Skip to content
EU Parl Watch

Plenary report, 11 September 2026

On the proposal for a regulation of the European Parliament and of the Council on guidelines for trans-European energy infrastructure, amending Regulations (EU) 2019/942, (EU) 2019/943 and (EU) 2024/1789 and repealing Regulation (EU) 2022/869

Report A-10-2026-0231 · (COM(2025)1006 – C100342/2025 – 2025/0399(COD))

Committee on Industry, Research and Energy · Rapporteur: Tsvetelina Penkova

On Parliament’s site PDF Word

Full text

Jump to an amendment (81)
Draft european parliament legislative resolution 1,094 paragraphs

(COM(2025)1006 – C100342/2025 – 2025/0399(COD))

(Ordinary legislative procedure: first reading)

The European Parliament,

–having regard to the Commission proposal to Parliament and the Council (COM(2025)1006),

–having regard to Article 294(2) and Article 172 of the Treaty on the Functioning of the European Union, pursuant to which the Commission submitted the proposal to Parliament (C100342/2025),

–having regard to Article 294(3) of the Treaty on the Functioning of the European Union,

–having regard to the reasoned opinions submitted, within the framework of Protocol No 2 on the application of the principles of subsidiarity and proportionality, by the Czech Senate, the Italian Chamber of Deputies and the Swedish Parliament, asserting that the draft legislative act does not comply with the principle of subsidiarity,

–having regard to the opinion of the European Economic and Social Committee of 18 March 2026,

–having regard to the opinion of the Committee of the Regions of 5 March 2026,

–having regard to Rule 60 of its Rules of Procedure,

–having regard to the opinion of the Committee on the Environment, Climate and Food Safety,

–having regard to the report of the Committee on Industry, Research and Energy (A10-0231/2026),

Read the rest (1,082 paragraphs)

1.Adopts its position at first reading hereinafter set out;

2.Calls on the Commission to refer the matter to Parliament again if it replaces, substantially amends or intends to substantially amend its proposal;

3.Instructs its President to forward its position to the Council, the Commission and the national parliaments.

Amendment 1

AMENDMENTS BY THE EUROPEAN PARLIAMENT*

to the Commission proposal

---------------------------------------------------------

Proposal for a

REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

on guidelines for trans-European energy infrastructure, amending Regulations (EU) 2019/942, (EU) 2019/943 and (EU) 2024/1789 and repealing Regulation (EU) 2022/869

(Text with EEA relevance)

THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 172 thereof,

Having regard to the proposal from the European Commission,

After transmission of the draft legislative act to the national parliaments,

Having regard to the opinion of the European Economic and Social Committee,

Having regard to the opinion of the Committee of the Regions,

Acting in accordance with the ordinary legislative procedure,

Whereas:

(1) The Commission Communication of 26 February 2025 on the “Clean Industrial Deal” sets out a joint roadmap for competitiveness and decarbonisation. Securing affordable energy is a key condition for the competitiveness of the Union industry, especially for energy-intensive sectors. Access to affordable energy is therefore a cornerstone of the Clean Industrial Deal as well as the Action Plan for Affordable Energy. At the same time, decarbonisation policies are a powerful driver of growth when they are well integrated with industrial, competition, economic and trade policies as set out in the Commission Communication of 29 January 2025 on a “Competitiveness Compass for the EU”. With Regulation (EU) 2021/1119 of the European Parliament and of the Council, the Union has set out an ambitious framework to become a decarbonised economy by 2050. The development of energy infrastructure should also contribute to ensuring energy system resilience and climate change adaptation, while enabling low energy system costs and avoiding a disproportionate impact on final electricity prices.

(2) As part of the ambition of Regulation (EU) 2021/1119, the binding Union level target for renewable energy for 2030 has been increased to 42.5 % renewable energy in the Union’s energy mix by 2030, aiming for 45 %, and the binding Union level target for energy efficiency has been made more ambitious, with a reduction of Union final energy consumption by 11.7 % by 2030, compared to 2020 projections. With the intermediate target of at least 55 % net greenhouse gas (GHG) emissions reduction compared with 1990 levels by 2030 well on track, on 2 July 2025 the Commission proposed an amendment to Regulation (EU) 2021/1119 setting a Union climate target for 2040 of a 90 % reduction in net GHG emissions, compared to 1990 levels, with a view to achieving the Union’s commitments under the Paris Agreement adopted under the United Nations Framework Convention on Climate Change.

(3) Infrastructure needs to be in place to support the Union energy transition in accordance with those targets, including rapid electrification, scaling up renewable and fossil fuel free electricity generation, the increased use of renewable and low-carbon gases, geothermal generation, energy integration and a higher uptake of innovative solutions. Current investments in cross-border energy infrastructure are clearly insufficient to transform and build the energy infrastructure needed to support those targets and there is a substantial gap between our cross-border electricity infrastructure needs and the speed and level of infrastructure development at both the transmission and distribution grid level. For electricity, about half of cross-border electricity needs for 2030 (41 of 88 GW) will remain unaddressed, and this gap is expected to increase the next decade. By 2040, cross-border electricity capacity needs will amount to 108 GW.. Increased investments in energy infrastructure are therefore necessary, and the Draghi report pointed in particular to the need to rapidly increase the deployment of cross-border energy infrastructure to decarbonise Europe’s industry. In the Clean Industrial Deal and the accompanying “Action Plan for Affordable Energy”, the Commission underlined the crucial role of completing the Energy Union by investing in energy infrastructure and cross-border grids for safeguarding the competitiveness of Union industry and the prosperity of people as well as for ensuring the affordability and resilience of the energy system and security of energy supply.

(3a) The Action Plan for Affordable Energy indicates that every person, community and business should benefit from the clean transition, and identifies investments in modernising and expanding the electricity network as essential to facilitate the deployment of renewables, electrification and new industrial and business demand. While the Union electrification rate was only 23,4 % in 2024, the Clean Industrial Deal and the Affordable Energy Action Plan introduced a key performance indicator on the share of electricity in final energy consumption, setting 32 % by 2030 as reference. The Commission communication of 22 April 2026 entitled “AccelerateEU - Energy Union” identifies accelerating electrification as an urgent measure to end the Union's exposure to fossil fuel price shocks and import dependencies, and announced the introduction of an indicative Union-wide electrification target of 46 % by 2040 in the Commission communication of 17 July 2026 entitled “Electrification Action Plan”.

(4) Regulation (EU) 2022/869 of the European Parliament and of the Council laid down guidelines for the timely development and interoperability of priority corridors and areas of trans-European energy infrastructure in order to contribute to ensuring climate change mitigation in particular achieving the Union’s 2030 targets for energy and climate change and the climate neutrality objective by 2050 at the latest and to ensuring interconnections, energy security, market and system integration and competition that benefits all Member States, as well as affordability of energy prices and energy system resilience. In particular, Regulation (EU) 2022/869 provides for the identification of projects of common interest and of projects of mutual interest, facilitates their implementation and determines the conditions for eligibility of those projects for Union financial assistance. However, given their cross-border nature, projects of common interest and projects of mutual interest not only create significant positive externalities and foster solidarity, but also entail specific challenges for project promoters, due to their multi-jurisdictional nature, coordination challenges and an often asymmetrical distribution of costs and benefits. They therefore continue to require a Union level framework.

(5) While the objectives of Regulation (EU) 2022/869 remain largely valid, the current trans-European energy networks framework should be adjusted to fully reflect the expected changes to the energy system that will result from the new policy context and in particular the 2050 climate neutrality objective and the proposed intermediary target for 2040. In particular, there is a need for more integrated grid planning to support an increasingly interdependent and decentralised internal energy market, faster permit granting processes and to ensure the security and resilience of cross-border energy infrastructure to be adequately reflected in the revised trans-European energy networks framework. Besides the new political context and objectives, technological development has been rapid in the past decade. That development should be taken into account in the energy infrastructure categories covered by this Regulation, the selection criteria for projects of common interest and projects of mutual interest as well as the priority corridors and areas. At the same time, the provisions of this Regulation should not affect a Member State’s right to determine the conditions for exploiting its energy resources, its choice between different energy sources and the general structure of its energy supply, in accordance with Article 194 of the Treaty.

(5a) Union-wide integration of energy infrastructure should be accompanied by effective and well-functioning energy markets. Grid and infrastructure expansion should support market integration, and the effects of projects on the relevant markets should therefore be taken into account when assessing their impacts. The effects on price stability and resource adequacy should also be considered.

(6) The implementation of the identified 13 trans-European energy infrastructure priority corridors and thematic areas is essential for the achievement of the Union’s energy and climate targets including further market integration, energy security, the 2050 climate neutrality objective as well as affordability of energy prices. Those priorities cover investments in electricity transmission and storage, offshore grids for renewable energy, smart electricity grids, equipment and installation designed to ensure protection and resilience of existing critical network elements, hydrogen transmission, storage and terminals, electrolysers, and the transport and storage of carbon dioxide as well as monitoring, control and digitalisation equipment and installation essential for existing high-voltage networks of cross-border relevance. In addition, those priorities should contribute to the resilience and climate adaptation of energy infrastructure and to the efficient functioning of the energy system.

(6a) Achieving the Union’s climate neutrality, security of supply and industrial competitiveness objectives requires the timely deployment and integration of net-zero technologies, in line with technological neutrality. Cross-border cooperation can facilitate their deployment where it addresses coordination needs or delivers system-wide benefits. Therefore, this Regulation should support cross-border energy and infrastructure projects contributing to the deployment of net-zero technologies in accordance with Union law and without prejudice to Member States’ right to determine their energy mix in accordance with the Treaties.

(7) The Union’s energy infrastructure should be upgraded in order to increase its resilience against natural or man-made disasters, adverse effects of climate change, deliberate hostile actions and threats to its security, in particular as regards European critical infrastructures pursuant to Directive 2022/2557 of the European Parliament and of the Council. Infrastructure projects should align with the principles outlined in the Commission Notice on Technical Guidance on the climate proofing of infrastructure in the period 2021-202716b. The integration from the earliest planning and design stages of ecosystem-based features into infrastructure projects can enhance efficiencies, support climate change mitigation and resilience, reduce pollution, increase biodiversity, and benefit human well-being and health, while ensuring that the infrastructure remains safe, functional and adaptable throughout its lifecycle. Where relevant, the planning and design processes should include an assessment of the potential for integrating such features. The Commission should provide guidance and a template to facilitate that assessment.

(8) In the current geopolitical context, it is important to ensure the uninterrupted flow of electricity across borders to ensure security of supply. The uninterrupted cross-border flow of energy depends not only on the resilience of interconnectors between Member States, but also on the protection and resilience of wider energy systems. The protection of critical energy infrastructure is vital to ensure the Union’s security of energy supply, both in response to and for preparedness against emerging threats of supply disruption. Those threats include physical attacks caused by military groups, terrorists or drones, as well as cyber threats from outside or within the system. Therefore, this Regulation should introduce a new infrastructure category in the form of investments into equipment and installations directly connected to and designed to enhance the critical network elements’ resilience and protection. That new infrastructure category should cover critical network elements, as set out in Regulation (EU) 2019/943 of the European Parliament and of the Council, that support network security and supply security in accordance with the Member States’ crisis scenarios and risk preparedness plans under Regulation (EU) 2019/941 of the European Parliament and of the Council .

(9) While foreign investment can bring benefits such as increased financing options for capital-intensive projects, it can also increase the Union’s exposure to energy security related risks such as disruptions or reduced reliability of cross-border flows, in particular where such foreign investments originate from third countries with diverging geopolitical interests from the Union. Transparency regarding ultimate beneficiary ownership, including information on the ultimate investor and participation in the capital as set out in Regulation (EU) 2019/452 of the European Parliament and of the Council, of cross-border energy infrastructure and projects with a cross-border impact is therefore crucial to prevent the Union from becoming dependent on non-trusted third countries and should be taken into consideration when selecting projects of common interest and projects of mutual interest.

(10) To ensure cost-efficient and accelerated grid development and access to grids in the Union, non-wire solutions should play a prominent role in addressing system needs next to physical grid reinforcement, as they may be deployed faster and at lower costs. Deploying such technologies should be considered before investing in the expansion of grid infrastructure. Their potential to address identified network needs should therefore be duly considered when assessing investment options. To this aim, a new infrastructure category should cover investments in grid-enhancing technologies and digital solutions, including software solutions, where they are deployed on existing critical network elements relevant for cross-border trade, and bring quantified benefits, including increased cross-border capacity and enhanced system resilience.

(10a) In order to ensure the secure, resilient and reliable functioning of the Union energy system, infrastructure should also contribute to the cyber and operational resilience of critical energy assets, including protection against cyber threats, physical disruptions and hybrid risks, in coherence with Union legislation, in particular Directives (EU) 2022/2555 and (EU) 2022/2557. To that end, investments supporting cybersecurity, detection and response systems, and physical protection against external interference should be taken into account.

(11) A decarbonised gas and hydrogen legislative package was adopted with Regulation (EU) 2024/1789 of the European Parliament and of the Council and Directive (EU) 2024/1788 of the European Parliament and of the Council to set common rules at Union level for the transition to renewable and low-carbon gases. The infrastructure categories set out in this Regulation should be fully aligned with the objectives of that package and ensure that energy infrastructure projects have a significant cross-border impact. Where technically possible and most efficient, the possibility of repurposing existing infrastructure and equipment should be taken into account in the development of such projects.

(12) Regional groups (Groups) should be established for the purpose of proposing and reviewing projects of common interest and projects of mutual interest, leading to the establishment of regional lists of projects of common interest and projects of mutual interest. In order to ensure broad consensus, those Groups should include and ensure close cooperation between Member States, national regulatory authorities, project promoters and relevant stakeholders. The composition, the activity and decisions of those Groups should be accessible to public and published on the PCI transparency Platform website. In the context of that cooperation, national regulatory authorities should, where necessary, advise Groups, inter alia, on the feasibility of the national regulatory aspects of proposed projects and on the feasibility of the proposed timetable for regulatory approval.

(13) In order to increase the efficiency of the network planning and project development processes, cooperation between the Groups should be strengthened. A common Union strategic scenario should provide a consistent reference framework for network planning and project development. It is necessary that the Commission play an important role in facilitating that cooperation with a view to addressing the possible impact of projects developed within one region on other regions and ensuring consistency with the Union’s energy and climate targets and its climate neutrality objective.

(14) In order to complement the Groups, several regional cooperation fora have been established with the support of the Commission. Regional cooperation within and between the fora and the Groups is a key tool to ensure deeper integration of the European energy system. The four High-Level Groups cover different European regions also with the involvement of third countries: the Baltic Energy Market Interconnection Plan (BEMIP), the North Seas Energy Cooperation (NSEC), the High-Level Group on Interconnections for South-West Europe (SWE) and the High-Level Group for Central and South-Eastern European Energy Connectivity (CESEC). Regional cooperation in those fora has been successful in supporting monitoring and accelerating the implementation of key energy infrastructure projects of regional dimension and of market integration actions. Consequently, those regional cooperation fora should be increasingly deployed to support the achievement of the objectives of this Regulation.

(14a) In identifying strategic infrastructure bottlenecks and priority corridors requiring accelerated delivery, the Commission and the Groups should take due account of the specific geographical and system characteristics of Member States, including island Member States, peripheral and outermost regions and Member States with limited interconnection. Such identification should not prejudice the assessment of other projects under this Regulation.

(15) A new Union list of projects of common interest and projects of mutual interest (“the Union list”) should be established every two years. Projects of common interest and projects of mutual interest that have been completed or that no longer fulfil the relevant criteria and requirements as set out in this Regulation should not appear on the subsequent Union list. In particular, projects that have been on the Union list for longer than 10 years should be considered as outdated, and should not be included in the subsequent Union list.

(16) Existing projects of common interest and existing projects of mutual interest that have been on the Union list for less than 10 years and are to be included in the subsequent Union list should be subject to the same selection process for the establishment of regional lists and for the establishment of the Union list applied to proposed projects unless they have obtained an approval of the competent national regulatory authority or a final investment decision providing sufficient assurance of the construction of the projects or their construction is ongoing and they show sufficient progress in their annual report, in which case they should remain on the Union list.

(17) Where existing projects of common interest and existing projects of mutual interest that are to be included in the following Union list are subject to the same selection process for the establishment of regional lists and for the establishment of the Union list applied to proposed projects, the administrative burden should be reduced to the extent possible, for example by using project information submitted previously in the assessment, if still up to date.

(18) Projects of common interest and projects of mutual interest should comply with common, transparent and objective general and specific criteria in view of their contribution to the energy policy objectives. In order to be eligible for inclusion in the Union list, proposed electricity projects, with the exception of smart electricity grids and projects specifically designed to provide protection and resilience to existing critical network elements, should be part of the latest available Union-wide ten-year network development plan. Likewise, proposed hydrogen and electrolyser projects as well as projects related to other renewable and low carbon gases such as e-methane and e-methane production projects, should be part of the latest available Union-wide ten-year network development plan.

(19) Sustainability in terms of the integration of renewable and low carbon energy sources into the grid or the reduction of greenhouse gas emissions, as relevant, is a key criterion for ensuring that trans-European energy networks policy is coherent with the Union’s targets for energy and climate and the 2050 climate neutrality objectives, taking into account the specificities of each Member State in reaching the climate neutrality objective. To this end, sustainability is one of the assessment criteria to be applied for all project categories.

(20) There is a growing need for stronger market integration and interconnectivity of the networks of the Union with those of the European Economic Area (EEA) and the Energy Community. Therefore, the benefits and costs of projects of mutual interest between a Member State and a country in the EEA or a Energy Community contracting party should be considered cumulatively for the Union and for the country concerned in the EEA or the contracting party concerned in the Energy Community.

(21) The Union should facilitate infrastructure projects linking Union networks directly with third-country networks which are mutually beneficial and necessary for the energy transition and the achievement of the climate targets, and which also meet the specific criteria of the relevant infrastructure categories pursuant to this Regulation. To reinforce the focus on cross-border projects and to maintain complementarity with the Union’s external policy, in the case of projects of mutual interest, the projects should directly connect a Member State with the first electricity network connection point or the first hydrogen or carbon dioxide connection point in the third country.

(22) As regards projects of mutual interest related to electricity networks, only interconnection projects linking energy systems should be eligible, provided that their transfer capacity could be fully used for market exchanges. It is the responsibility of the respective transmission system operators (TSOs) to assess in advance the impacts of any projects on the grid security and stability in order to confirm that the project can be fully integrated into the electricity networks of the countries concerned.

(23) It is necessary to ensure that projects of mutual interest, which are granted priority treatment, genuinely advance the Union’s internal market, security of supply and climate neutrality objectives. Therefore, projects of mutual interest should be eligible for inclusion in the Union list only where the policy framework of a third country involved has a high level of convergence and is supported by enforcement mechanisms, and such projects demonstrate a contribution to the Union’s and the third countries’ overall energy and climate policy objectives in terms of security of supply and decarbonisation.

(24) A high level of convergence of the policy framework should be presumed for the EEA or Energy Community contracting parties or can be demonstrated in case of other third countries through bilateral agreements that include relevant provisions on climate and energy policy objectives on decarbonisation and further assessed by the appropriate Group with the support of the Commission. In addition, the third country with which the Union cooperates in the development of projects of mutual interest should facilitate a similar timeline for accelerated implementation and other policy support measures, as provided for in this Regulation.

(25) The third country involved should ensure that the section of the project of mutual interest located in the third country and any additional investments necessary for the total benefits of the project of mutual interest to be implemented, such as internal grid reinforcements, are also treated as a priority and are timely deployed to ensure full use of the project.

(26) In order to ensure that projects for the storage of carbon dioxide which involve third countries contribute to cross-border carbon dioxide transport and storage in a manner consistent with the Union’s climate and environmental requirements, such projects should only be eligible if they are necessary for the functioning of cross-border transport and storage of carbon dioxide and where the third country maintains and effectively enforces an adequate legal framework. This legal framework in the third country should ensure the application of standards and safeguards that prevent carbon dioxide leaks and that guarantee the safety and effectiveness of the permanent storage of carbon dioxide for the protection of climate, human health and ecosystems. Those standards and safeguards should provide a level of protection at least equivalent to that laid down in Union law. It should be presumed that the EEA or Energy Community Contracting Parties meet those standards and safeguards.

(27) Projects of common interest and projects of mutual interest should be implemented as quickly as possible and should be closely monitored by the national competent authorities, the Agency and the Groups, while duly observing the requirements for stakeholder participation and environmental legislation and keeping the administrative burden for project promoters to a minimum. Particular attention should be paid to the assessment of risks as regards climate adaptation and as regards physical and cyber security, building where applicable on the requirements of Directive (EU) 2022/2557 with regard to the resilience of critical entities and the requirements of Directive 2022/2555 of the European Parliament and of the Council with regard to measures for a high level of cybersecurity across the Union, and project promoters should report to the national competent authorities on the measures taken resulting from the risks assessed. Project promoters should also report on the compliance with environmental legislation and demonstrate that projects do ‘no significant harm’ to the environment within the meaning of Article 17 of Regulation (EU) 2020/852 of the European Parliament and of the Council. Project promoters should also assess, where relevant, the possible effects of projects on electricity costs for final consumers. For existing projects of common interest having reached sufficient maturity, those considerations should be taken into account during project selection for the subsequent Union list by the Groups.

