps and high-temperature heat pumps, shall originate in the Union. |
Or. en
Amendment 4585
Kathleen Van Brempt, Marc Angel, Jens Geier, Pierre Jouvet, Jean-Marc Germain, Raphaël Glucksmann, Ştefan Muşoiu, René Repasi, Matthias Ecke, Elisabeth Grossmann, Niels Fuglsang, Javier Moreno Sánchez, José Cepeda, Hana Jalloul Muro, Lina Gálvez, Elena Sancho Murillo, Laura Ballarín Cereza, Nicolás González Casares, Idoia Mendia, François Kalfon
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation 2024/1735
Annex II – part III – paragraph 1 – point (c)
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the hydronic heat pump shall originate in the Union. | (c) Heat pumps: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the hydronic heat pump shall originate in the Union. |
Or. en
Amendment 4586
Dario Tamburrano
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III – paragraph 1 – point (c)
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the hydronic heat pump shall originate in the Union. | (c) Heat pumps: For schemes set up or updated from [OP: Please insert the date = 1 years after entry into force of this Regulation], the heat pump shall originate in the Union. |
Or. en
Amendment 4587
Nicolás González Casares, Javier Moreno Sánchez, Leire Pajín, Idoia Mendia, José Cepeda, Elena Sancho Murillo, Sandra Gómez López, Lina Gálvez, Juan Fernando López Aguilar, Alicia Homs Ginel, Hana Jalloul Muro, Laura Ballarín Cereza
Proposal for a regulation
Article 34 – paragraph 1 – point 8
Regulation (EU) 2024/1735
Annex II – part III– paragraph 1 – point c
| Text proposed by the Commission | Amendment |
|---|---|
| (c) Hydronic heat pumps: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the hydronic heat pump shall originate in the Union. | (c) Heat pumps: For schemes set up or updated from [OP: Please insert the date = 3 years after entry into force of this Regulation], the heat pump shall originate in the Union. |
Or. en