(28) The Commission should have the possibility to nominate European coordinators for projects facing particular difficulties or delays, in order to facilitate the implementation of projects which encounter difficulties. In selecting European coordinators, due account should be taken, in particular, of their knowledge of energy matters, including the financing and socio-economic, technical and environmental assessment of major projects, as well as experience in Union policy making.

(29) The permit-granting process should neither lead to administrative burdens which are disproportionate to the size or complexity of a project, nor create barriers to the development of the trans-European networks and market access. The process should include adequate information provision and stakeholder consultation, while upholding Union or national laws regarding access to justice in environmental matters.

(30) Projects of common interest and projects of mutual interest should be given priority status at national level to ensure rapid administrative treatment and urgent treatment in all judicial and dispute resolution procedures relating to them.

(31) Member States that currently do not attribute the highest possible national significance to energy infrastructure projects as regards the permit-granting process, are encouraged to consider introducing such a high national significance, in particular where this could lead to a quicker permit-granting process.

(32) Member States that do not currently have in place accelerated or urgent judicial procedures applicable to energy infrastructure projects should be encouraged to consider introducing such procedures, in particular by evaluating whether that would lead to the quicker implementation of such projects.

(33) Projects concerning hydrogen assets, electrolyser facilities and carbon dioxide assets contribute to energy and climate goals, including with regard to the need to accelerate the deployment of renewable energy and its integration in their energy mix. Therefore, all projects of common interest and projects of mutual interest concerning hydrogen, electrolyser facilities, and carbon dioxide assets should be considered to be of public interest from an energy policy perspective, and it should be possible for Member States to consider them as being of overriding public interest, except for cultural heritage and where there is clear evidence that those projects have significant adverse effects on the environment which cannot be mitigated or compensated for.

(34) Due to their role integrating renewable energy assets, flexibility solutions, energy storage and electrification in general, electricity infrastructure projects are considered essential to reach climate neutrality. Therefore, until the Union climate neutrality target is achieved, such projects, including the refurbishment, modernisation and repowering of existing grid infrastructure, should be presumed to be of overriding public interest and to serve public health and safety where balancing competing legal interests, except for cultural heritage on the basis of legal criteria to ensure harmonised implementation, and where there is clear evidence that those projects have significant adverse effects on the environment which cannot be mitigated or compensated for, as provided for in Directive (EU) 2019/944 of the European Parliament and of the Council.

(35) Due to their importance to reach climate neutrality, and their strategic importance as projects on the Union list, it should be possible for Member States to allow for projects of common interest and projects of mutual interest concerning electricity that have been expressly included in a National Development Plan which was subject to a strategic environmental assessment in accordance with Directive 2001/42/EC of the European Parliament and of the Council, and, if it is likely to have a significant impact on Natura 2000 sites, to the appropriate assessment pursuant to Article 6(3) of Directive 92/43/EEC, to be exempted from environmental impact assessments under Directive 2011/92/EU, from assessments of their implications on species protection pursuant to Article 12(1) of Directive 92/43/EEC and to Article 5 of Directive 2009/147/EC, and from assessments of their implications for Natura 2000 sites. Such exemptions should be possible until climate neutrality is achieved. When developing the National Development Plans, transmission system operators should take into account best practices to avoid and minimise negative impacts on nature and, where feasible, create positive impacts, in accordance with the mitigation hierarchy. The Commission should support this by facilitating access to reliable geospatial databases, assessment tools and sensitivity maps to help prioritise grid infrastructure deployment where environmental and biodiversity impacts are lowest, and by providing guidance on nature-positive practices.

(36) In order to mitigate any possible impact of such exemptions, following the screening Member States’ competent authorities should ensure that appropriate and proportionate mitigation measures are applied, considering the use of the best available technologies. Where it is not possible to apply such mitigation measures, competent authorities should ensure that project promoters adopt appropriate compensatory measures to address those effects, which, if other proportionate compensatory measures are not available, may include the payment of monetary compensation for species protection programmes. In addition, where a project is likely to have significant negative effects on the environment of another Member State, the national competent authorities should ensure that the Member States concerned have cooperated to identify measures to avoid the significant impacts, or, where needed, to mitigate or compensate them.

(37) In order to speed up the deployment of the trans-European energy network, the conditions for applying specific derogations as set out in Union environmental legislation should be clear. In particular, when assessing whether there are satisfactory alternative solutions to energy projects, the scope of such assessment should be limited to alternative solutions that ensure the achievement of the same objective within the same or similar timeframe and without resulting in significantly higher costs. When comparing the timeframe and the cost of satisfactory alternative solutions, the relevant authorities should be able to take into account the need to deploy projects of common interest and projects of mutual interest in an accelerated and cost-effective manner in accordance with the priorities set out in their integrated national energy and climate plans and updates thereof submitted to the Commission pursuant to Regulation (EU) 2018/1999.

(38) Similarly, when applying the relevant derogation provided for in Directive 92/43/EEC, it is appropriate that the relevant authorities may, in justified cases and where it can be reasonably demonstrated that the plan or project would not irreversibly affect, before the measures are put into place, the overall coherence of the Natura 2000 network, the environmental integrity of the site is preserved and a high level of protection of the Natura 2000 sites is ensured, allow that compensatory measures are carried out in parallel with the implementation of the plan or project.

(39) In order to reduce complexity, increase efficiency and transparency, and help enhance cooperation among Member States, Member States should ensure that there is one single competent authority responsible for facilitating and coordinating all permit-granting processes towards the issuing of a comprehensive decision, cooperating with other concerned authorities and national competent authorities of other Member States, acting as a sole point of contact for promotors mediating their contact with other authorities, and monitoring the development and delays of projects on the Union list.

(40) To increase the efficiency of procedures, national competent authorities should also be responsible for ensuring that, for hybrid transmission and generation projects, the timeline for permitting aligns to all assets of the project in a manner that expedites the permit-granting process for the generation and transmission assets.

(41) In order to simplify and expedite the permit-granting process for projects on the Union list located in two or more Member States, a unique point of contact amongst the national competent authorities should be jointly designated by the Member States concerned. Having a single authority facilitating the process, and issuing the final ▌decision, should lighten the administrative burden for project developers and reduce complexity, increase efficiency and speed up the permit-granting process, especially where Member States provide for joint procedures with aligned timelines and assessments. To ensure effective cross-border cooperation, the Commission should focus on identified interconnection priority projects strengthening the coordination and monitoring of their implementation and permitting. For that purpose, the Commission should support Member States in identifying joint procedures for an effective and efficient permit-granting process.

(42) Member States should be able to include in comprehensive decisions, where appropriate, decisions taken in the context of negotiations with individual landowners to grant access to, ownership of, or a right to occupy, property in the context of spatial planning, which determines the general land use of a defined region, including other developments such as highways, railways, buildings and nature protection areas and which is not undertaken for the specific purpose of the planned project and granting of operational permits. In the context of the permit-granting process, a project of common interest should be able to include related infrastructure to the extent that it is essential for the construction or functioning of the project.

(43) This Regulation, in particular the provisions on permit-granting, public participation and the implementation of projects of common interest, should apply without prejudice to Union and international law, including provisions to protect the environment and human health, and provisions adopted under the Common Fisheries Policy and Integrated Maritime Policy, in particular Directive 2014/89/EU of the European Parliament and of the Council.

(44) It is essential that stakeholders, including civil society, are provided with information and are consulted, in order to ensure the success of projects and to limit objections to them. Despite the existence of established standards ensuring the participation of the public in environmental decision-making procedures, which apply fully to projects of common interest, additional measures should be required to ensure the highest possible standards of transparency and public participation in all relevant issues in the permit-granting process for projects of common interest. Such participation should take place at an early stage, in order to allow stakeholders to contribute effectively to the identification of alternatives and to the most suitable location, trajectory or technology. Where already covered by national rules under the same or higher standards as in this Regulation, the pre-consultation ahead of the permit-granting process should be optional and duplication of legal requirements should be avoided.

(45) The correct and coordinated implementation of Directives 2001/42/EC and 2011/92/EU and, where applicable, of the United Nations Economic Commission for Europe Convention on access to information, public participation in decision-making and access to justice in environmental matters, signed in Aarhus on 25 June 1998 (the ‘Aarhus Convention’), and of the Convention on environmental impact assessment in a transboundary context, signed in Espoo on 25 February 1991 (the ‘Espoo Convention’), should ensure the harmonisation of the main principles for the assessment of environmental and climate effects, including in a cross-border context. The Commission has issued guidance to support Member States to streamline the environmental assessment procedures for energy infrastructure and to ensure the coherent application of environmental assessment procedures required under Union law for projects of common interest.

(46) It is important to streamline and improve the permit-granting process, while respecting, to the extent possible and with due regard to the principle of subsidiarity, national competences and procedures for the construction of new energy infrastructure. Given the urgency of developing energy infrastructures, the simplification of the permit-granting process should set a clear time limit for the decision of the relevant authorities regarding the construction of the project. That time limit should stimulate an efficient definition and handling of procedures. This Regulation should establish maximum time limits. However, Member States can strive to achieve shorter time limits where feasible, in particular, as regards projects such as smart grids, which may not require as complex a permit-granting process as the one for transmission infrastructure.

(47) The lack of resources of permit-granting authorities and the lack of digitalisation of permit-granting processes and data availability are bottlenecks slowing down permit-granting processes. Digitalisation and an appropriate use of artificial intelligence features are expected to speed up procedures and to increase efficiency of processes by allowing for faster handling of applications and increase transparency through improved access to information on procedural steps and requirements. However, digitalisation of permit-granting processes is lagging behind, with data often scattered across different competent authorities without unified digital processes or platforms, and without interoperability being ensured. That leads to lack of clarity on the status of the applications and hindering the identification of bottlenecks. Therefore, Member States should set up a digital platform at national level for all the steps of the permit-granting processes for renewable energy, storage and grid projects so that the digitalisation of procedures is uniform, interoperable and transparent maximising its benefits in terms of speeding up the permit-granting process. Such platforms should enable project promoters to file applications and check their status, attribute them to the competent authorities, and allow authorities to process them by having access to all relevant data and information, without the need for intermediate paper-based steps. In addition, such platform should allow for the extraction of statistics on the overall progress of permit-granting processes in Member States. Such digital platforms should rely on secure and interoperable means provided through European Digital Identity Wallets, in compliance with the requirements of Regulation (EU) No 910/2014, for natural persons and, in the future, with European Business Wallets, in compliance with [Regulation (EU) No XXX/20YY], for legal persons, for enabling electronic identification and authentication, signing or sealing of documents, submission of documents and sending or receiving notifications between competent authorities and economic operators

(48) The competent authorities should be responsible for ensuring compliance with the time limits established in this Regulation. Further, in line with the urgency to deploy energy infrastructures, and the strategic importance of projects of common interest and projects of mutual interest to achieve the Union’s energy and climate goals and to the extent that the concept of tacit approval exists under national law, Member States should ensure that the lack of a reply by the national competent authorities within the deadline set out in this Regulation, or a lack of a reply by an authority concerned within the deadline established by the national competent authority, leads to the specific opinion, authorisation or permit being tacitly approved or answered positively, with the exception of environmental decisions, and that such conclusion is made public.

(49) The permit-granting process should provide for two procedures, namely the optional pre-application procedure where the work towards a complete application file is delivered and accepted by the national competent authority, and the mandatory statutory permit-granting procedure between the acceptance of the file and the moment the authorities render a comprehensive decision. Within the pre-application phase national competent authorities should carry out a series of tasks. They should screen the project and notify the project promoter of what authorisations, studies, permits and assessments are required to complete the permit-granting process, including the environmental assessments and mitigation or compensation measures that should be deployed. They should define the scope and level of detail of the documentation identified in the screening conclusions, making sure that no subsequent documentation is to be requested from the project promoter save for where a material change has occurred to the project or its surrounding environment that renders the conditions and assumptions used to determine the scope non-applicable. They should draw up a detailed schedule for the permit-granting process. After receiving the draft application file, including all the preparatory documents, they should decide whether the file is deemed complete or requires the missing information in accordance with what was identified at the pre-application procedure.

(50) Where it is considered efficient, the national competent authorities may design the permitting requirements for the permit-granting process and public consultations of a certain project to take place in phases, provided the permit-granting process is simplified and accelerated.

(51) This Regulation should apply only to the granting of permits for projects of common interest and projects of mutual interest, public participation therein and the regulatory treatment of the projects. Member States should nevertheless be able to adopt national provisions to apply the same or similar rules to other projects that do not have the status of projects of common interest or projects of mutual interest within the scope of this Regulation.

(51a) The Draghi report identified the fact that the current system still reserves a number of tasks and responsibilities of a regulatory nature to private bodies with commercial interests as one of the causes of the low degree of integration in the Union energy market. Today, many system operators are still owners of the infrastructure and, at the same time, are those in charge of operating it and planning its development. In addition, regulatory practices mostly award capital expenditure, with physical assets constituting a larger share of the asset base of the system operators. It is crucial to untangle those functions, especially where they fall within the remit of commercial entities, to address the structural advantage in favour of building more wires, while demand-side flexibility, storage and community energy projects remain underutilised. All tasks of a regulatory nature should be performed by regulatory agencies acting in the public interest. For that reason, as part of the review of this Regulation, the Commission should assess the need for, and feasibility of, establishing an Independent European System Planner as a permanent and independent entity at Union level.

(52) The Union-wide ten-year network development plan process provides a solid basis for the identification of projects of common interest and projects of mutual interest. While the European Network of Transmission System Operators for Electricity (ENTSO for Electricity), the European Network of Transmission System Operators for Gas (ENTSO for Gas), the European Network of Network Operators for Hydrogen (ENNOH) and TSOs continue to play an important role in the process, more streamlining and steering is required, in particular as regards defining the scenarios for the future, identifying long-term infrastructure gaps and energy infrastructure bottlenecks and addressing those gaps with most adequate solutions, to increase the political weight, pertinence and robustness of the process. Therefore, the Agency and the Commission should have an increased role in the process for drawing up the Union-wide ten-year network development plans pursuant to Regulations (EU) 2019/943 and (EU) 2024/1789 and, in particular, the Commission should lead and coordinate the development of a Union strategic scenario providing a common reference framework for infrastructure planning and assessment.

(53) Considering that the selected scenario, the sensitivities and its underlying assumptions play a major role in the Union-wide network development planning process, the Commission should play a central role in defining it. That should help streamline the inputs and ensure better compliance with the Union’s policy targets. It is therefore appropriate for the Union-wide ten-year network development plans to be based on a Union strategic scenario providing a common reference framework, comprising an initial scenario, an alternative scenario and mandatory sensitivity analyses, with a perspective until at least 2050. The Union strategic scenario should take a cross-sectoral approach and take into account relevant national and regional specificities and planning instruments, while ensuring consistency and comparability of assumptions at Union level. The increased importance of the Union strategic scenario requires close involvement of the ENTSO for Electricity, the ENNOH, and the ENTSO for Gas, the Member States and the Agency to ensure that relevant data and information is provided, and that the scenario is aligned with national developments. The Stakeholder Reference Group should continue providing coordinated stakeholder input and advice on scenario development.

(54) The process of identifying infrastructure needs should play a stronger role in guiding planned infrastructure investments. Compared to current practice, the process should be broader and consider more thoroughly cross-sectoral links and non-wire solutions, including grid enhancing technologies, including behind the meter cross-sectorial demand flexibility, alternative national solutions, in order to clearly identify what solutions best serve the energy system in achieving the energy affordability, resilience and climate goals. It should be based on the Union strategic scenario and its sensitivity analyses and should take into account available and emerging grid-enhancing and digital solutions, as well as relevant climate and system risks. The Agency should be more involved in setting the framework for the process and its verification to increase acceptance of the subsequent solutions necessary to address the gaps. A binding methodology developed by the Agency should ensure a robust and consistent identification of infrastructure needs, while the Agency should assess the resulting reports for compliance with the requirements of this Regulation. The Agency should also have the power to request justified amendments, and to approve or amend the draft infrastructure needs identification report.

(55) Making the process of identifying infrastructure needs more comprehensive and granular should enable better matchmaking of planned projects with the needs for transmission capacity expansion. It should also enable a follow-up process leading to identifying new solutions which could address unmatched needs. Where identified needs are not fully addressed, as a last resort the Commission should, without undue delay, initiate a targeted process to identify possible solutions, taking into account the Union strategic scenario and its sensitivity analyses. System operators should be the primary entity to suggest possible projects to address the gaps, but alternative solutions coming from other stakeholders should also be considered. Therefore, a needs matching process should be an outcome of regional cooperation and involve relevant stakeholders in the discussions. The central role of the Commission in the process should enhance regional cooperation and involvement of Member States, national regulatory authorities, project promoters and other relevant stakeholders in the effort to come up with the most adequate projects, be it non-wire or infrastructure solutions to match any possible unaddressed needs. The process should take into account the Union strategic scenario and its sensitivity analyses. As a last resort, the Commission should launch a targeted call for proposals to overcome insufficient progress in addressing persisting gaps. It should be ensured that eligible projects are included as soon as possible in the subsequent national development plans, Union-wide ten-year network development plan and the Union list.

(55a) In identifying infrastructure needs and optimising the use of existing electricity networks, system operators, the Commission, Member States, the Agency and the competent national authorities should take into account the system value delivered by grid-supportive assets, including electricity storage and other non-fossil flexibility resources, at all voltage levels, including transmission networks. Such assets can contribute to congestion relief, efficient use of network capacity, system security and cross-border integration, in line with the objectives of this Regulation and without prejudice to the application of Directive (EU) 2019/944.

(56) An energy system-wide cost-benefit analysis is necessary to ensure that infrastructure planning reflects the evolving needs of an integrated and decarbonised system, by consistently assessing all relevant costs and benefits in order to identify the most efficient solutions for achieving Union energy and climate objectives. The methodologies used for that analysis should be based on common assumptions and on the Union strategic scenario and its sensitivity analyses and should ensure a cross-sectoral approach and contribute to the resilience of the energy system. Non-wire solutions, such as dynamic line and transformer rating, advanced power flow control systems or digital twin platforms should play a greater role in addressing network needs both in operational and expansion terms and should therefore also be covered by the energy system wide cost-benefit analysis.

(57) The Union-wide ten-year network development plan should provide a comprehensive overview of planned infrastructure projects having cross-border impacts in the Union. Non-wire and flexibility solutions should form an intrinsic part of the plan so that it provides a full picture of future investments necessary for optimal operation of the electricity and hydrogen networks. A specific consideration should also be given to projects improving security and resilience of the network.

(58) In carrying out their tasks preceding the adoption of the Union-wide ten-year network development plans, the ENTSO for Electricity and the ENNOH, the Agency and the Commission should conduct an extensive consultation process involving all relevant stakeholders. Those stakeholders should include the European entity for the cooperation of electricity distribution system operators in the European Union , associations involved in electricity, gas and hydrogen markets, heating and cooling, carbon capture and storage and carbon capture and utilisation stakeholders, independent aggregators, demand-response operators, organisations involved in energy efficiency solutions, industrial sectors including transport, digitalisation, and data, as well as energy consumer associations, the European Scientific Advisory Board on Climate Change and civil society representatives, as relevant. The Stakeholder Reference Group has proven to be an effective forum of stakeholder cooperation and its further contribution to the Union wide ten-year network development plan should be supported. The consultation should be open and transparent and should be organised in a timely manner to allow for stakeholders’ feedback in the preparation of key phases of the Union-wide ten-year network development plans, such as infrastructure gaps identification and the cost-benefit analysis methodology for project assessment. The Commission should duly consider the input received and explain how it has been taken into account in the adopted Union strategic scenario.

(59) Energy infrastructure planning should properly reflect sector coupling and cross-linkages between energy carriers. The development of the Union strategic scenario, the process of identifying infrastructure needs and the methodologies for cost-benefit analysis should be based on an integrated, long-term and optimised ‘one energy system’ approach and modelling which uses common assumptions and consistent methodologies. Greater coordination of infrastructure planning across sectors should help prioritise and deploy new infrastructure solutions in a more optimal manner. The Union strategic scenario should in particular ensure consistency across the electricity, hydrogen and gas sectors and, where relevant, CO₂ transport and storage, while taking into account relevant national and regional specificities.

(60) The importance of ensuring that only infrastructure projects for which no reasonable alternative solutions exist may receive the status of project of common interest or project of mutual interest also entails that the ‘energy efficiency first’ principle should be taken into account in the energy infrastructure planning and in the work of the regional groups in establishing the regional lists of proposed projects. In accordance with the energy efficiency first principle, all relevant alternatives to new infrastructure for ensuring future infrastructure needs, should be considered. Special consideration should be given to non-wire, innovative transmission, distribution and grid optimisation technologies, , use of demand response or non-fossil flexibility, which could improve overall efficiency of the networks. To this aim, these solutions should be considered with priority by system operators when assessing projects for system expansion. A cost-efficient utilisation of networks should also be incentivised, notably through the use of locational and time-of-use price signals in network charges and support schemes. The energy system-wide cost-benefit analysis should also take into account cross-sectoral interactions and the contribution of projects to the Union’s energy and climate objectives, as well as to the resilience of the energy system.

(60a) A comprehensive assessment of the Union energy infrastructure framework is needed to provide an integrated strategic overview of the results of the infrastructure planning processes and to identify the main future infrastructure needs, priorities and gaps at Union level. Such an assessment should complement the Union strategic scenario by providing a long-term perspective on the evolution of the Union energy system, including its interdependencies across sectors, and should support coordinated and timely investment decisions while not replacing the specific planning and project selection processes established under this Regulation.

(61) To achieve the Union’s 2050 climate neutrality objective, the Union needs to significantly scale up renewable electricity generation. Investment in offshore renewable energy should be increased with the aim of reaching at least 350 GW of offshore renewable generation installed in accordance with the cumulative non-binding regional Member States offshore renewable goals updated in December 2024 and supported in the Commission Communication of 24 October 2023 entitled ‘Delivering on the EU offshore renewable energy ambitions’. The first Offshore network development plans (ONDPs) published by the ENTSO for Electricity in January 2024 made an important step forward by anchoring Member States offshore regional ambitions in offshore network planning. That should support the identification of cross-border offshore renewable projects, including hybrids and cross-border radials, to ensure an optimized and cost-efficient development of offshore networks at sea-basin level. That planning should also take account of the offshore and related onshore grid infrastructure required to accommodate offshore renewable generation, including in island Member States, peripheral and outermost regions with significant renewable generation potential and limited existing interconnection. Increased cooperation between transmission system operators should be encouraged in order to identify efficient offshore and onshore grid solutions. The strategic long-term logic included in the ONDPs should be extended to onshore electricity grids, as well as hydrogen networks. The ONDPs should be developed jointly by the ENTSO for Electricity and the ENNOH, taking into account the Union strategic scenario, and should support the coherent development of offshore electricity and hydrogen infrastructure.

(62) The assessment of the benefits and costs of the priority offshore grid corridors for renewable energy should support Member States to carry out a preliminary cost-sharing analysis at priority offshore grid corridor level, in order to underpin the subsequent joint political commitments for cross-border offshore grid projects. The Commission guidance on collaborative investment frameworks for offshore projects of 27 June 2024 should inform the assessment of the benefits and costs of the priority offshore grid corridors for renewable energy and may be updated by the Commission, with the involvement of the Member States, relevant TSOs, HTNOs, the ENNOH, the Agency and the national regulatory authorities, when considered relevant. The guidance should, where available, also include a uniform cross-border cost-allocation methodology for offshore hybrid projects.

(63) The costs of the development, construction, operation and maintenance of projects of common interest should in general be borne by the users of the infrastructure. The cost allocation should ensure that end-users are not disproportionately burdened, especially where that could lead to energy poverty. Projects of common interest should be eligible for cross-border cost allocation where an assessment of market demand, or of the expected effects on tariffs, indicates that costs cannot be expected to be recovered by the tariffs paid by the infrastructure users.

(64) In an increasingly interconnected internal energy market, clear and transparent rules for cross-border cost-allocation are necessary in order to accelerate investment in cross-border infrastructure and in projects with a cross-border impact. As cross-border energy infrastructure becomes more integrated, more projects deliver benefits beyond the territories where they are built. That makes fair and transparent cost-sharing essential to avoid disproportionate burdens on local consumers. The discussion on the appropriate allocation of costs should be based on the analysis of the costs and benefits of an infrastructure project carried out on the basis of a harmonised methodology for energy-system-wide analysis, using the Union strategic scenario and any sensitivities established for the purpose of the Union-wide ten-year network development plans prepared pursuant to Regulations (EU) 2019/943 and (EU) 2024/1789, allowing for a robust analysis of the contribution of the project of common interest or mutual interest to the Union energy policies of decarbonisation, market integration, competition, sustainability and security of supply. Member States and national regulatory authorities in which at least 10 % of the estimated benefits of a project occur and which are involved directly or indirectly in interconnected projects should participate in discussions on cost allocation to ensure that the project can be implemented and its benefits delivered. Furthermore, cross-border cost allocation agreements should consider ex-post arrangements to ensure fair and proportionate participation of non-host countries, provided that such adjustments are clearly defined and structured in a way that safeguards investment certainty. In the case of offshore hybrid projects integrating a hybrid interconnector and an offshore renewable joint project, the cross-border cost allocation should be based on a uniform methodology taking into account both infrastructure and generation assets.

(64a) The increasing integration of the internal electricity market and deployment of renewable energy are leading to growing cross-border electricity flows and changing the distribution of network-related costs and benefits. At the same time, Member States may lack sufficient incentives and financial visibility to develop infrastructure projects that deliver positive benefits at Union or regional level where such benefits are not fully reflected at national level. Existing mechanisms, particularly the Inter-Transmission System Operator Compensation mechanism and cross-border cost allocation, help to address those challenges but may not always ensure a cost-reflective and cost-causation-based allocation or sufficient incentives for infrastructure beyond national needs. Against this background, the Commission should without undue delay assess the amounts for compensation. In particular, it should be examined to what extent the current framework ensures cost-reflectivity, cost causation and enables a balanced allocation of costs and benefits among Member States. On that basis, the Commission should submit the necessary legislative proposals.

(65) It is essential to ensure a stable financing framework for the development of projects of common interest while minimising the need for financial support, and at the same time to encourage interested investors, with appropriate incentives and financial mechanisms. In deciding on cross-border cost-allocation, national regulatory authorities should allocate efficiently incurred investment costs, as relevant in view of their national approaches and methodologies for similar infrastructure, across borders in their entirety and include them in the national tariffs. Afterwards, where relevant, national regulatory authorities should determine whether their impact on national tariffs could represent a disproportionate burden for consumers in their respective Member States. The national regulatory authorities should avoid the risks of double support for projects by taking into account actual or estimated charges and revenues. Those charges and revenues should be taken into account only in so far as they relate to the projects and are designed to cover the costs concerned.

(66) To facilitate discussions on cost-sharing and permitting between the relevant Member States and third countries a possibility of bundling projects of common interest and projects of mutual interest should be provided. By allowing groups of Member States to treat a project bundle as mutually beneficial, win-win solutions can be fostered, risks and transaction costs in negotiations reduced, and the likelihood of implementation can be increased. Where appropriate, cost-benefit analyses and cost-sharing proposals may be assessed at bundle level to facilitate cross-border cost-allocation decisions. Additional support at Union level, for example through the Connecting Europe Facility, or at regional level using congestion income, could further facilitate such agreements and promote the timely delivery of priority infrastructure.

(67) Regulation (EU) 2019/943 lays down, in Article 19(2), three priority objectives for the use of revenues resulting from the allocation of cross-zonal capacity, namely: (a) guaranteeing the actual availability of the allocated capacity, including firmness compensation; (b) maintaining or increasing cross-zonal capacities through the optimisation of existing interconnectors or by covering costs resulting from network investments relevant to reducing interconnector congestion; and (c) compensating offshore renewable electricity generation plant operators in the circumstances set out therein. TSOs should ensure that all three priority objectives are fulfilled, including the objective in point (b). In order to facilitate the financing of projects of common interest and projects of mutual interest that reduce interconnector congestion and to bring predictability and transparency to discussions on cross-border cost allocation decisions pursuant to Article 16 of this Regulation, it is appropriate to require TSOs to set aside 30 % of congestion rents not allocated to the priority objectives under Article 19(2), points (a) and (c), of Regulation (EU) 2019/943 for such investments. Congestion rents arising from internal bidding zone borders within a Member State should not be subject to that requirement. That requirement is without prejudice to the responsibility of TSOs to decide on funding priorities, under the supervision of regulatory authorities and in accordance with the methodology approved pursuant to Article 19(4) of Regulation (EU) 2019/943. That requirement should not apply where it can be demonstrated that there is no need for additional cross-border capacity to be built at the borders of the Member State concerned.

(67a) Congestion rents under this Regulation should be used to support investments that reduce interconnector congestion and strengthen the electricity system. Where the conditions laid down in Article 19 of Regulation EU 2019/943 have been fulfilled, they may also contribute to improving resource adequacy through support to low-carbon and renewable electricity generation and to targeted measures supporting final electricity customers, thereby enhancing security of supply, affordability and the resilience of the Union’s electricity system.

(68) Where there is no TSO in a Member State, the references to TSOs throughout this Regulation should apply mutatis mutandis to distribution system operators (DSO).

(69) The internal energy market legislation requires that tariffs for access to networks provide appropriate incentives for investment. However, several types of projects of common interest are likely to have externalities that might not be fully captured in, and recovered through, the regular tariff system. In applying the internal energy market legislation, national regulatory authorities should ensure a stable and predictable regulatory and financial framework with incentives for projects of common interest, including long-term incentives, that are commensurate with the level of specific risk of the project. That framework should apply in particular to cross-border projects, innovative transmission technologies for electricity allowing for the large scale integration of renewable energy, of distributed energy resources or of demand response in interconnected networks, and energy technology and digitalisation projects, which are either likely to incur higher risks than similar projects located within one Member State or which promise higher benefits for the Union. Moreover, projects with high operational expenditure should also have access to appropriate incentives for investment. In particular, offshore grids for renewable energy, which serve the dual functionality of electricity interconnectors and connecting renewable offshore generation projects, are likely to incur higher risks than comparable onshore infrastructure projects, due to their intrinsic connection to generation assets which brings regulatory risks, financing risks such as the need for anticipatory investments, market risks and risks pertaining to the use of new innovative technologies.

(70) Regulation (EU) 2022/869 has demonstrated the added value of leveraging private funding through significant Union financial assistance to allow the implementation of projects of Union significance. In the light of the economic and financial situation and budgetary constraints, targeted support should continue under the multiannual financial framework, also with a view to de-risking projects and crowding in private investment, in order to maximise the impact of public funding and its benefits to Union citizens and to attract new investors into the energy infrastructure priority corridors and areas set out in Annex I to this Regulation, while keeping the budgetary contribution of the Union to a minimum. To achieve this, Union financial assistance should act as a catalyst for mobilising private investment, while keeping the direct budgetary contribution of the Union to a minimum. Financing cross-border hydrogen infrastructure can be particularly challenging due to the anticipatory nature of its development and its dependence on the progressive development of the hydrogen market. Appropriate Union-level de-risking and financing mechanisms could therefore help facilitate investment and provide greater certainty for project promoters.

(71) Projects of common interest should be eligible for Union financial assistance for studies and, under certain conditions, for works pursuant to Regulation (EU) 2021/1153 of the European Parliament and of the Council in the form of grants or innovative financial instruments to ensure that tailor-made support can be provided to those projects of common interest which are not viable under the existing regulatory framework and market conditions. For cross-border hydrogen infrastructure, appropriate Union-level de-risking and financing mechanisms may facilitate investment where the existing regulatory framework and market conditions do not provide sufficient certainty. It is important to avoid any distortion of competition, in particular between projects contributing to the achievement of the same Union priority corridor. Such financial assistance should ensure the necessary synergies with other Union funds available for financing smart energy distribution networks, and with the Union renewable energy financing mechanism established by Commission Implementing Regulation (EU) 2020/1294.

(72) A three-step logic should apply to investments in projects of common interest. First, the market should have the priority to invest. Second, where investments are not made by the market, regulatory solutions should be explored, the relevant regulatory framework should be adjusted where necessary, and the correct application of the relevant regulatory framework should be ensured. Third, where the first two steps are not sufficient to deliver the necessary investments in projects of common interest, it should be possible to grant Union financial assistance where the project of common interest fulfils the applicable eligibility criteria.

(73) Projects of common interest and projects of mutual interest should not be eligible for Union financial assistance where the project promoters, operators or investors are in one of the situations of exclusion referred to in Article 138 of Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council, such as in cases of a conviction for fraud, corruption or conduct related to a criminal organisation. It should be possible to remove a project of common interest from the Union list if its inclusion in that list was based on incorrect information which was a determining factor for that inclusion, or if the project does not comply with Union law. For a project of common interest located in the Member States benefiting from a derogation under this Regulation, those Member States should ensure, when supporting any applications for financing pursuant to Regulation (EU) 2022/869 for such projects, that the projects do not benefit directly or indirectly persons or entities that are in one of the situation of exclusion as referred to in Article 138 of Regulation (EU, Euratom) 2024/2509.

(74) Grants for works related to projects of mutual interest should be available under the same conditions as for projects of common interest where they contribute to the Union’s overall energy and climate policy objectives and where the decarbonisation objectives of the third country are consistent with the Paris Agreement.

(74a) Distribution grids play a major role for the energy transition. 40 % of the Union's distribution grid is more than 40 years old and needs to be upgraded. Investments of EUR 730 billion for distribution grids by 2040 are needed to enable the integration of new, clean, low-marginal-cost generation projects reducing wholesale electricity prices. The National and Regional Partnership Plans can reinforce the energy infrastructure investments provided by CEF, for instance through investment in energy assets that do not have a cross-border nature but are equally important for the energy transition.

(75) The Union should facilitate energy projects in disadvantaged, less connected, peripheral, outermost or isolated regions to enable access to the trans-European energy networks in order to accelerate the decarbonisation process and reduce dependency on fossil fuels. Particular attention should be paid to outermost regions within the meaning of Article 349 TFEU and islands, which may benefit less from cross-border infrastructure instruments and rely more heavily on cohesion policy funding for essential energy investments. Synergies between the CEF and cohesion policy instruments, including National and Regional Partnership Plans, should therefore be strengthened.

(76) In accordance with the European Council conclusions of 4 February 2011 that no Member State should remain isolated from the European gas and electricity networks after 2015 or see its energy security jeopardised by lack of the appropriate connections, this Regulation aims to ensure access to the trans-European energy networks by ending the energy isolation of Cyprus and Malta, that are still not interconnected to the trans-European gas network. That objective should be attained by allowing projects under development or planning that have been granted the status of project of common interest under Regulation (EU) 2022/869 to maintain their status until Cyprus and Malta are interconnected to the trans-European gas network or until 31 December 2029, whichever is earliest. Apart from contributing to the development of the renewable energy market, the flexibility and resilience of the energy system, and the security of supply, those projects would ensure access to future energy markets, including hydrogen, and contribute to achieving the Union’s overall energy and climate policy objectives.

(77) To ensure consistency of proposed changes under this Regulation with the Union framework on electricity, gases and hydrogen markets, corresponding amendments are proposed to Articles 3 and 11 of Regulation (EU) 2019/942 of the European Parliament and of the Council, Article 48 of Regulation (EU) 2019/943 and Articles 60 and 61 of Regulation (EU) 2024/1789. Those amendments relate to the use of the Union strategic scenario in the Union-wide ten-year network development plans, the identification of system needs, the consideration of alternatives to network expansion and the assessment of system resilience, as well as cooperation between the ENNOH, the ENTSO for Electricity and the ENTSO for Gas in integrated network planning. Those Regulations should therefore be amended accordingly.

(78) In order to ensure the timely development of essential energy infrastructure projects for the Union, the third Union list of projects of common interest and projects of mutual interest should remain in force until the first Union list of projects of common interest and projects of mutual interest established pursuant to this Regulation enters into force. Moreover, to enable the development, monitoring and financing of the projects of common interest on the third Union list pursuant to the Regulation (EU) 2022/869, certain provisions of Regulation (EU) 2022/869 should remain in force and produce effects until the entry into force of the first Union list of projects of common interest and projects of mutual interest established pursuant to this Regulation.

(78a) Interconnector transmission system operators whose sole activity is the ownership, operation and maintenance of electricity interconnectors have a distinct position in the Union electricity internal market. The regulatory treatment of such operators should take their specificities into account and should not impede new interconnector investments. The Commission should assess their situation and, where appropriate, propose targeted amendments to Regulation (EU) 2019/943 and Directive (EU) 2019/944.

(79) In order to ensure that the Union list is limited to projects which contribute the most to the implementation of the strategic energy infrastructure priority corridors and areas set out in Annex I to this Regulation, the power to adopt acts in accordance with Article 290 of the Treaty should be delegated to the Commission in order to amend the annexes to this Regulation so as to establish and review the Union list, while respecting the right of the Member States to approve projects on the Union list related to their territories.

(80) The power to adopt acts in accordance with Article 290 of the Treaty should be delegated to the Commission to develop the Union strategic scenario, which is the basis for the Union-level network planning.

(81) The power to adopt acts in accordance with Article 290 of the Treaty should be delegated to the Commission to specify the conditions under which TSOs may use congestion income and the conditions under which the objective of Article 19(2), point (b), of Regulation (EU) 2019/943 is considered adequately fulfilled.

(82) It is of particular importance that the Commission carry out appropriate consultations during its preparatory work, including at expert level, and that those consultations be conducted in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making. In particular, to ensure equal participation in the preparation of delegated acts, the European Parliament and the Council receive all documents at the same time as Member States' experts, and their experts systematically have access to meetings of Commission expert groups dealing with the preparation of delegated acts.

(83) The discussions in the Groups are instrumental for the Commission to adopt the delegated acts establishing the Union list. Therefore, it is appropriate that, to the extent possible, the European Parliament and the Council are informed about the results, and may send experts to the meetings of Groups in accordance with the Interinstitutional Agreement of 13 April 2016 on Better Law Making. Taking into account the need to ensure the achievement of the objectives of this Regulation and, in view of the number of projects on Union lists so far, the total number of projects on the Union list should remain manageable and therefore should not significantly exceed 220.

(84) Therefore, Regulations (EU) 2019/942, (EU) 2019/943 and (EU) 2024/1789 should be amended accordingly, and Regulation (EU) 2022/869 should be repealed.

(85) Since the objectives of this Regulation, namely the development and interoperability of trans-European energy networks and connection to such networks that contribute to ensuring climate change mitigation, in particular achieving the Union’s targets for energy and climate and its climate neutrality objective by 2050 at the latest, and to ensuring interconnections, energy security, market and system integration, competition that benefits all Member States, and affordable energy prices, cannot be sufficiently achieved by the Member States but can rather, by reason of the scale and effects of the proposed action, be better achieved at Union level, the Union may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty on European Union. In accordance with the principle of proportionality, as set out in that Article, this Regulation does not go beyond what is necessary in order to achieve those objectives,

HAVE ADOPTED THIS REGULATION:

CHAPTER I

General provisions

Article 1 Subject matter and scope

1. This Regulation lays down guidelines for the timely development and interoperability of the priority corridors and areas of trans-European energy infrastructure (energy infrastructure priority corridors and areas) set out in Annex I, that contribute to ensuring energy affordability, energy system resilience and climate change mitigation, in particular achieving the Union’s targets for energy and climate and its climate neutrality objective by 2050 at the latest, and climate change adaptation, in particular increasing resilience of the networks, and to ensuring interconnections, energy security, market and system integration and competition that benefits all Member States, as well as affordability of energy prices, enabling low energy system costs and leading to higher affordability of energy.

2. In particular, this Regulation:

(a) provides for the identification of projects of common interest and of projects of mutual interest on the Union list;

(b) facilitates the timely implementation of projects on the Union list by streamlining, coordinating more closely and accelerating permit-granting processes, and by enhancing transparency and public participation;

(c) provides rules for the cross-border allocation of costs and risk-related incentives for projects on the Union list;

(d) determines the conditions for eligibility of projects on the Union list for Union financial assistance.

Article 2 Definitions

For the purposes of this Regulation, in addition to the definitions in Regulations (EU) 2018/1999, (EU) 2019/942 and (EU) 2019/943 and (EU) 2024/1789, and in Directive (EU) 2018/2001 of the European Parliament and of the Council and Directives (EU) 2019/944 and (EU) 2024/1788 the following definitions apply:

(1) ‘energy infrastructure’ means any physical equipment or facility falling under the energy infrastructure categories set out in Annex II which is located within the Union, or linking the Union and third countries;

(2) ‘energy infrastructure bottleneck’ means limitation of physical flows in an energy system due to insufficient transmission capacity, which includes, inter alia, the absence of infrastructure;

(3) ‘comprehensive decision’ means the binding document, available to project promoters in writing or electronic form, comprised of, or containing, the decision or set of decisions taken by a Member State authority or authorities other than courts or tribunals, that determines whether or not a project promoter is authorised to build the energy infrastructure to realise a project of common interest or a project of mutual interest by having the possibility to start, or procure and start, the necessary construction works (ready-to-build phase) without prejudice to any decision taken in the context of an administrative appeal procedure;

(4) ‘project’ means one or several lines, pipelines, facilities, equipment or installations falling under the energy infrastructure categories set out in Annex II;

(5) ‘project of common interest’ means a project which is necessary to implement the energy infrastructure priority corridors and areas set out in Annex I and which is on the Union list;

(6) ‘project of mutual interest’ means a project promoted by the Union in cooperation with one or more third countries, which is supported by the governments of the directly affected countries, contributes to the Union’s 2050 climate neutrality objective, is on the Union list, and falls under one of the infrastructure categories for electricity set out in points (1)(a), (c), (d), (g) or (h) of Annex II, and links the Union electricity system with the electricity grid of a third country, or has a significant cross-border impact in accordance with point (2)(a) of Annex IV, falls under one of the infrastructure categories for hydrogen set out in point (2) of Annex II, or falls under one of the infrastructure categories for CO2 set out in points (4)(a) or (c) of that Annex;

(7) ‘competing projects’ means projects that fully or partially address the same identified infrastructure need;

(8) ‘project promoter’ means one of the following:

(a) a transmission system operator (TSO), a distribution system operator (DSO), a hydrogen network operator (HNO) or another operator or investor developing a project on the Union list;

(b) in the case of more than one such TSO, DSO, HNO, other operator or investor, or any group thereof, the entity with legal personality under the applicable national law which has been designated by contractual arrangement between them and which has the capacity to undertake legal obligations and assume financial liability on behalf of the parties to the contractual arrangement;

(9) ‘smart electricity grid’ means an electricity network, including on islands that are not interconnected or not sufficiently connected to the trans-European energy networks, that enables cost-efficient integration and active participation of all users connected to it, including generators, consumers and prosumers, energy storage facilities, flexibility resources and aggregators in order to ensure an economically efficient and sustainable power system with grid optimisation, low losses and a high level of integration of low-carbon and renewable sources, of security of supply and of safety, and in which the grid operator can digitally monitor, control and optimise system-relevant parameters associated with the users connected to it, and make use of Union-wide harmonised, interoperable, secure and cyber-resilient information and communication technologies for communicating with related grid operators, generators, energy storage facilities, and consumers or prosumers, and flexibility providers and aggregators with a view to transmitting and distributing electricity in a sustainable, cost-efficient and secure way;

(10) ‘national regulatory authority’ means a national regulatory authority designated in accordance with Article 76(1) of Directive (EU) 2024/1788 or a regulatory authority at national level designated in accordance with Article 57 of Directive (EU) 2019/944;

(11) ‘relevant national regulatory authority’ means the national regulatory authority in the Member States hosting the projects and in Member States to which the project provides a significant positive impact;

(12) ‘authority concerned’ means an authority that, under national law, is competent to issue various permits and authorisations related to the planning, design and construction of immovable assets necessary to complete a project of common interest or a project of mutual interest, including energy infrastructure in itself, and the authority competent to issue permits and authorisations related to the works necessary to complete the project;

(13) ‘works’ means the purchase, supply and deployment of components, systems and services including software, the carrying out of development, repurposing and construction and installation activities relating to a project, the acceptance of installations and the launching of a project;

(14) ‘studies’ means activities required to prepare project implementation, such as preparatory, feasibility, evaluation, testing and validation studies, including software, and any other technical support measure including prior action to define and develop a project and decide on its financing, such as reconnaissance of the sites concerned and preparation of the financial package;

(15) ‘commissioning’ means the process of bringing a project into operation once it has been constructed;

(16) ‘dedicated hydrogen assets’ means hydrogen infrastructure designed for the exclusive use or transport of pure hydrogen without the need for any further adaptation works, including pipeline networks or storage facilities that are newly constructed, repurposed from natural gas assets, or both;

(17) ‘repurposing’ means the technical upgrading or modification of existing natural gas infrastructure in order to ensure that it is dedicated to the exclusive use of hydrogen or transport, management and storage of CO2, excluding any mixed or dual use with natural gas or other fossil fuels;

(18) ‘climate adaptation’ means a process that ensures that resilience to the potential adverse impacts of climate change of energy infrastructure is achieved through a climate vulnerability and risk assessment, including through relevant adaptation measures such as predictive, preventive and anticipatory measures against climate-related risks;

(18a) ‘interconnector transmission system operator’ means a transmission system operator whose transmission system consists predominantly of one or more interconnectors and who is responsible for the operation, maintenance and development of interconnectors, but is not responsible for the operation of a transmission system in a load frequency control area;

(19) ‘non-wire solutions’ means investments in the energy infrastructure in electricity, which can increase the available grid capacity or improve, or optimise the efficiency of grid operation, including through grid enhancing technologies, digital and automated solutions, dynamic line rating, advanced power-flow control, voltage regulation, digital monitoring and automation, system-level measurement and topology optimisation, in order to defer or remove the need to construct or upgrade components of a transmission or distribution system;

(19a) ‘grid enhancing technologies’ means innovative wire and innovative non-wire solutions that use advanced materials, digital technologies supporting advanced grid operation digitalisation, high-resolution measurement, or novel system design to add or materially increase electricity network capacity more efficiently and sustainably than traditional grid infrastructure;

(19b) ‘innovative wire solutions’ means advanced and high-performance conductors or conductor coatings which deliver materially higher power transfer capability and higher efficiency than conventional grid conductors, including carbon-fibre composite overhead lines, superconducting cables, capacitive transfer cables, and other novel line or cable technologies that utilise advanced materials;

(19c) ‘innovative non-wire solutions’ means innovative solutions based on digitalised assets which are deployed to increase the available grid capacity or improve the efficiency of grid operation, including dynamic line rating, advanced power-flow control, voltage regulation, digital monitoring and automation, system-level measurement, topology optimisation, and flexibility-enabling technologies, which actively manage network constraints using real-time data and control;

(19d) ‘system efficiency’ means ‘system efficiency’ as defined in Article 2, point (4), of Directive (EU) 2023/1791 of the European Parliament and of the Council.

CHAPTER II

Projects of common interest and projects of mutual interest

Article 3 Union list of projects of common interest and projects of mutual interest

1. Regional groups (‘Groups’) shall be established in accordance with the process set out in Section 1 of Annex III. The membership of each Group shall be based on each priority corridor and area and their respective geographical coverage as set out in Annex I. The Groups can merge or meet in different configurations as necessary. The cross-regional meeting configuration of all Groups shall be the TEN-E Group. Decision-making power in the Groups shall be restricted to Member States and the Commission (together referred to as ‘the decision-making body’) and shall be based on consensus.

2. The TEN-E Group shall adopt rules of procedure, having regard to the provisions set out in Annex III. Those rules of procedure shall apply to all Groups.

3. The decision-making body of each Group shall adopt a regional list of projects drawn up in accordance with: the process set out in Section 2 of Annex III; the contribution of each project to implementing the energy infrastructure priority corridors and areas set out in Annex I; and their fulfilment of the criteria set out in Article 4.

Where the decision-making body of a Group draws up its regional list:

(a) each individual proposal for a project shall require the approval of the Member States to whose territory the project relates; where a Member State does not give its approval, it shall present its substantiated reasons to the decision-making body;

(b) it shall take into account advice from the Commission with the aim of having a manageable total number of projects on the Union list.

4. The Commission is empowered to adopt delegated acts in accordance with Article 23 to supplement this Regulation by establishing the Union list, subject to Article 172, second paragraph, of the Treaty.

The Union list shall be established every two years, on the basis of the regional lists adopted by the decision-making bodies of the Groups established pursuant to Section 1, point (1), of Annex III, following the procedure set out in paragraph 3 of this Article.

The Commission shall adopt the delegated act establishing the first Union list pursuant to this Regulation by 30 November 2029.

If a delegated act adopted by the Commission pursuant to this paragraph cannot enter into force due to an objection expressed either by the European Parliament or the Council pursuant to Article 23(6), the Commission shall immediately convene the Groups in order to draw up new regional lists taking into account the reasons for the objection. The Commission shall adopt a new delegated act establishing the Union list as soon as possible.

5. When establishing the Union list by combining the regional lists referred to in paragraph 3, the Commission shall, taking due account of the deliberations of the Groups:

(a) ensure that only projects that fulfil the criteria referred to in Article 4 are included;

(b) ensure cross-regional consistency;

(c) take into account the opinions of Member States referred to in Section 2, point (10), of Annex III;

(d) aim to ensure a manageable total number of projects on the Union list.

6. Projects of common interest and projects of mutual interest that fall under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (f) and (h) of Annex II, as relevant, shall become an integral part of the relevant regional investment plans adopted in accordance with Article 34 of Regulation (EU) 2019/943 and of the relevant national ten-year network development plans adopted in accordance with Article 51 of Directive (EU) 2019/944, National Energy and Climate Plans adopted in accordance with Article 3 of Regulation (EU) 2018/1999, and other national infrastructure plans, as appropriate. Projects of common interest and projects of mutual interest that fall under the energy infrastructure categories set out in point (2) of Annex II ,as relevant, shall become an integral part of the ten-year network development plan for hydrogen under Article 55 of Directive (EU) 2024/1788 and other national infrastructure plans, as appropriate. Those projects of common interest and projects of mutual interest shall be conferred the highest possible priority within each of those national plans. This paragraph shall not apply to competing projects or projects that have not reached a sufficient degree of maturity to provide a project-specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III.

7. Projects of common interest and projects of mutual interest that fall under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (f) and (h) and point (2) of Annex II, as relevant, and that are competing projects or projects that have not reached a sufficient degree of maturity to provide a project-specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III may be included in the relevant regional investment plans, the national ten-year network development plans and other national infrastructure plans, as appropriate, as projects under consideration.

Article 4 Criteria for the assessment of projects by the Groups

1. A project of common interest shall meet the following general criteria:

(a) the project is necessary for at least one of the energy infrastructure priority corridors and areas set out in Annex I;

(aa) the project contributes significantly to the objectives referred to in Article 1(1) and to sustainability, including through the integration of renewable and low carbon energy into the grid and the transmission and distribution of renewable and low-carbon generation to major consumption centres and storage sites, and is aligned with the principle of ‘energy efficiency first’;

(b) the potential overall benefits of the project, assessed in accordance with the relevant specific criteria in paragraph 3, outweigh its costs, including in the longer term;

(c) the project meets any of the following criteria:

(i) it involves at least two Member States by directly or indirectly, via interconnection with a third country, crossing the border of two or more Member States;

(ii) it is located in the territory of one Member State, either inland or offshore, including islands, and has a significant cross-border impact as set out in point (1) of Annex IV.

(iia) has a sufficient level of technological maturity or is supported by credible evidence of current or expected future demand for the energy vector concerned in the Union market.

By way of derogation from point (c) of the first subparagraph of this paragraph, where studies, demonstration or pilot projects are involved, the project meets the following criteria:

(i) it involves network operators of at least two different Member States, or from one Member State and a third country of the Energy Community contracting party or of the EEA;

(ii) it demonstrates that it is replicable in other Member States and that it brings added value for other network operators of the Union, as set out in Annex IV.

2. A project of mutual interest shall meet all of the following general criteria:

(a) the project contributes significantly to the objectives referred to in Article 1(1), and those of the third country, in particular by not hindering the capacity of the third country to phase out fossil fuel generation assets for its domestic consumption, and to sustainability;

(b) the potential overall benefits of the project, assessed in accordance with the relevant specific criteria in paragraph 3, for the Union, or cumulatively for the Union and the Energy Community contracting party or the EEA country directly involved in the project, outweigh its costs for the Union, or cumulatively for the Union and the Energy Community contracting party or EEA country, as relevant, including in the longer term;

(ba) the project has a sufficient level of technological maturity, or is supported by credible evidence of current or expected future demand and offer for the energy vector concerned in the Union market;

(c) the project connects directly the territory of at least one Member State with the territory of a third country by connecting directly the relevant Member State with the first connection point in the electricity network of the third country or the first hydrogen or CO2 connection point in the third country, and has a significant cross-border impact as set out in point (2) of Annex IV;

(d) for the part of the project located in Member State territory, the project is in accordance with Directives (EU) 2019/944 and (EU) 2024/1788 where it falls within the infrastructure categories set out in points (1) and (2) of Annex II to this Regulation;

(e) there is a high level of convergence of the policy framework of the third country involved and legal enforcement mechanisms are demonstrated in order to support the policy objectives of the Union, in particular to ensure:

(i) the well-functioning of the internal energy market in the Union;

(ii) network security, including cybersecurity, and security of supply in the Union based, inter alia, on diverse sources, cooperation and solidarity;

(iii) an energy system, including production, transmission and distribution, moving towards the objective of climate neutrality, in accordance with the Paris Agreement and the Union’s targets for energy and climate and its 2050 climate neutrality objective, in particular, avoiding carbon leakage;

(f) the third country involved supports the priority status of the project, as set out in Article 7, and other investments in the third country necessary for the benefits of the project to materialise as referred to in point (b) of this paragraph, and commits explicitly to complying with a similar timeline for accelerated implementation and other policy and regulatory support measures as applied to projects of common interest in the Union.

As regards projects for the storage of carbon dioxide falling under the energy infrastructure category set out in point (4)(c) of Annex II, the project shall be necessary to allow the cross-border transport and storage of carbon dioxide and the third country where the project is located shall have an adequate legal framework based on demonstrated effective enforcement mechanisms to ensure that standards and safeguards apply to the project, which prevent any carbon dioxide leaks. In relation to climate, human health and ecosystems, the safety and effectiveness of the permanent storage of carbon-dioxide shall be ensured, and shall at least attain the same level as those provided by Union law.

As regards energy storage projects falling under the energy infrastructure category set out in Annex II, point (1)(c), the assessment shall be carried out on the basis of cost-benefit analysis methodologies consistent with those applicable to transmission projects. Such methodologies shall include, where relevant, indicators relating to flexibility, resource adequacy, reduction of renewable energy source curtailment, system resilience, and alleviation of cross-border congestion.

3. The following specific criteria shall apply to projects of common interest and projects of mutual interest, as relevant, falling within specific energy infrastructure categories:

(a) for electricity transmission, distribution and storage projects falling under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (f) and (h) of Annex II, the project contributes significantly to sustainability through the integration of renewable and/or other low-carbon energy sources into the grid, the transmission or distribution of renewable generation to major consumption centres and storage sites, and to reducing energy curtailment, where applicable, and contributes to at least one of the following specific criteria:

(i) market integration, including through lifting the energy isolation of at least one Member State, including where a Member State is an island Member State, peripheral or not sufficiently interconnected, and reducing energy infrastructure bottlenecks, competition, interoperability and system flexibility, including by enabling the efficient use of existing and future interconnection capacity and by contributing to the reduction of structural price divergences between electricity bidding zones across the Union;

(ii) security of supply, including through interoperability, system flexibility supported by diversified and decentralised energy sources, cybersecurity, appropriate connections and secure and reliable system operation;

(b) for smart electricity grid projects falling under the energy infrastructure category set out in point (1)(g) of Annex II, the project contributes significantly to sustainability through the integration of renewable and low-carbon energy into the grid, and contributes to at least two of the following specific criteria:

(i) security of supply, including through efficiency and interoperability of electricity transmission and distribution in day-to-day network operation, avoidance of congestion, and integration and involvement of network users;

(ii) market integration, including through efficient system operation and use of interconnectors;

(iii) network security, flexibility and quality of supply, including through higher uptake of innovation in balancing, flexibility markets, cybersecurity, monitoring, system control and error correction, while ensuring that digital and physical solutions used for the project comply with applicable Union law and relevant Union cybersecurity, resilience and security-of-supply frameworks, including requirements concerning risk management, supply-chain security, data protection, the assessment of risks linked to providers and jurisdictions of origin, and the protection of the Union’s essential security interests, and with the Union’s climate and environmental requirements and objectives;

(iv) smart sector integration, either in the energy system through linking various energy carriers and sectors, demand response, energy storage, grid-supportive cogeneration, or non-fossil flexibility or in a wider way, favouring synergies and coordination between the energy, transport and telecommunication sectors;

(iv a) climate resilience of the electricity network, including through predictive, preventive and anticipatory measures against climate-related risks, supported by digital and data-driven solutions, and enabling the ex-ante approval of investments based on forward-looking risk assessments;

(iv b) climate adaptation of the network;

(c) for projects falling under the infrastructure category set out in point (1)(e) and (f) of Annex II, the project contributes to the following specific criteria:

(i) security of supply, including by protecting assets from risks and contributing to the measures identified pursuant Articles 7 and 11 of Regulation (EU) 2019/941 on risk-preparedness in the electricity sector;

(ii) network security, including through measures facilitating a higher degree of physical security and cybersecurity, monitoring, and system control;

(d) for carbon dioxide transport and storage projects falling under the energy infrastructure categories set out in point (4) of Annex II, the project contributes significantly to sustainability through the reduction of carbon dioxide emissions in the connected industrial installations and contributes to all of the following specific criteria:

(i) avoiding carbon dioxide emissions while maintaining security of supply;

(ii) increasing the resilience, efficiency and security of transport and storage of carbon dioxide;

(iii) the efficient use of resources, by enabling the connection of multiple carbon dioxide sources and storage sites via common infrastructure and minimising environmental burden and risks;

(e) for hydrogen projects falling under the energy infrastructure categories set out in point (2) of Annex II, the project contributes significantly to sustainability, including by reducing greenhouse gas emissions, by enhancing the deployment of renewable or low carbon hydrogen, with an emphasis on hydrogen from renewable sources in particular in end-use applications, such as hard-to-abate sectors, in which more energy efficient solutions are not feasible, and supporting variable renewable power generation by offering non-fossil flexibility, storage solutions, or both, and the project contributes significantly to at least one of the following specific criteria:

(i) market integration, including by connecting existing or emerging hydrogen networks of Member States, or otherwise contributing to the emergence of an Union-wide network for the transport and storage of hydrogen, and ensuring interoperability of connected systems;

(ii) increase the resilience, security of supply and flexibility, including through appropriate connections and facilitating secure and reliable system operation;

(iii) competition, including by allowing access to multiple supply sources and network users on a transparent and non-discriminatory basis;

(f) for electrolysers falling under the energy infrastructure category set out in point (3) of Annex II, the project contributes significantly to all of the following specific criteria:

(i) sustainability, including by reducing greenhouse gas emissions and enhancing the deployment of renewable or low-carbon hydrogen in particular from renewable sources, as well as synthetic fuels of those origins;

(ii) security of supply, including by contributing to secure, efficient and reliable system operation, or by offering storage, flexibility solutions, or both, such as demand side response and balancing services;

(iii) enabling flexibility services such as demand response and storage by facilitating smart energy sector integration through the creation of links to other energy carriers and sectors.

4. For projects falling under the energy infrastructure categories set out in Annex II, the criteria set out in paragraph 3 of this Article shall be assessed in accordance with the indicators set out in points (3) to (8) of Annex IV.

5. In order to facilitate the assessment of all projects that could be eligible as projects of common interest and that could be included in a regional list, each Group shall assess each project’s contribution to the implementation of the same energy infrastructure priority corridor or area in a transparent and objective manner. Each Group shall determine its assessment method on the basis of the aggregated contribution to the criteria referred to in paragraph 3. That assessment shall lead to a ranking of projects for internal use of the Group. Neither the regional list nor the Union list shall contain any ranking, nor shall the ranking be used for any subsequent purpose except as referred to in Section 2, point (15), of Annex III.

In assessing projects, in order to ensure a consistent assessment approach among the Groups, each Group shall give due consideration to:

(a) the urgency and the contribution of each proposed project in order to meet the Union’s targets for energy and climate and its 2050 climate neutrality objective, market integration, competition, sustainability, and security of supply;

(b) the complementarity of each proposed project with other proposed projects, including competing or potentially competing projects;

(c) possible synergies with priority corridors and thematic areas identified under trans-European networks for transport and telecommunications;

(d) for proposed projects that are, at the time of the assessment, projects on the Union list, the progress of their implementation and their compliance with the reporting and transparency obligations provided by this Regulation;

(e) any third country direct or indirect ownership as beneficiary, shareholder or ultimate beneficiary as project promoter in any of the proposed projects.

As regards smart electricity grids falling under the energy infrastructure category set

out in point (1)(g) of Annex II, and for projects falling under the energy

infrastructure categories set out in point (1)(e) of Annex II, ranking shall be carried

out for those projects that affect the same two Member States, and due consideration

shall also be given to the number of users affected by the project, the annual energy

consumption and the share of generation from non-dispatchable resources in the area

covered by those users.

As regards proposed projects referred to in point (d) of the second subparagraph,

projects that are, at the time of the assessment, projects on the Union list for longer

than 10 years shall be assessed as outdated.

5a. In order to facilitate the assessment of all projects that could be eligible as projects of common interest and projects of mutual interest, and that could be included in a regional list, each Group shall indicate how each project addresses a demonstrated infrastructure capacity need identified in the infrastructure needs identification reports pursuant to Article 12, or, where no such need is identified, why it is otherwise justified that it be included in the list.

Article 5 Implementation and monitoring of projects on the Union list

1. Project promoters shall draw up an implementation plan for projects on the Union list within two months of their inclusion on the Union list, with a timetable including all of the following:

(a) feasibility and design studies including risk assessment studies as regards climate adaptation and physical and cyber security, building on the requirements of Directives (EU) 2022/2557 and (EU) 2022/2555, where applicable, as well as compliance with environmental legislation, and with the ‘do no significant harm’ principle;

(b) approval by the national regulatory authority or by any other authority concerned;

(c) construction and commissioning;

(d) the permit-granting process referred to in Article 10(9), point (c).

2. TSOs, DSOs, HNOs and other operators shall cooperate with each other in order to facilitate the development of projects on the Union list in their area.

3. The Agency for the Cooperation of Energy Regulators (‘the Agency’) and the Groups concerned shall monitor the progress achieved in implementing the projects on the Union list. If a project of common interest encounters significant difficulties or is blocked for a long period of time, the Groups may appoint a High-Level Group to identify and assess barriers to the implementation of the project and work towards resolving them. The High-Level Groups shall comprise a Steering Group, composed of representatives of the Commission, Member States, NRAs and TSOs of the Member States concerned. The Groups and, where applicable, the relevant High-Level Group, may request additional information in accordance with paragraphs 4, 5 and 6, convene meetings with the relevant parties and invite the Commission to verify the information provided on site.

4. By 31 October of the year in which the Union list where the project is included enters into force and starts to produce effects, and every subsequent year, project promoters shall submit a progress report for each project of common interest and project of mutual interest they promote, to the Agency, national competent authority referred to in Article 8(1) and Regional group.

That progress report shall include details of:

(a) the progress achieved in the development, construction and commissioning of the project as set out in the implementation plan referred to in paragraph 1 of this Article, in particular with regard to the permit-granting process and the consultation procedure, as well as compliance with environmental legislation, with the principle that the project does ‘no significant harm’ to the environment, climate adaptation measures taken, and mitigation measures taken resulting from the risks assessed as regards the project under Article 5(1), point (a), where relevant and building on the requirements of Directives (EU) 2022/2557 and (EU) 2022/2555 where applicable;

(b) where relevant, delays compared to the implementation plan, the reasons for such delays and other difficulties encountered;

(c) where relevant, a revised implementation plan aiming to overcome the delays.

5. By 31 December of each year following the submission by the project promoter of the progress report referred in paragraph 4 of this Article, the competent authorities referred to in Article 8(1) shall submit to the Agency and to the relevant Group, and, where applicable, to the relevant High-Level Group, the report referred to in paragraph 4 of this Article supplemented with information on the progress and, where relevant, on delays in the implementation and permit-granting processes of projects on the Union list located in their respective territory, including the reasons for such delays. The contribution of competent authorities to the progress report shall be clearly marked and drafted without modifying the text of the progress report provided by project promoters.

6. By 31 March of each year in which a new Union list should be adopted, the Agency shall submit to the Groups a consolidated report for the projects on the Union list that are subject to the competence of national regulatory authorities, evaluating the progress achieved and expected changes in project costs, and, where appropriate, make recommendations on how to overcome the delays and difficulties encountered. That consolidated report shall also evaluate the implementation of Article 3(6) and (7) as regards projects of common interest and projects of mutual interest.

In duly justified cases, the Agency may request additional information from competent authorities necessary for carrying out its tasks set out in this paragraph.

7. Where the commissioning of a project on the Union list is delayed when compared to the implementation plan, other than for overriding reasons beyond the control of the project promoter, the following measures shall apply:

(a) in so far as measures referred to in Article 55(7), points (a), (b) or (c), of Directive (EU) 2024/1788 and Article 51(7), points (a), (b) or (c), of Directive (EU) 2019/944 are applicable in accordance with respective national law, national regulatory authorities shall ensure that the investment is carried out;

(b) where the measures of national regulatory authorities pursuant to point (a) of this paragraph are not applicable, the project promoter shall, within 12 months of the date of commissioning set out in the implementation plan, choose a third party to finance or construct all or part of the project;

(c) where a third party is not chosen in accordance with point (b), the Member State or, where the Member State has so provided, the national regulatory authority may, within two months of the expiry of the period referred to in point (b), designate a third party to finance or construct the project which the project promoter shall accept;

(d) where the delay compared to the date of commissioning in the implementation plan exceeds 26 months, the Commission, subject to the agreement and with the full cooperation of the Member States concerned, may launch a call for proposals open to any third party capable of becoming a project promoter to build the project in accordance with an agreed timetable;

(e) where measures referred to in point (c) or (d) are applied, the system operator in whose area the investment is located shall: provide the implementing operators or investors or third party with all the information required to realise the investment; connect new assets to the transmission network; or, where applicable, the distribution network and shall generally make its best efforts to facilitate the implementation of the investment and the secure, reliable and efficient operation and maintenance of the project on the Union list.

8. A project on the Union list may be removed from the Union list in accordance with the procedure set out in Article 3(4) if its inclusion in that list was based on incorrect information which was a determining factor for that inclusion, or the project does not comply with Union law or if the project promoter has failed, within the period established under Regulation (EU) 2019/881, to implement the cybersecurity requirements set out in that Regulation.

8a. Any changes in the ownership, control or governance of the project promoter or project company that may affect control, influence or decision-making rights shall be notified without delay to the competent national authorities and to the Commission.

9. Projects which are no longer on the Union list shall lose all rights and obligations linked to the status of project of common interest or project of mutual interest provided for in this Regulation.

However, a project which is no longer on the Union list but for which an application file has been accepted for examination by the competent authority shall maintain the rights and obligations laid down in Chapter III, except where the project has been removed from the Union list for the reasons set out in paragraph 8 of this Article.

10. This Article shall be without prejudice to any Union financial assistance granted to any project on the Union list prior to its removal from the Union list.

Article 6 European coordinators

1. Where a project of common interest or a project of mutual interest encounters significant implementation difficulties, the Commission may designate, in agreement with the Member States concerned, a European coordinator for a period of up to one year, renewable twice.

2. The European coordinator shall:

(a) promote the projects, for which they have been designated as a European coordinator, and the cross-border dialogue between the project promoters and all stakeholders concerned including relevant competent national authorities and, in the case of projects of mutual interest, the third countries concerned;

(b) assist and coordinate all parties as necessary in consulting the stakeholders concerned, discussing alternative routing, where appropriate, and obtaining necessary permits for the projects;

(ba) where appropriate, assist the parties in reaching an agreement regarding the cross-border cost-allocation based on a common cost-benefit analysis; the European coordinator may invite non-hosting countries to participate in the conversations where relevant if the conditions on benefit estimation allocation pursuant to Article 17(7) are fulfilled;

(c) where appropriate, advise project promoters on the financing of the project;

(d) ensure that appropriate support and strategic direction by the Member States concerned are provided for the preparation and implementation of the projects;

(e) starting from the date of their designation submit every year, and, where appropriate, upon completion of their mandate, a report to the Commission on the progress of the projects and on any difficulties and obstacles which are likely to significantly delay the commissioning date of the projects; where appropriate, the report shall make recommendations to overcome obstacles and difficulties; the Member States concerned shall be consulted in relation to those recommendations.

The Commission shall transmit the report of the European coordinator referred to in point (e) of the first subparagraph to the European Parliament and the Groups concerned.

3. The European coordinator shall be chosen following an open, non-discriminatory and transparent process and on the basis of a candidate’s experience with regard to the specific tasks they have been assigned for the projects concerned.

4. The decision designating the European coordinator shall specify the terms of reference, detailing the duration of the mandate, the specific tasks and corresponding deadlines, and the methodology to be followed. The coordination effort shall be proportionate to the complexity and estimated costs of the projects. The Commission shall provide the necessary secretarial assistance to the European Coordinator.

5. The Member States concerned shall fully cooperate with the European coordinator in the execution of the tasks referred to in paragraphs 2 and 4.

CHAPTER III

Permit-granting and public participation

Article 7 Priority status of projects on the Union list

1. The Union list shall establish, for the purposes of any decisions issued in the permit-granting process, the necessity of projects on the Union list from an energy policy and climate perspective, without prejudice to the exact location, routing or technology of the project.

The first subparagraph shall not apply to competing projects or to projects that have not reached a sufficient degree of maturity to provide a project specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III.

2. For the purpose of ensuring efficient administrative processing of the application files related to projects on the Union list, project promoters and all authorities concerned shall ensure that those files are treated in the most rapid way possible in accordance with Union and national law.

3. Projects on the Union list shall have the status of the highest national significance possible, where such a status exists in national law and be treated as such in the permit-granting process, including those relating to environmental assessments, in spatial planning, and in obtaining rights of way and expropriation of necessary land.

4. All dispute resolution procedures, litigation, appeals and judicial remedies related to projects on the Union list in front of any national courts, tribunals, panels, including mediation or arbitration, where they exist in national law, shall be treated as urgent, if and to the extent to which national law provides for such urgency procedures.

5. With regard to the environmental impacts addressed in Article 6(4) of Directive 92/43/EEC and Article 4(7) of Directive 2000/60/EC, provided that all the conditions set out in those Directives are fulfilled, projects on the Union list falling under the infrastructure categories referred to in points (2), (3), and (4) of Annex II to this Regulation shall be considered as being of public interest from an energy policy perspective, and may be considered as having an overriding public interest.

Where the opinion of the Commission is required in accordance with Article 6(4) of Directive 92/43/EEC, the Commission and the national competent authority referred to in Article 8 of this Regulation shall ensure that the decision with regard to the overriding public interest of a project is taken within the time limits set in Article 10(1) and (2) of this Regulation.

The first and second subparagraphs shall not apply to competing projects or to projects that have not reached a sufficient degree of maturity to provide a project specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III.

6. Until climate neutrality is achieved at Union level, in the permit-granting procedure, the planning, construction and operation of projects falling within the infrastructure category referred to in Annex II point (1), including the refurbishment, modernisation and repowering of existing grid infrastructure, fall under the provision of Article 8(8) of Directive (EU) 2019/944 and are presumed as being in the overriding public interest and serving public health and safety when balancing legal interests in individual cases for the purposes of Article 6(4) and Article 16(1), point (c), of Directive 92/43/EEC, Article 4(7) of Directive 2000/60/EC and Article 9(1), point (a), of Directive 2009/147/EC, Directive 2008/56/EC, in particular Article 14(1) point (d), thereof and Regulation (EU) 2024/1991, in particular Article 4(14) and (15), Article 5(11) and (12) and Article 6(1) thereof.

Member States shall ensure that, in the planning and permit-granting process, the construction and operation of projects falling under the infrastructure category referred to in point (1) of Annex II are given priority when balancing legal interests in individual cases for other purposes than the ones referred in the first subparagraph with the exception of cultural heritage on the basis of legal criteria to ensure harmonized implementation. The first subparagraph shall not apply to competing projects or to projects that have not reached a sufficient degree of maturity to provide a project specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III.

6a. Until climate neutrality is achieved, Member States shall ensure that, in the permit-granting procedure, the planning, construction and operation, refurbishment, modernisation, hybridisation, repowering of plants and installations for the production of energy from renewable sources, and their connection to the grid, including the injection of biomethane into to the closest existing grid connection point, the related grid itself, storage assets and recharging stations and recharging pools are presumed as being in the overriding public interest and serving public health and safety. In such cases, those projects shall be given priority when balancing legal interests other than those referred to in paragraph 6.

Member States may exclude the application of the presumption referred to in the first subparagraph only in duly justified cases where this is strictly necessary and proportionate for the purpose of protecting formally designated cultural heritage. Any such exclusion shall be based on clear, objective and proportionate legal criteria and shall not go beyond what is necessary to protect cultural heritage.

7. Until climate neutrality is achieved at Union level, with regard to projects on the Union list falling under the infrastructure categories referred to in point (1) of Annex II to this Regulation which are expressly included in a National Development Plan that has been subject to a strategic environmental assessment in accordance with Directive 2001/42, and, where it is likely to have a significant impact on Natura 2000 sites, to the appropriate assessment pursuant to Article 6(3) of Directive 92/43/EEC, Member States may, insofar as the project complies with and does not go beyond the framework of the assessed National Development Plan:

(a) exempt those projects from the environmental impact assessment under Article 2(1) of Directive 2011/92/EU, and

(b) exempt those projects from an assessment of their implications for Natura 2000 sites pursuant to Article 6(3) of Directive 92/43/EEC and from the assessment of their implications on species protection pursuant to Article 12(1) of Directive 92/43/EEC and to Article 5 of Directive 2009/147/EC.

For projects located in, or crossing, Natura 2000 sites and areas designated under national protection schemes for nature and biodiversity conservation, the exemptions referred to in the first subparagraph shall only be applicable in case there are no proportionate alternatives for their deployment, taking into account the objectives of the site. Projects referred to in Annex II point 1(c) shall exclude Natura 2000 sites and areas designated under national protection schemes.

8. Where Member States apply the exemptions under paragraph 7, they shall ensure that rules on effective mitigation measures to be adopted for the projects on the Union list falling under the infrastructure categories referred to in Annex II point (1) are identified based on the National Development Plan, in order to avoid the adverse environmental impact that may arise or, where that is not possible, to significantly mitigate it. Member States shall ensure that the appropriate mitigation measures are applied in a timely manner to ensure compliance with the obligations laid down in Article 6(2) of Directive 92/43/EEC and Article 4(1), point (a)(i), of Directive 2000/60/EC of the European Parliament and of the Council and to avoid deterioration and achieve good ecological status or good ecological potential in accordance with Article 4(1), point (a), of Directive 2000/60/EC.

Compliance with the rules referred to in the first subparagraph of this paragraph and the implementation of the appropriate mitigation measures by the individual projects shall result in the presumption that projects are not in breach of the provisions mentioned in that subparagraph, without prejudice to paragraph 10 of this Article.

9. Member States shall ensure public participation regarding the National Development Plan in accordance with Articles 6 and 7 of Directive 2001/42/EC, including identifying the public affected or likely to be affected as well as the Member States that may be affected by the implementation of that Plan and the projects on the Union list falling under the infrastructure categories referred to in point (1) of Annex II to this Regulation included in that Plan.

10. For projects for which Member States decide to apply exemptions under paragraph 7, the competent authorities shall carry out a screening to identify:

(a) if the project is likely to give rise to significant adverse effects, which were not identified during the environmental assessment of the National Development Plan carried out pursuant to Directive 2001/42/EC and, where relevant, to Directive 92/43/EEC.

(b) if the project falls within the scope of Article 7 of Directive 2011/92/EU and Article 2 of the Convention on environmental impact assessment in a transboundary context due to its likelihood of significant effects on the environment in another Member State or due to the request of a Member State which is likely to be significantly affected.

This screening referred to in the first subparagraph shall be finalised within 45 days from the notification of the project promoter referred to in paragraph 5 of Article 10.

11. Where a project on the territory of a Member State is likely to have significant effects on the environment of other Member States, the Member State where the project is located shall ensure the application of Article 7 of Directive 2011/92/EU and Articles 2 to 7 of the Convention on environmental impact assessment in a transboundary context.

12. Where the screening process identifies a project to be highly likely to give rise to significant unforeseen adverse effects as referred to in paragraph 10 of this Article, the competent authorities shall inform the project promoter that assessments referred to in points (a) and (b) of paragraph 7 of this Article are required and ensure that on the basis of existing data, appropriate and proportionate mitigation measures are applied for these projects to ensure compliance with Articles 12(1) of Directive 92/43/EEC and Article 5 of Directive 2009/147/EC. Where it is not possible to apply such mitigation measures, the competent authorities shall ensure that project promoters adopt appropriate compensatory measures to address those effects, which, if other proportionate compensatory measures are not available, may take the form of a monetary compensation for species protection programmes, in order to secure or improve the conservation status of the species affected.

13. When assessing whether satisfactory alternative solutions to projects on the Union list falling under the infrastructure categories referred to in points (2), (3) and (4) of Annex II to this Regulation, exist for the purposes of Articles 6(4) and Article 16(1) of Directive 92/43/EEC, Article 4(7), point (d), of Directive 2000/60/EC and Article 9(1) of Directive 2009/147/EC, the condition of having no satisfactory alternatives shall be fulfilled if there are no satisfactory alternative solutions capable of achieving the same objective of the project in question, in terms of the development of the same capacity through the same technology within the same or similar timeframe and without resulting in significantly higher costs.

14. When implementing compensatory measures for projects on the Union list falling under the infrastructure categories referred to in points (2), (3) and (4) of Annex II to this Regulation for the purpose of Article 6(4) of Directive 92/43/EEC, Member States may, in justified cases and where it can be reasonably demonstrated that the plan or project would not irreversibly affect the ecological processes essential for maintaining the structure and functions of the site and would compromise the overall coherence of the Natura 2000 network before compensatory measures are put into place, allow for such compensatory measures to be carried out in parallel with the implementation of the project. Member States may allow, in accordance with the precautionary principle, for those compensatory measures to be adapted over time, depending on whether the significant negative effects are expected to arise in the short, medium or long term.

15. Regarding the assessment, satisfactory alternative solutions to projects falling under the infrastructure category referred to in point (1) of Annex II to this Regulation and the implementation of compensatory measures for those projects, Article 8a of Directive (EU) 2019/944 shall apply.

Article 8 Organisation of the permit-granting process

1. Each Member State shall ensure that one single national competent authority is responsible for:

(a) acting as the sole point of contact for project promoters in the permit-granting process, replying to their queries, mediating all contacts with the authorities concerned and support them with knowledge and information aiming at the fastest process possible;

(b) receiving permitting-granting applications from promoters of projects on the Union list and all relevant documents in electronic form and disseminating them across authorities concerned;

(c) facilitating and coordinating the permit-granting process of projects on the Union list in their territory with other authorities concerned, determining in cooperation with them, what authorisations, permits and assessments are required to complete the permit-granting process and reach a comprehensive decision in accordance with paragraph 3. This includes the scope and level of detail of the studies, assessment and documentation that project promoters are expected to produce;

(d) cooperating and communicating with national competent authorities of other Member States to facilitate and coordinate the permit-granting process for projects on the Union list in their territory, and permitting authorities in third countries as regards projects of mutual interest, including: aligning public consultations for cross-border projects, in accordance with Article 9(5); sharing information on likely significant transboundary impacts, in accordance with Article 9(6); aligning the timeline and requirements for studies, permits or authorisations to be conducted; and, organising the pre-application procedure in accordance with Article 10(9);

(e) monitoring the development and delays of projects on the Union list within their territory of responsibility, including by receiving and approving reports submitted by project promoters in accordance with Article 5(4) and reporting to the Agency and relevant Groups on the development and delays of projects on the union list located in their territory in accordance with Article 5(5).

In case of update to, or changes of, the designated national competent authority,

Member States shall notify the Commission as soon as the change is decided and

inform when such changes produce effects.

2. The responsibilities of the national competent authority referred to in paragraph 1 and the tasks related to it may be delegated to another authority, per project on the Union list or per particular category of projects on the Union list, or per geographical area, provided that:

(a) the national competent authority notifies the Commission of that delegation and the information therein is made easily available to the public including on the website referred to in Article 9(7);

(b) only one authority is responsible per project, or category of projects, on the Union list, and it is the sole point of contact for the project promoters, taking upon all responsibilities in the process leading to the comprehensive decision within the legal deadline provided in Article 10(2) and coordinates the submission of all relevant documents and information including to any other authority concerned;

(c) irrespective of the delegation, the national competent authority remains responsible to aggregate the reports submitted by project promoters in accordance with Article 5(4) and report to the Agency and relevant Groups in accordance with Article 5(5).

The national competent authority may also retain the responsibility to establish time

limits, without prejudice to the time limits set in Article 10(1) and (2).

3. The national competent authority shall ensure the issuing of the comprehensive decision within the time limits set out in Article 10(1) and (2).

Member States shall choose among the following schemes, taking into account which scheme is most effective in light of national law, national planning and permit-granting process specificities, and whether it can be implemented in a manner that contributes to the most efficient and timely issuing of the comprehensive decision:

(a) integrated scheme:

(i) the comprehensive decision shall be issued by the national competent authority and shall be the sole legally binding decision arising from the statutory permit-granting process;

(ii) where other authorities are concerned by the project, they may, in accordance with national law, give their opinion as input to the procedure, which shall be taken into account by the national competent authority;

(b) coordinated scheme:

(i) the comprehensive decision comprises multiple individual legally binding decisions issued by the several authorities concerned and is coordinated centrally by the national competent authority;

(ii) the national competent authority shall establish a working group where all authorities concerned are represented in order to draw up the screening or the detailed schedule for the permit-granting process in accordance with Article 10(9), point (b), and to monitor and coordinate its implementation;

(iii) the national competent authority shall, after consulting the other authorities concerned, establish on a case-by-case basis a reasonable time limit within which the individual decisions shall be issued with the aim to minimise the duration of the process without prejudice to time limits set out in Article 10(1) and (2) while ensuring that effective public participation is provided for within reasonable timeframes;

(iv) the national competent authority shall be able to take an individual decision on behalf of another authority concerned, where the decision by that authority is not delivered within the set time limit and where the delay cannot be adequately justified. The national competent authority may also disregard an individual decision of another authority concerned if it considers that the decision is not sufficiently substantiated with regard to the underlying evidence presented by that authority concerned;

(c) collaborative scheme:

(i) the comprehensive decision shall be comprised of multiple individual legally binding decisions issued by several authorities concerned and coordinated by the national competent authority;

(ii) the national competent authority shall establish a working group where all authorities concerned are represented in order to draw up the screening or the detailed schedule for the permit-granting process in accordance with Article 10(9), and to monitor and coordinate its implementation;

(iii) the national competent authority shall, after consulting the other authorities concerned, establish on a case-by-case basis a reasonable time limit, within which the individual decisions shall be issued with the aim to minimise the duration of the process, without prejudice to the time limits set in Article 10(1) and (2);

(iv) the national competent authority shall monitor compliance with the time limits by the authorities concerned and, in case of delays, shall take measures with the aim to minimise the duration of the process;

(v) where a Member State chooses the collaborative scheme, it shall inform the Commission of its reasons.

Authorities concerned shall, in accordance with the permitting scheme chosen by Member

States, either delegate the necessary competences to the national competent authority or

facilitate cooperation and collaboration with the national competent authority to ensure the

issuing of the comprehensive decision within the time limits set in Article 10(1) and (2).

Where an authority concerned does not expect to deliver an individual decision within the set

time limit, that authority shall immediately inform the national competent authority, providing

reasons for the delay. Subsequently, the national competent authority shall set another time

limit within which that individual decision shall be issued, in compliance with the overall time

limits set in Article 10(1) and (2).

4. Member States may apply the schemes set out in paragraph 3 to onshore and offshore projects on the Union list.

In the case of projects on the Union list that are intrinsically linked to generation assets, such as the projects included in the infrastructure categories provided by points (1)(b) or (h) of Annex II, the national competent authority shall be responsible for coordinating the permit-granting process of the respective project on the Union list with the permitting of the generation assets so that the timelines are cohesive and together aim at the most efficient and timely permitting of all assets related to the project.

5. Where a project on the Union list is located in the territory of two or more Member States, their respective national competent authorities shall jointly appoint one of them to act as a unique point of contact, responsible for facilitating the exchange of information between the national competent authorities and other authorities concerned on the permit-granting process, as well as, issuing the final ▌decisions in cooperation with the other national competent authorities concerned.

Member States shall endeavour to provide a joint procedure which facilitates the cooperation between their respective national competent authorities concerned, create procedural synergies and align timelines to facilitate the permit-granting process for projects, particularly with regard to the assessment of environmental impacts, and the public consultations required under Article 9.

Upon request from Member States, the Commission shall play the role of a facilitator to support cooperation between concerned national competent authorities. The Commission shall facilitate agreement on a unified joint procedure by providing an opinion and making recommendations on procedural aspects.

Article 9 Transparency and public participation

1. By 24 October 2027, the Member State or national competent authority shall, where necessary, in collaboration with other authorities concerned, publish an updated manual of procedures for the permit-granting process applicable to projects on the Union list to include at least the information specified in point (1) of Annex VI. The manual shall not be legally binding, but it shall refer to or quote relevant legal provisions. The manual shall be made available through a single digital portal or, where such a portal does not yet exist, through a single publicly accessible website. The national competent authorities shall, where relevant, cooperate and find synergies with the authorities of neighbouring countries with a view to align timelines and enhance administrative coordination and facilitate the permit-granting process for projects, including for the development of the manual of procedures.

2. Without prejudice to public participation requirements under environmental law, the Aarhus Convention, the Espoo Convention and relevant Union law, all parties involved in the permit-granting process shall follow the principles for public participation set out in point (3) of Annex VI.

3. The project promoter shall, within an indicative period of three months following the start of the permit-granting process pursuant to Article 10(5), draw up and submit a concept for public participation to the national competent authority, following the process outlined in the manual referred to in paragraph 1 of this Article and in accordance with the guidelines set out in Annex VI.

4. The national competent authority shall request modifications or approve the concept for public participation within three months of receipt of the concept, taking into consideration, without the need for repetition, of any form of public participation and consultation that took place before the start of the permit-granting process, to the extent that such public participation and consultation has fulfilled the requirements of this Article.

Where the project promoter intends to make significant changes to an approved concept for public participation, it shall inform the national competent authority thereof. In that case the national competent authority may request additional modifications.

5. Where it is not already required under national law, the project promoter shall carry out at least one early-stage public consultation, before the submission of the final and complete permitting application to the national competent authority pursuant to Article 10(10). The public consultation may be carried out in combination with any public consultation after submission of the request for development consent pursuant to Article 6(2) of Directive 2011/92/EU.

6. The public consultation required in the previous paragraph shall comply with the minimum requirements set out in point (5) of Annex VI and shall inform the stakeholders referred to in point (3)(a) of Annex VI about the project at an early stage and shall help to identify alternatives, the most suitable location, trajectory or technology, including, where relevant, in view of adequate climate change mitigation and adaptation and security considerations for the project, all impacts relevant under Union and national law, and the relevant issues to be addressed in the application file.

7. Without prejudice to the procedural and transparency rules in Member States, the project promoters shall publish on the website referred to in paragraph 10 a report summarising the results of activities related to public participation as regards the project including any activities pre-dating the early public consultation, and explaining how the opinions expressed in the public consultations were taken into account, showing the amendments made in the location, trajectory and design of the project, or providing reasons why such opinions have not been taken into account.

The project promoter shall submit the report together with the application file to the national competent authority. The comprehensive decision shall take due account of the result of this report and of the opinions expressed in the public consultations.

8. For cross-border projects involving two or more Member States, the public consultations carried out pursuant to paragraph 5 in each of the Member States concerned shall, to the extent possible, take place within a period of no more than two months from each other, and, where possible, be combined.

9. For projects likely to have a significant transboundary impact in one or more neighbouring Member States, to which Article 7 of Directive 2011/92/EU and the Espoo Convention are applicable, the relevant information shall be made available to the national competent authorities of the neighbouring Member States concerned. The national competent authorities of the neighbouring Member States concerned shall indicate, in the notification process where appropriate, whether they, or any other authority concerned, wishes to participate in the relevant public consultation procedures.

10. The project promoter shall establish and regularly update a dedicated project website with relevant information about the project of common interest, which shall be linked to the Commission website and the transparency platform referred to in Article 26 and which shall meet the requirements specified in point (6) of Annex VI. Commercially sensitive information shall be treated as confidential. National competent authorities shall check the fulfilment of this obligation by the project promoters and take measures ensuring compliance where necessary.

Article 10 Duration and implementation of the permit-granting process

1. The permit-granting process shall provide for the following two procedures:

(a) the optional pre-application procedure, covering the period between the start of the permit-granting process and the acceptance of the submitted complete application file by the national competent authority, which shall take place within a maximum period of 18 months;

(b) the mandatory statutory permit-granting procedure, covering the period from the date of acceptance of the submitted complete application file until the date of the comprehensive decision, which shall not exceed 12 months.

With regard to the first subparagraph, point (b), where possible, Member States may provide for a statutory permit-granting procedure that is shorter than 18 months.

2. The national competent authority shall ensure that the combined duration of the two procedures referred to in paragraph 1 does not exceed a period of 36 months.

However, where the national competent authority considers that one or both of the procedures will not be completed within the time limits set out in paragraph 1, it may extend one or both of those time limits before their expiry and on a case-by-case basis. The national competent authority shall not extend the combined duration of the two procedures for more than six months other than in exceptional circumstances.

Where the national competent authority extends the time limits, it shall inform the Group concerned of the reasons for such extension and present it with the measures taken, or to be taken, for the conclusion of the permit-granting process, with the least possible delay. The Group may request that the national competent authority reports regularly on the progress achieved in that regard and provide reasons for any delays.

3. Member States shall ensure that the national competent authorities referred to in Article 8(1) have adequate technical, financial and human resources to render a comprehensive decision within the timeframe indicated in Article 10(2).

4. Member States shall ensure that, in the permit-granting procedure referred to in paragraph 1,:

(a) the lack of reply by the national competent authorities within the deadline established in paragraph 2 results in the comprehensive decision to be considered as approved;

(b) the lack of reply by other authorities concerned within the reasonable time limit established by a national competent authority in accordance with Article 8(3), results in their specific opinion, authorisation or permit to be considered as granted or answered positively.

This paragraph does not produce effects for environmental decisions, and where the

principle of administrative tacit approval does not exist in the legal system of the

Member State concerned.

All decisions shall be made publicly available, including final decisions granted

tacitly following the lack of reply by the relevant competent authorities or authorities

concerned.

5. When requesting the start of the permit-granting process, the project promoters shall notify the project to the national competent authority of each Member State where the project is located, including in Member States where the project crosses their exclusive economic zone, in written or electronic form and include a reasonably detailed outline of the project.

Within one month of receipt of the notification, the national competent authority shall, in electronic form, either:

(a) issue an acknowledgement of the receipt; or

(b) if the project is not considered to be mature enough to enter the permit-granting process, reject the notification, and provide the reasons for its decision including on behalf of other authorities concerned.

The date of the acknowledgement of receipt shall mark the start of the permit-

granting process. Where two or more Member States are concerned, the date of the

acceptance of the last notification by the national competent authority concerned

shall mark the start of the permit-granting process.

Member States shall ensure that dedicated digital platforms are established to

manage permitting applications, permitting processes, ongoing permitting decisions,

and decisions issued in an easily accessible format.

Those platforms shall provide access to the relevant environmental and geological

data and decisions available in the central online portal referred to in Article 10(3) of

Regulation [xxxxx] of the European Parliament and of the Council.

6. National competent authorities shall ensure that the permit-granting process is accelerated in accordance with this Chapter for each category of projects of common interest and projects of mutual interest. To that end, the national competent authorities shall adapt their requirements for the start of the permit-granting process and for the acceptance of the complete application file, in accordance with the relevant project category, their nature, dimension, lack of requirement for environmental assessment, or any other assessments under national law, or the fact that they may require less authorisations and approvals to reach the ready-to-build phase.

As such, national competent authorities may decide that the pre-application procedure referred to in paragraphs 1 and 6 of this Article is not necessary in case the project promoter does not require this period to perform studies, assessments and gather data for completing their permitting application file.

7. The national competent authorities shall take into consideration, in the screening for establishing the requirements for the permit-granting process, any studies conducted and permits or authorisations issued up to five years before the project entered the permit-granting process in accordance with this Article, including assessments conducted for the deployment of other projects that are relevant and can be reused, and shall not require unnecessary or duplicate studies, assessments, permits or authorisations.

8. In Member States where the determination of a route or location undertaken solely for the specific purpose of a planned project, including the planning of specific corridors for grid infrastructures, cannot be included in the permit-granting process leading to the comprehensive decision, the corresponding decision shall be taken within a separate period of six months, starting on the date of submission of the final and complete application documents by the project promoter.

9. The pre-application procedure shall include: the screening and scoping of the required studies, reports and documentation expected from the project promoter; the drawing up of the detailed schedule; and, the verification of the draft application file, under the following steps:

(a) as soon as possible and no later than three months following the notification by the project promoter referred to in paragraph 5, the national competent authority shall determine, and notify the project promoter of the authorisations, permits and assessments required to complete permit-granting process.

The notification made by the national competent authority shall include the checklist referred to in point (1)(e) of Annex VI, and where relevant, its content shall be established in cooperation with the other authorities concerned and with national competent authorities in the other Member States where the project is located, including if the project crosses their exclusive economic zone.

Where applicable the notification shall detail the conditions for the project to benefit from the exemption of Article 7(7) and identify:

(i) whether the project is highly likely to give rise to significant unforeseen adverse effects in view of the environmental sensitivity of the geographical areas where it is planned, which were not identified during the environmental assessment of the National Development Plans carried out pursuant to Directive 2001/42/EC and, where relevant, to Directive 92/43/EEC;

(ii) the appropriate and proportionate mitigation measures, or monetary compensation for species protection programs applicable to the project in accordance with Article 7(8);

(iii) whether any part of the project is likely to produce significant effects on the environment in another Member State; in such a case the national competent authority of the Member State in which the project is located shall ensure the application of Article 7 of Directive 2011/92/EU and Articles 2 to 7 of the Convention on environmental impact assessment in a transboundary context;

(b) the notification shall also indicate whether the national competent authority approves, or amends, the concept for public participation submitted by the project promoter in accordance with Article 9(3). During the screening period, the national competent authority shall, in cooperation with other authorities concerned, determine the scope and level of detail of the studies, reports and documentations, including assessments required for the environmental permitting of the project, that the project promoter is expected to produce and submit as part of the complete application file.

Neither the national competent authority, nor any of the authorities concerned shall subsequently request any additional information, studies, reports or assessments than the ones determined in this initial screening process, except where a material change has occurred to the project or its surrounding environment. Where such a material change occurs, the national competent authority may request additional information from the project promoter based on a reasoned justification;

(c) the national competent authority shall draw up, in close cooperation with the project promoter and other authorities concerned and the national competent authorities in the other Member States where the project is located, including if the project crosses their exclusive economic zone, and taking into account the results of the activities carried out under point (a) of this paragraph, a detailed schedule for the permit-granting process in accordance with the guidelines set out in point (2) of Annex VI;

(d) upon receipt of the draft application file, the national competent authority may, on its own behalf or on behalf of other authorities concerned, request the project promoter to submit missing information relating to the requested elements referred to in point (a) within a maximum deadline of one month.

The pre-application procedure shall include the preparation of any environmental

reports by the project promoters, as necessary, including the climate adaptation and

cyber and physical security documentation and assessments.

In cooperation with the project promoter and, as necessary, other authorities

concerned or other national competent authorities of other Member States where the

project is located, including if the project crosses their exclusive economic zone, the

national competent authority may design the requirements for the permit-granting

process of a certain project, and the public consultation timeline set out in point (4)

of Annex VI, in phases, provided it does not delay the overall development of the

project and ensures that the permit-granting process is simplified and accelerated.

The maximum deadlines of paragraphs 1 and 2 shall apply for each of the phases.

Within one month of submission of the missing information referred to in the first subparagraph, point (d), the competent authority shall accept for examination the complete application in written or electronic form or on dedicated digital platforms, starting the statutory permit-granting procedure referred to in paragraph 1, point (b).

10. The project promoter shall cooperate in good faith with the national competent authorities and with all authorities concerned, in order to provide them with complete and correct information, in particular with regard to the information identified in the screening process.

The project promoter shall ensure that the application file is complete and adequate, seeking the national competent authority’s opinion it as early as possible in the permit-granting process.

The project promoter shall cooperate fully with the national competent authority in order to comply with the time limits set in this Regulation. Any delays due to the fault of the project promoter in good faith in this respect, shall not count against the maximum permitting duration.

11. Member States shall ensure that any amendments to the national law do not lead to prolonging any permit-granting process started before the entry into force of those amendments. With a view of maintaining an accelerated permit-granting process for projects on the Union list, national competent authorities shall adequately adapt the schedule established in accordance with paragraph 6, point (b), of this Article to ensure, to the extent possible, that the time limits for the permit-granting process set in this Article are not exceeded.

12. The time limits set in this Article shall be without prejudice to obligations arising from Union and international law, and without prejudice to administrative appeal procedures and judicial remedies before a court or tribunal.

The time limits set in this Article for any of the permit-granting procedures shall be without prejudice to any shorter time limits set by Member States.

CHAPTER IV

Cross-sectoral infrastructure planning

Article 11 Union strategic scenario for the Union list

1. By … [one year from the date of entry into force of this Regulation] and at least every two years thereafter, the Commission shall, in cooperation with the stakeholders referred to in paragraph 5 of this Article, develop a Union strategic scenario for the electricity, hydrogen and gas sectors and, where relevant, CO₂ transport and storage, to be used for the establishment of the Union list referred to in Article 3, for the Union-wide ten-year network development plans referred to in: Article 48 of Regulation (EU) 2019/943 and Article 59 of Regulation (EU) 2024/1789, the infrastructure needs identification process referred to in Article 12 of this Regulation, the energy system wide cost-benefit analysis referred to in Article 14 of this Regulation, and the cross-border cost allocation referred to in Article 17 of this Regulation. The Union strategic scenario shall be consistent with the Union’s targets for energy and climate and include a long-term perspective until at least 2050 in accordance with the Union’s climate neutrality objective.

1a. The Union strategic scenario establishing the common reference framework for the processes referred to in paragraph 1 shall consist of:

(i) an initial scenario, consistent with the Union’s targets for energy and climate and include a long-term perspective until at least 2050 in accordance with the Union’s climate neutrality objective;

(ii) an alternative scenario, taking into consideration the actual progress towards delivering Member States’ national and energy climate plans, reflecting different policy and system assumptions; and

(iii) mandatory sensitivity analyses assessing the robustness of infrastructure planning under different assumptions.

The Union strategic scenario shall be complemented by the Comprehensive framework assessment referred to in Article 14a.

2. The Union strategic scenario shall:

▌

(b) take a cross-sectoral approach ensuring consistency between the electricity, hydrogen and gas sectors, and, where relevant, CO₂ transport and storage, optimizing system efficiency including through the efficient use of existing and planned infrastructure and the integration of flexibility resources across sectors;

(ba) be developed with due consideration to relevant national planning instruments of the Member States, including national energy and climate plans established pursuant to Articles 3 and 14 of Regulation (EU) 2018/1999, and take into consideration national network development plans adopted pursuant to Article 51 of Directive 2019/944 and Article 55 of Directive 2024/1788, while ensuring consistency and comparability of assumptions at Union level;

(bb) reflect, where relevant, the development and needs of distribution networks by taking into account distribution-level constraints, demand and decentralised generation patterns, and flexibility needs, based on distribution network development plans and relevant data from distribution system operators;

(bc) take into account relevant national and regional specificities;

(bd) cover the planning horizon up to 2050 and include two successive ten-year planning periods within the overall planning horizon, the first one until 2040 and the next one until 2050;

(c) include mandatory sensitivity analyses as appropriate, including, where relevant, analyses reflecting daily, multi-day and seasonal variations in renewable energy generation and demand, energy storage, observed evolution of supply and demand, policies supported by concrete implementation measures and comparison with the initial scenario;

(ca) be consistent with the latest available European Resource Adequacy Assessment (ERAA);

(cb) be used for the purposes of developing the infrastructure needs report pursuant to Article 12, the cost-benefit analysis pursuant to Article 14 and the cross-border allocation pursuant to Article 17;

(cc) include an alternative scenario applying different assumptions regarding policy implementation, technology deployment, energy demand, infrastructure development and system evolution in order to assess the robustness of infrastructure planning and investment decisions;

(cd) be developed at a sufficiently granular spatial level to identify cross-border and relevant internal infrastructure needs and system bottlenecks, taking into account Member States, bidding zones, control zones or NUTS1- or NUTS2-equivalent regions, as appropriate.

3. The Commission shall lead and coordinate the process for development of the Union strategic scenario, as referred to in parapraph 1. The European Network of Transmission System Operators for Electricity (ENTSO for Electricity), the European Network of Network Operators for Hydrogen (ENNOH), the European Network of Transmission System Operators for Gas (ENTSO for Gas), the EU DSO and the Member States shall provide to the Commission and the Agency, upon their request, the data and information necessary for the development of the Union strategic scenario referred to in paragraph 1. That includes, but is not limited to market and network data, such as demand and supply projections, characteristics of power generation, hydrogen production and networks, flexibility sources, imports assumptions, as well as climatic years data, including data on network utilisation, availability of capacity and flexibility resources. Before issuing a request, the Commission or the Agency may consult the ENTSO for Electricity, the ENTSO for Gas and the ENNOH on guidelines and templates used for data collection. The Commission shall set a reasonable time limit within which the data and information is to be provided, taking into account the complexity and urgency of the data and information required. Where an addressee does not provide the information requested within the time limit set by the Commission or supplies incomplete information, the Commission may by decision require the information to be provided. The Commission shall request the Agency to verify the data submitted to the Commission, including by verifying national data with the relevant national regulatory authorities.

4. The Commission shall consult the Agency, national regulatory authorities, the ENTSO for Electricity, the ENNOH, the ENTSO for Gas, the European entity for the cooperation of electricity distribution system operators in the European Union (EU DSO Entity), the Member States as well as other relevant stakeholders on the data collected for the purpose of the Union strategic scenario development process, including assumptions and their use in the development of the Union strategic scenario. The consultation shall also cover the consistency of the data provided by the Member States with their national planning instruments.

4a. In the consultation process referred to in paragraph 4, the Commission may take into account any alternative scenarios developed by academia, provided that they are documented to a sufficient level. The Commission may publish a consultation report summarising relevant contributions and explanations from them.

4b. All input data used in the scenarios as well as all output data shall be published aggregated to the level of Member States, bidding zones, control zones or NUTS1/2-equivalent with an open data licence, conforming with Directive (EU) 2019/1024 on open data and the re-use of public sector information. The data shall be sufficiently documented and versioned to enable any third party to replicate the scenario development. All model source codes and libraries used to develop the scenarios shall be published using an open software licence. A first version of the data and code shall be published at least 6 months before the scenarios are finalised. The input data shall include generation potentials and capacities, storage capacities, cross-border capacities, time series for demand and renewable generation at at least hourly resolution for multiple weather years, technology assumptions (efficiencies, costs), maintenance and outage schedules, sector-coupling assumptions, currency year used, social discount rate and data on non-EU countries included in the analysis.

5. The Commission shall submit the draft Union strategic scenario to the TEN-E Group, together with information on how the comments received in the consultation referred to in paragraph 4 have been taken into consideration. The TEN-E Group members shall deliver their comments, if any, within one month of receiving the draft Union strategic scenario.

6. The Commission is empowered to adopt delegated acts in accordance with Article 23 to supplement this Regulation by establishing the Union strategic scenario pursuant to this Article. The Commission shall adopt the Union strategic scenario taking into account the comments from the TEN-E Group.

7. Following the publication of the delegated act on the Union strategic scenario the Commission shall publish the underlying input and output data for the Union strategic scenario, subject to restrictions under national law and relevant confidentiality agreements.

7a. The ESABCC may, on its own initiative, submit an opinion on the consistency of the draft Union strategic scenario and its underlying assumptions with the Union's energy and climate targets and with the climate-neutrality objective set out in Regulation (EU) 2021/1119. Where available, that opinion shall be made publicly available together with the draft Union strategic scenario. When the Union strategic scenario is adopted, a statement shall be published setting out how that opinion has been taken into account or, where appropriate, the reasons for not following it.

▌Article 12 Infrastructure needs identification report

1. The ENTSO for Electricity and the ENNOH respectively, shall develop an infrastructure needs identification report to identify infrastructure needs affecting the Union’s objectives related to electricity and hydrogen.

2. The infrastructure needs identification reports shall:

(a) be based on the Union strategic scenario developed by the Commission in accordance with Article 11 (3) and its sensitivity analyses, which shall be used as the reference framework for the identification of infrastructure needs;

(b) comply with the methodology developed by the Agency pursuant to paragraph 11;

(c) comply with the principles laid down in Annex VII of this Regulation;

(ca) identify the extent to which the identified infrastructure needs are expected to be addressed by projects submitted for inclusion in the Union-wide ten-year network development plan, including any remaining gaps;

(cb) take into account the long-term planning horizon, the two ten-year planning periods, the network mapping, the estimated investment cost and the phased implementation milestones, taking into consideration the system stability and security of supply in the Member States;

(d) ensure a cross-sectoral approach ensuring consistency between the electricity and hydrogen sectors as well as, where applicable, gas, district heating and CO2 sectors, by taking into account interactions, trade-offs and synergies between those sectors within the infrastructure needs identification, including impacts of different climatic zones, seasonality and local and national circumstances;

(da) take account of the capabilities of all available and emerging grid-enhancing technologies;

(db) consider forward-looking climate and extreme weather risk scenarios, including the potential of non-wire and digital solutions to prevent system failures.

3. The ENTSO for Electricity and the ENNOH, respectively, shall consult relevant stakeholders on the additional data, assumptions modelling approaches beyond the Union strategic scenario’s data and assumptions modelling approaches already consulted by the Commission pursuant to Article 11 and their use for the development of their infrastructure needs identification report. The consultation process shall be transparent, structured, open and timely, and the ENTSO for Electricity, the ENNOH and, where relevant, the ENTSO for Gas shall document how stakeholder input has been taken into account. All assumptions, data sources, modelling approaches, parameters and assessment criteria shall be made publicly available in an appropriate manner.

4. Within six months of the publication of the Union strategic scenario and its sensitivity analyses pursuant to Article 11, the ENTSO for Electricity and the ENNOH shall submit their draft infrastructure needs identification reports to the Agency and the TEN-E Group.

The reports shall evaluate infrastructure needs on the basis of the Union strategic scenario and sensitivities published pursuant to Article 11 and assess how projects submitted for inclusion in the Union wide ten-year network development plan address those needs. The reports shall be based on the most up-to-date information concerning existing infrastructure and projects.

5. Within two months of receipt of the draft infrastructure needs identification reports, the Agency shall assess compliance of the draft infrastructure needs identification reports, including with the requirements referred to in Article 12(2). The Agency shall further assess to which extent projects submitted for inclusion in the Union wide ten-year network development plan match the needs identified. Where the Agency identifies deviations or insufficient compliance with the requirements of this Article, it shall be empowered to request amendments to the draft reports, where duly justified. The ENTSO for Electricity and the ENNOH shall amend the draft reports accordingly. Where amendments have been requested by the Agency, the ENTSO for Electricity and the ENNOH shall submit an amended draft report reflecting the requested amendments within a time specified in the Agency’s request. Within three months of receipt of the draft report or amended draft report, the Agency shall approve it or amend it. Where the Agency intends to amend the report, it shall consult the association concerned, the Commission and the TEN-E Group. If no request is issued within one month, the ENTSO for Electricity and the ENNOH shall submit the draft reports to the Agency for approval. The Agency shall inform the TEN-E Group thereof.

▌

10. Within two weeks of the approval of the infrastructure needs identification reports by the Agency pursuant to paragraph5, the ENTSO for Electricity and the ENNOH shall publish them on their website respectively, together with the corresponding final data, assumptions and relevant sources in a sufficiently accurate form. Where relevant, the ENTSO for Electricity and the ENNOH shall update the infrastructure needs identification reports, including as regards grid enhancing technologies, in accordance with the sensitivity analyses adopted pursuant to Article 11, when requested by the Commission.

11. By [9 months after entry into force of this Regulation] the Agency, after having conducted an extensive consultation involving the Commission, the Member States the ENTSO for Electricity, the ENTSO for Gas, the ENNOH, the EU DSO Entity and other relevant stakeholders, shall publish a binding methodology for the identification of infrastructure needs. The methodology shall ensure that the infrastructure needs identification is carried out and updated at least every two years.

12. The methodology shall be developed on the basis of the principles laid down in Annex VII and shall ensure their consistent application in the infrastructure needs identification process.

13. The Agency on its own initiative, or upon request of the Commission, shall update the methodology where necessary.

14. Until 1 January 2027, this Article applies subject to the transitional provisions set out in Article 61 of Regulation (EU) 2024/1789.

Article 13 Needs matching process

1. When the infrastructure needs identification report for electricity concludes that projects submitted for inclusion in the Union wide ten-year network development plan do not fully meet the infrastructure needs identified pursuant to Article 12, or where previously identified needs remain insufficiently addressed, the Commission shall launch without undue delay a targeted process to identify possible solutions to address the unmatched needs taking into account the initial scenario, its sensitivity analyses and the expected European and regional socio-economic benefits of possible solutions.

2. The Commission, in cooperation with the ENTSO for Electricity, the Member States, the Agency and the relevant national regulatory authorities shall invite system operators in the relevant Groups to propose, within six months of the invitation, projects capable of addressing the unmatched needs. The Commission shall submit the proposed projects to the relevant Groups established in accordance with Article 3 for discussion. The Commission may involve other relevant stakeholders and other regional cooperation fora. Project promoters capable of addressing the unmatched needs shall submit eligible projects as soon as possible for inclusion in the subsequent national development plans, the Union-wide ten-year network development plan and the Union list. The identification and discussion of such projects shall ensure coherence and complementarity with existing national and European planning processes, in particular national network development plans, the Union-wide ten-year network development plan and the PCI/PMI selection process.

2a. The Commission shall ensure transparency of the process by publishing the identified unmatched needs, the proposed solutions and the outcome of their assessment pursuant to paragraph 2, including the extent to which those solutions are expected to address the identified needs, while ensuring the protection of commercially sensitive, confidential, security-relevant and personal data.

3. Where the process under paragraph 2 does not identify projects capable of addressing the unmatched needs, or where the proposed projects are not sufficient to effectively address those needs, the Commission shall launch a call for proposals open to any third party capable of becoming a project promoter to propose projects capable of addressing the unmatched needs. Project promoters capable of addressing the unmatched needs shall submit eligible projects as soon as possible for inclusion in the subsequent national development plans, the Union-wide ten-year network development plan and the Union list. Such a call shall be designed so as to ensure coherence with existing national and European planning processes and shall avoid the creation of parallel planning frameworks.

3a. When launching a call for proposals referred to in paragraph 3, the Commission shall ensure their financing and clarify responsibilities for potential technical and security implications for the relevant national grids and existing cross-border infrastructure resulting from the implementation of that project.

4. The Commission shall monitor the outcome of the process and progress of the projects referred to in paragraphs 2 and 3 and closely involve the relevant Groups established in accordance with Article 3 and other relevant regional cooperation fora, the Agency and national regulatory authorities. The Commission shall regularly assess whether the unmatched needs are being effectively addressed and shall report to the European Parliament and to the Council on any remaining gaps in subsequent planning cycles. Where no sufficiently effective projects are submitted following a call for proposals, the Commission may consider additional incentive mechanisms.

4a. Where the infrastructure needs identification report for hydrogen concludes that projects submitted for inclusion in the Union wide ten-year network development plan do not fully meet the infrastructure needs identified pursuant to Article 12, the Commission may launch a process to identify possible solutions to address the unmatched needs, including through targeted de-risking measures, such as intertemporal cost allocation mechanisms and guarantee instruments.

Article 14 Energy system wide cost-benefit analysis

1. For projects falling under the infrastructure categories set out in points (1)(a), (b), (c), (d), (e), (f) and (h) and points (2) and (3) of Annex II , the ENTSO for Electricity and the ENNOH shall use consistent single sector methodologies for a harmonised energy system-wide cost-benefit analysis at Union level when assessing projects for their inclusion in their respective Union-wide ten-year network development plans.

2. The methodologies shall:

(a) be drawn up in accordance with the principles laid down in Annex V;

(b) be based on common assumptions allowing for project comparison;

(c) be consistent with the Union’s targets for energy and climate and its 2050 climate neutrality objective and be based on and applied in accordance with the initial scenario and sensitivity analyses referred to in Article 11, as well as with the rules and indicators set out in Annex IV, and contribute to ensuring resilience to existing and emerging risks identified at Union and Member State levels;

(d) allow for the assessment of project bundles pursuant to Article 18 and, in the electricity sector, for the consideration of non-wire, innovative transmission and grid optimisation technologies;

(e) shall take a cross-sectoral approach and ensure methodological coherence between electricity, hydrogen and electrolysers;

(ea) assess, for each project and project bundle, the contribution to the relevant implementation phase under the initial scenario and reflect, where relevant, network mapping and indicative investment needs established pursuant to Article 11.

3. The ENTSO for Electricity and the ENNOH shall develop and publish preliminary draft methodologies for the purpose of consulting the EU DSO Entity, and other relevant stakeholders. The consultation process shall be open, timely, transparent and structured. The ENTSO for Electricity and the ENNOH shall publish all relevant background documentation, including assumptions, and shall document how stakeholder input has been taken into account.

4. The ENTSO for Electricity and the ENNOH shall publish and submit to Member States, the Commission and the Agency their draft methodologies. The ENTSO for Electricity and the ENNOH shall provide reasons where they have not, or have only partly, taken into account the comments from Member States, national authorities, or other stakeholders. The ENTSO for Electricity and the ENNOH shall publish and submit to Member States, the Commission and the Agency their first consistent single sector draft methodologies by December 2027.

5. Within three months of receipt of the draft methodologies, the Agency shall assess their compliance with this Article and with Annex V and may request amendments where duly justified. The Commission may organise specific meetings of the Groups to discuss the draft methodologies.

6. Within three months of receipt of the opinions of the Agency and Member States, the ENTSO for Electricity and the ENNOH shall amend their respective methodologies to fully take into account the opinions of the Agency and the Member States and submit them to the Commission for its approval.

7. Within three months of receipt of the respective methodologies, the Commission shall issue a reasoned decision approving them or requiring amendments where duly justified. The Agency shall publish the approved methodologies on its website without delay.

8. If the Agency rejects the draft methodology, it shall provide reasons. The ENTSO for Electricity and the ENNOH respectively shall revise the draft methodology and resubmit it to the Agency for its approval.

9. Within two weeks of the approval by the Agency, the ENTSO for Electricity and the ENNOH shall publish their respective methodologies on their websites.

10. The Commission and the Agency may request the ENTSO for Electricity and the ENNOH to update their methodologies and set a timetable. The Agency may act on its own initiative, or upon a duly reasoned request by national regulatory authorities or stakeholders, and may require updates to the methodologies where necessary to ensure their continued relevance and robustness. The Agency shall publish the requests it receives and all relevant non-commercially sensitive documents on which its request is based.

11. Where the Agency requires an update pursuant to paragraph 10, the ENTSO for Electricity and the ENNOH shall update the consistent single sector cost-benefit methodologies in accordance with a streamlined approval procedure defined by the Agency, ensuring timely implementation while maintaining transparency and ensuring stakeholder consultation.

12. The ENTSO for Electricity and the ENNOH shall publish in the context of each Union-wide ten-year network development plan the updated input data relevant for application of the methodologies, including calculation methods, network models, relevant load flow and market data, as well as the underlying assumptions used to assess identified infrastructure needs and their correspondence with proposed projects, in a digitally readable format. These data shall be published in a sufficiently accurate form subject to restrictions under national law and relevant confidentiality agreements. ▌

13. The ENTSO for Electricity and the ENNOH shall calculate and publish, as part of the Union-wide ten-year network development plan, the results of cost-benefit analyses for all projects, showing how the benefits are distributed across countries, including gross and net benefits for both hosting countries and non-hosting countries that benefit from the respective project.

14. For projects falling under the energy infrastructure categories set out in point (1)(g) and in point (4) of Annex II, the Commission shall ensure the development of methodologies for a harmonised energy system-wide cost-benefit analysis at Union level. Those methodologies shall be compatible in terms of benefits and costs with the methodologies developed by the ENTSO for Electricity and the ENNOH. The methodologies shall be developed in a transparent manner, including extensive consultation of the Agency, the Member States, the EU DSO entity and all relevant stakeholders.

15. Starting from [April 2028] and every two years, the Agency shall establish and publish a set of indicators and corresponding reference values for the comparison of unit investment and operational costs for comparable projects of the energy infrastructure categories included in Annex II. Project promoters, system operators and investors who have commissioned projects falling under the infrastructure categories identified in Annex II shall provide the requested data to the national regulatory authorities and to the Agency. Those reference values may be used by the ENTSO for Electricity and the ENNOH for the cost-benefit analyses carried out for subsequent Union-wide ten-year network development plans.

Article 14a Comprehensive framework assessment

1. Following completion of the infrastructure needs identification pursuant to Article 12, and considering the needs matching process pursuant to Article 13, and the energy system-wide cost-benefit analysis pursuant to Article 14, the Commission shall every two years prepare a Comprehensive framework assessment to complement the Union strategic scenario.

2. The Comprehensive framework assessment shall aggregate and integrate the results of the planning processes referred to in paragraph 1 into a single Union-level strategic framework and shall provide an indicative assessment of the future architecture of the Union energy system and cover the planing horizon up to 2050 and include two successive ten-year planing periods within the overall planing horizon, the first one until 2040 and the next one until 2050.

3. The Comprehensive framework assessment shall include where appropriate:

(a) an indicative Union-wide assessment of infrastructure needs;

(b) priority cross-border infrastructure and strategically relevant internal infrastructure;

(c) an indicative Union-wide network map identifying major infrastructure corridors, bottlenecks, reinforcement needs and interdependencies between electricity, hydrogen, gas and CO₂ transport and storage infrastructure;

(d) the expected architecture of the Union energy infrastructure system for each planning horizon;

(e) indicative implementation phases and milestones;

(f) indicative investment costs and financing needs for each planing window;

(g) an assessment of expected benefits for system efficiency, resilience, security of supply and achievement of the Union's energy and climate objectives;

(h) remaining infrastructure gaps and strategic priorities requiring further action at Union level.

4. The Comprehensive framework assessment shall not replace or prejudice the infrastructure needs identification, the energy system-wide cost-benefit analysis or the project selection process established under this Regulation but shall provide an integrated strategic overview of their combined results at Union level.

5. The Commission may evaluate and propose appropriate financing mechanisms and support instruments facilitating the implementation of infrastructure developments identified in the Comprehensive framework assessment, taking into account Member States’ investment needs and the objective of an efficient and resilient Union energy system and enabling timely and efficient energy infrastructure investments across the Union, without creating any entitlement to Union or national financing.

CHAPTER V

Offshore grids for renewable integration

Article 15

Offshore grid planning

1. By [within 6 months after entry into force], Member States, with the support of the Commission, within their specific priority offshore grid corridors, set out in Section 2 of Annex I, taking into account the specificities and development in each region, shall update the non-binding agreement to cooperate on goals for offshore renewable generation to be deployed within each sea basin by 2030, 2040 and 2050, in accordance with their national energy and climate plans, and the offshore renewable potential of each sea basin. The agreement shall include renewable offshore hydrogen goals as applicable.

As part of the non-binding agreements, Member States, with the support of the Commission, within their specific priority offshore grid corridors, set out in Section 2 of Annex I, shall also consider whether specific cross-border goals, such as for hybrid or cross-border radial projects, should be established between two or more Member States in their respective national energy and climate plans with the aim to achieve the goals for offshore renewable generation to be deployed within each sea basin in the most efficient manner.

That non-binding agreement shall be made in writing as regards each sea basin linked to the territory of the Member States, and shall be without prejudice to the right of Member States to develop projects on their territorial sea and exclusive economic zone. The Commission shall provide guidance for the work in the Groups.

2. By [within 12 months after entry into force], and every two years thereafter, as part of the following ten-year network development plan thereafter, the ENTSO for Electricity and the ENNOH with the involvement of the four High-Level Groups, the Agency, the relevant TSOs and HTNOs, as well as the national regulatory authorities, the Member States and the Commission, and in accordance with the non-binding agreement referred to in paragraph 1 of this Article, shall jointly develop and publish, as a separate report which is part of the Union-wide ten-year network development plan, high-level strategic integrated offshore network development plans for each sea-basin, in line with the priority offshore grid corridors referred to in Annex I, taking into account environmental protection and other uses of the sea. The ENTSO for Electricity shall take into account relevant contributions provided by the ENNOH to fulfil the tasks assigned to them in accordance with this Article.

In the development of the high-level strategic integrated offshore network development plans within the timeline provided for in paragraph 1, the ENTSO for Electricity and the ENNOH shall consider the non-binding agreements referred to in paragraph 1 for the development of the Union-wide ten-year network development plan and the Union strategic scenario.

The high-level strategic integrated offshore network development plans shall provide a general overview of offshore generation capacities potential and resulting offshore grid needs, including the potential needs for interconnectors, hybrid projects, radial connections, reinforcements, and hydrogen infrastructure.

3. The high-level strategic integrated offshore network development plans shall be consistent with regional investment plans published pursuant to Article 34(1) of Regulation (EU) 2019/943 and integrated within the Union-wide ten-year network development plans in order to ensure coherent development of onshore and offshore grid planning and the necessary reinforcements as well as hydrogen infrastructure needs linked to offshore renewable energy development, including hydrogen production transport and storage where relevant for system efficiency.

4. At the latest every four years after the adoption of the non-binding agreement with paragraph 1, the Member States, shall update their non-binding agreements referred to in paragraph 1 of this Article, including in view of the results of the application of the latest cost-benefit and cost-sharing to the priority offshore grid corridors.

5. After each update of the non-binding agreements in accordance with paragraph 4, for each sea basin, the ENTSO for Electricity and the ENNOH shall update the high level strategic integrated offshore network development plans within the next Union-wide ten-year network development plan as referred to in paragraph 2.

Article 16 Guidance on collaborative investment frameworks for offshore energy projects

1. 1. The Commission shall, with the involvement of the Member States, relevant TSOs, HTNOs, the Agency and the national regulatory authorities, consider whether an update of the guidance on collaborative investment frameworks for offshore energy projects, which provides for a specific cost-benefit and cost-sharing for the deployment of the sea-basin integrated offshore network development plans referred to in Article 15(2) in accordance with the non-binding agreements referred to in Article 14(1), is necessary and, where relevant, publish an updated version of the guidance. This guidance shall be compatible with Article 17(1). The Commission shall update its guidance when appropriate, taking into account the results of its implementation while also including uniform cross-border cost-allocation methodology for offshore hybrid projects when available.

2. The ENTSO for Electricity and the ENNOH with the involvement of the relevant TSOs, HTNOs, the Agency, the national regulatory authorities and the Commission, shall update the results of the application of the cost-benefit and cost-sharing to the priority offshore grid corridors, including whenever the Commission publishes any update to the guidance for a specific cost-benefit and cost-sharing for the deployment of the sea-basin integrated offshore network development plans referred to in Article 15(2) in accordance with the non-binding agreements referred to in Article 15(1).

CHAPTER VI

Regulatory framework

Article 17 Enabling investments with a cross-border impact

1. The efficiently incurred investment costs, which exclude maintenance costs, related to a project of common interest falling under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (e), (f) and (h) of Annex II, and projects of common interest falling under the energy infrastructure category set out in point (2) of Annex II, where they fall under the competence of national regulatory authorities in each Member State concerned, shall be borne by the relevant TSO, HNO, other operators or the project promoters of the transmission infrastructure of the Member States to which the project provides a net positive impact, and, to the extent not covered by congestion rents or other charges, be paid for by network users through tariffs for network access in that or those Member States.

1a. Project promoters, regulatory authorities and the system operators of the concerned Member States shall provide to the Agency, upon its request, the information necessary for the purpose of carrying out the Agency’s tasks under this Article.

2. The provisions of this Article shall apply to a project of common interest falling under the energy infrastructure categories set out in Article 27 and points (1)(a), (b), (c), (d), (e), (f) and (h) and point (2) of Annex II, where at least one project promoter requests the relevant national authorities their application for the costs of the project.

Projects falling under the energy infrastructure category set out in point (1)(g) of Annex II may benefit from the provisions of this Article where at least one project promoter requests its application from the relevant national authorities.

Where a project has several project promoters, the relevant national regulatory authorities shall without delay request all project promoters to submit the investment request jointly in accordance with paragraph 4, without prejudice to project promoters’ agreement on cost sharing.

3. For a project of common interest to which paragraph 1 applies, the project promoters shall keep all relevant national regulatory authorities regularly informed, at least once per year from inclusion of the project on the Union list, and until the project is commissioned, of the progress of that project and the identification of costs and the impact associated with it. The project promoters shall take the necessary measures to ensure continuous progress of a project of common interest.

4. As soon as such a project of common interest has reached sufficient maturity, and is estimated to be ready to start the construction phase within the next 36 months, the project promoters, after having consulted the TSOs or HTNOs from the Member States which receive a significant net positive impact from it, shall submit an investment request. That investment request shall include a request for a cross-border cost allocation and shall be submitted to all the relevant national regulatory authorities concerned, accompanied by the following:

(a) up-to-date project-specific cost-benefit analysis consistent with the Union strategic scenario referred to in Article 11 applying the methodology for a harmonised energy system-wide cost-benefit analysis referred to in Article 14; that analysis shall explicitly quantify and present the distribution of potential benefits and any sensitivities referred to in Article 11, and the methodology for a harmonised energy system-wide cost-benefit analysis referred to in Article 14 and taking into account benefits beyond the borders of the Member States on the territory of which the project is located;

(b) a business plan evaluating the financial viability of the project, including the chosen financing solution, and, for a project of common interest falling under the energy infrastructure category referred to in point (3) of Annex II, the results of market testing; for projects contributing to Member States energy resilience, a comparison shall be made with alternative National projects;

(c) ▌a substantiated proposal for a cross-border cost allocation.

Where a project is promoted by several project promoters, they shall submit their investment request jointly.

The relevant national regulatory authorities shall, upon receipt, transmit to the Agency, without delay, a copy of each investment request, for information purposes.

The relevant national regulatory authorities and the Agency shall preserve the confidentiality of commercially sensitive information.

The submission of an investment request and the adoption of a cross-border cost

and risk allocation decision pursuant to this Article shall not be required as a

condition for a project promoter to apply for Union financial support, including

under the Connecting Europe Facility, provided that the hosting national

regulatory authority or authorities have issued a positive statement on the

eligibility and maturity of the project.

5. Within six months of the date on which the investment request is received by the last of the relevant national regulatory authorities, those authorities shall, after consulting the project promoters concerned, take joint coordinated decisions on the allocation of efficiently incurred investment costs and, where applicable, operational costs to be borne by each system operator for the project, as well as their inclusion in tariffs, or on the rejection of the investment request, in whole or in part, if the common analysis of the relevant national regulatory authorities concludes that the project or a part of it fails to provide a significant net benefit in any of the Member States of the relevant national regulatory authorities.

The relevant national regulatory authorities shall include the relevant efficiently incurred investment costs in tariffs, as defined in the recommendation referred to in paragraph 14, in accordance with the allocation of investment costs to be borne by each system operator for the project.

For projects in the territories of their respective Member State, the relevant national regulatory authorities shall thereafter assess, where appropriate, whether any affordability issues, such as a potential increase in tariffs, might arise due to the inclusion of the investment costs in tariffs.

5a. Where duly justified by the complexity of the project or the need for additional cross-border data, the relevant national regulatory authorities may extend the period referred to in paragraph 5 once by up to three months provided that they inform the Agency without delay, stating the reasons for that extension.

6. In allocating the costs, the relevant national regulatory authorities shall take into account the following:

(a) actual or estimated congestion rents or other charges;

(b) actual or estimated revenues stemming from the inter-transmission system operator compensation mechanism established under Article 49 of Regulation (EU) 2019/943.

The allocation of costs across borders shall take into account, the economic, social and environmental costs and benefits of the projects in the Member States concerned and the need to ensure a stable financing framework for the development of projects of common interest while minimising the need for financial support. In allocating costs across borders, the relevant national regulatory authorities, after consulting the TSOs concerned, shall seek a mutual agreement based on, but not limited to, the information specified in paragraph 4, first subparagraph, points (a) and (b), of this Article. Their assessment shall be based on the Union strategic scenario and any sensitivities referred to in Article 11, allowing a robust analysis of the contribution of the project of common interest to the Union energy policy of decarbonisation, market integration, competition, sustainability and security of supply.

7. In allocating the costs, the relevant national regulatory authorities shall apply the following general principles:

(a) where at least 10 % of the estimated benefits of a project occur in a Member State, that Member State involved directly or indirectly in interconnected projects and the relevant national regulatory authority shall take part in the cross-border cost-allocation process;

(b) where appropriate, the allocation of costs among the Member States shall be based on the distribution of net benefits, ensuring that the cost-allocation key reflects that distribution;

(c) the cross-border cost allocation shall be based on an ex-ante cost-allocation agreement designed to ensure investment certainty, whereas the agreement shall be transparent and predictable and the cross-border cost-allocation may provide for the possibility of ex-post adjustments, provided that such adjustments are explicitly defined in the cost allocation decision and clearly framed, including as regards timeframes and categories of costs covered;

(ca) in the case of offshore hybrid projects where a project integrates both a hybrid interconnector and an offshore renewable joint project, the cross-border cost-allocation shall be based on a uniform cross-border cost-allocation methodology that takes into consideration both infrastructure and generation assets for offshore hybrid projects.

Where a project of common interest mitigates negative externalities, such as loop flows, and that project of common interest is implemented in the Member State at the origin of the negative externality, such mitigation shall not be regarded as a cross-border benefit and shall therefore not constitute a basis for allocating costs to the TSO of the Member States affected by those negative externalities.

8. The relevant national regulatory authorities shall, on the basis of the cross-border cost allocation referred to in paragraph 5 of this Article, take into account actual costs incurred by a TSO, DSO, HNO or other project promoter as a result of the investments when fixing or approving tariffs in accordance with Article 78(1) of Directive (EU) 2024/1788 and Article 59(1), point (a), of Directive (EU) 2019/944, insofar as those costs correspond to those of an efficient and structurally comparable operator.

9. The relevant national regulatory authorities shall notify the cost allocation decision to the Agency, without delay, together with all the relevant information with respect to that decision. In particular, the cost allocation decision shall set out detailed reasons for the allocation of costs among Member States, including the following:

(a) an evaluation of the identified impact on each of the concerned Member States, including those concerning network tariffs;

(b) an evaluation of the business plan referred to in paragraph 4, first subparagraph, point (b);

(c) regional or Union-wide positive externalities, such as security of supply, system flexibility, solidarity or innovation, which the project would generate;

(d) the result of the consultation of the project promoters concerned.

The cost allocation decision shall be published on the websites of the relevant

national regulatory authorities and shared with Agency and the Commission.

By [within 6 months of entry into force], the Agency shall establish a central

repository of all cross-border cost-allocation decisions taken by national regulatory

authorities and host it on its website.

9a. By … [24 months from the date of entry into force of this Regulation], and at least every two years thereafter, the Agency may publish a report monitoring the cross-border cost allocation decisions. Project promoters, regulatory authorities and the transmission system operators of the concerned Member States shall provide to the Agency the information necessary for the purpose of carrying out the Agency’s task under this Article.

10. Where the relevant national regulatory authorities have not reached an agreement on the investment request within six months of the date on which the request was received by the last of the relevant national regulatory authorities, they shall inform the Agency without delay.

In that case, or upon a joint request from the relevant national regulatory authorities, the decision on the investment request including cross-border cost allocation referred to in paragraph 5 shall be taken by the Agency within three months of the date of referral to the Agency.

Before taking such a decision, the Agency shall consult the relevant national regulatory authorities and the project promoters. The three-month period referred to in the second subparagraph may be extended by an additional period of two months where further information is sought by the Agency. That additional period shall begin on the day following receipt of the complete information.

The assessment of the Agency shall be based on the Union strategic scenario established under Article 11 and any sensitivities, allowing a robust analysis of the contribution of the project of common interest to the Union energy policy targets of decarbonisation, market integration, competition, sustainability and security of supply.

The Agency, in its decision on the investment request including cross-border cost allocation, shall leave the determination of the way the investment costs are included in the tariffs in accordance with the cross-border cost allocation prescribed, to the relevant national authorities at the time of the implementation of that decision in accordance with national law.

The decision on the investment request including cross-border cost allocation shall be published. Article 25(3) and Articles 28 and 29 of Regulation (EU) 2019/942 shall apply.

11. A copy of all cost allocation decisions, together with all the relevant information with respect to each decision, shall be notified, without delay, by the Agency to the Commission. The Agency shall publish non-confidential versions of all decisions on its website. That information may be submitted in aggregate form. The Agency and the Commission shall preserve the confidentiality of commercially sensitive information.

12. Cost allocation decisions shall not affect the right of TSOs and HTNOs to apply and of national regulatory authorities to approve charges for access to networks in accordance with Regulations (EU) 2019/943 and (EU) 2024/1789 and Directives (EU) 2019/944 and (EU) 2024/1788.

13. This Article shall not apply to projects of common interest which benefit from one or more of the following:

(a) an exemption from Articles 31, 32, 33 and Articles 78(7) and Directive (EU) 2024/1788, pursuant to Article 78 of Regulation (EU) 2024/1789;

(b) an exemption from Article 19(2) and (3) of Regulation (EU) 2019/943 or Article 6, Article 59(7) and Article 60(1) of Directive (EU) 2019/944, pursuant to Article 63 of Regulation (EU) 2019/943;

(c) a derogation from unbundling or third-party access rules, pursuant to Article 17 of Regulation (EC) No 714/2009 of the European Parliament and of the Council or to Article 64 of Regulation (EU) 2019/943 and Article 66 of Directive (EU) 2019/944.

14. By [six months after entry into force of this Regulation], the Agency shall adopt a recommendation for identifying good practices for the treatment of investment requests for projects of common interest in accordance with the principles referred to in paragraph 7 of this Article.

That recommendation shall be regularly updated by the Agency as necessary. It shall take account of sectorial specificities, and shall ensure consistency with the principles on the offshore grids for renewable energy cross-border cost sharing as referred to in Article 16(1). In adopting or updating the recommendation, the Agency shall carry out an extensive consultation process, involving all relevant stakeholders. That recommendation shall also include a non-binding cross-border cost-allocation template to facilitate the work of national regulatory agencies.

15. Projects of mutual interest shall obtain a cross-border cost allocation under the same rules and conditions referred to in this Article as regards the benefits they bring for the Union. It shall be issued in a coordinated manner by the relevant national regulatory authorities of the benefiting Member States.

16. This Article shall apply mutatis mutandis to project bundles under Article 18.

16a. A cross-border cost allocation decision pursuant to this Article shall not be required where, on the basis of a project-specific cost-benefit analysis, the project provides net benefits to all affected Members States. Union financial assistance for works can be requested and granted without a cross-border cost allocation decision in the case of projects falling under point (2) of Annex II.

Article 18 Enabling energy infrastructure projects bundling for the purpose of cost-sharing and permitting

1. Project promoters may bundle two or more projects on the Union list to facilitate the discussions on cost-sharing and permitting between the relevant Member States and third countries, as appropriate, and the cross-border cost-allocation decisions between the concerned competent authorities of the Member States or between the competent authorities of the Member States and third countries, as appropriate. As regards project bundles, cost-benefit analysis and cost-sharing proposals may be assessed per bundle in an appropriate regional process among relevant Member States, their regulatory authorities and under involvement of relevant TSOs, as a basis for the cross-border cost-allocation decisions of the bundle.

2. The Commission may invite project promoters to submit a proposal for one or several bundles of two or more projects on the Union list to the relevant Groups for discussion. Project promoters are encouraged to jointly assess the benefits of bundling projects from the beginning of the project development process. That assessment may also be used in the application process for projects of common interest or project of mutual interest status as referred to in Article 3. A project bundle may include projects at different stages of maturity, provided that their bundling does not delay the implementation of the most mature projects.

3. Following the discussions in the Groups, the Commission may request the ENTSO for Electricity or the ENNOH to provide a common cost-benefit analysis for the proposed bundles of two or more projects on the Union list. The common cost-benefit analysis shall be consistent with the Union strategic scenario and sensitivities referred to under Article 11, and the methodology drawn up pursuant to Article 15. The ENTSO for Electricity or the ENNOH shall provide the common cost-benefit analysis within 2 months of the request to the Commission.

4. The relevant Member States, with the involvement of the relevant national regulatory authorities, and with the support of the Commission, shall conclude on the bundle of projects and, where appropriate, invite project promoters to add projects to the bundle or delete projects from the bundle, if this facilitates discussions on cost-sharing, provided that the number of projects on the Union list included in the bundle remains manageable.

5. The relevant Member States may decide to endorse the bundles and invite project promoters to submit a joint investment request under Article 17(4). That decision shall be shared with the relevant Groups and the Commission. For the purpose of Article 17(4), only one up-to-date cost-benefit analysis and one proposal for a cross-border cost-allocation shall be included in the investment request in view of facilitating a possible application for Union financial assistance pursuant to Article 21.

Article 19 Ring-fenced congestion income for projects on the Union list

1. TSOs shall set aside 30 % of the congestion rents not allocated for guaranteeing the actual availability of the allocated capacity pursuant to Article 19(2), point (a), of Regulation (EU) 2019/943 and for compensation to offshore renewable electricity generation plant operators pursuant to Article 19(2), point (c), of Regulation (EU) 2019/943, for network investments into projects on the Union list relevant to reducing interconnector congestion pursuant Article 19(2), point (b), of Regulation (EU) 2019/943. Congestion rents arising from internal bidding zone borders within a Member State shall not be subject to the obligations laid down in this paragraph.

2. TSOs shall place the funds referred to in point 1 of this Article on a separate account line until it can be spent for financing projects on the Union list relevant to reducing interconnector congestion, or until they have demonstrated that the priority objectives set out in Article 19(2), point (b), of Regulation (EU) 2019/943 have been adequately fulfilled and there is no need for additional cross-border capacity to be built at the borders of the Member States concerned to reduce interconnector congestion. Funds already allocated to the separate internal account line before … [the date of entry into force of this Regulation] shall be considered to fall outside the scope of this Article.

3. The use of the funds referred to in paragraph 1 shall be timely and shall:

(a) address the financing gap of projects on the Union list which are located in the Member State where congestion revenue is collected and have significant benefits outside their hosting countries, taking due account of expected tariff financing;

(aa) address the financial gap of infrastructure projects which enhance infrastructure flexibility of the whole Union energy system;

(ab) be determined in advance by transmission system operators and their actual use shall be reported to the national regulatory authorities in accordance with Article 19(5) of Regulation (EU) 2019/943;

(b) be made transparent in requests for cross-border cost allocation decisions pursuant to Article 17 of this Regulation;

(c) avoid double funding and ensure proportionality, transparency and non-discrimination;

(d) not compromise the fulfilment of the priority objectives under Article 19(2) of Regulation (EU) 2019/943;

(da) support, where appropriate, bundles of projects pursuant to Article 18 of this Regulation for the purpose of reducing congestion more efficiently at corridor level.

4. The Commission is empowered to adopt delegated acts in accordance with Article 23 of this Regulation to supplement this Regulation by specifying the conditions under which TSOs may use the funds referred to in paragraph 1 of this Article and the conditions under which the objective of Article 19(2), point (b), of Regulation (EU) 2019/943 is considered adequately fulfilled.

5. Within [6 months] after the entry into force of the delegated acts referred in paragraph 4, the Agency shall update the methodology on the use of revenues from congestion income pursuant to Article 19(4) of Regulation (EU) 2019/943. The updated methodology shall be consistent with paragraphs 1, 2 and 3 of this Article and with the delegated acts adopted pursuant to paragraph 4 of this Article.

5a. By 31 October … [1 year from the date of entry into force of this Regulation], and every year thereafter, the Agency, taking into account the reports pursuant to Article 19(5) of Regulation (EU) 2019/943, shall publish and submit to the Commission a report assessing the use of congestion income pursuant to this Article. The report shall cover the 12-month period ending on 31 December of the previous year. Where appropriate, the Agency may include in the report recommendations to ensure that the congestion income is used in accordance with the conditions laid down in the methodology referred to in Article 19(4) of Regulation (EU) 2019/943 for the purpose of this Article. The regulatory authorities and the TSOs shall provide to the Agency the information necessary for the purpose of carrying out the Agency’s task under this Article.

Article 20 Regulatory incentives

1. Where a project promoter incurs higher risks for the development, construction, operation or maintenance of a project of common interest falling under the competence of national regulatory authorities, when compared to the risks normally incurred by a comparable infrastructure project, national regulatory authorities may grant appropriate incentives to that project in accordance with Regulations (EU) 2019/943 and 2024/1789 and Directives (EU) 2019/944 and (EU) 2024/1788.

The first subparagraph shall not apply where the project of common interest benefits from one or more of the following:

(a) an exemption from Articles 31, 32, and 33, and Articles 78(7) and (9) of Directive (EU) 2024/1788, pursuant to Article 78 of Regulation (EU) 2024//1789;

(b) an exemption from Article 19(2) and (3) of Regulation (EU) 2019/943 or from Article 6, Article 59(7) and Article 60(1) of Directive (EU) 2019/944 pursuant to Article 63 of Regulation (EU) 2019/943;

(c) an exemption pursuant to Article 36 of Directive 2009/73/EC;

(d) a derogation pursuant to Article 17 of Regulation (EC) No 714/2009.

2. In the case of a decision to grant the incentives referred to in paragraph 1 of this Article, national regulatory authorities shall consider the results of the cost-benefit analysis consistent with the methodology drawn up pursuant to Article 14 and in particular the regional or Union-wide positive externalities generated by the project. The national regulatory authorities shall further analyse the specific risks incurred by the project promoters, the risk mitigation measures taken and the reasons for the risk profile in view of the net positive impact provided by the project, when compared to a lower-risk alternative. Eligible risks shall in particular include risks related to new transmission technologies, both onshore and offshore, risks related to under-recovery of costs and development risks.

3. The decision to grant the incentives shall take into account the specific nature of the risk incurred and may grant incentives covering, inter alia, one or more of the following measures:

(a) the rules for anticipatory investment;

(b) the rules for recognition of efficiently incurred costs before commissioning of the project;

(c) the rules for providing additional return on the capital invested for the project;

(d) any other measure deemed necessary and appropriate.

CHAPTER VII

Financing

Article 21 Eligibility of projects for Union financial assistance under Regulation (EU) 2021/1153

1. Projects of common interest falling under the energy infrastructure categories set out in Article 27 and Annex II shall be eligible for Union financial assistance in the form of grants for studies and financial instruments.

2. Projects of common interest falling under the energy infrastructure categories set out in Article 27 and in points (1)(a), (b), (c), (d), (e), (f) and (h) and point (2) of Annex II and under the competence of national regulatory authorities shall also be eligible for Union financial assistance in the form of grants for works where they fulfil all of the following criteria:

(a) the project specific cost-benefit analysis drawn up pursuant to Article 17(4), point (a), provides evidence concerning the existence of significant positive externalities, such as security of supply, system flexibility, solidarity or innovation;

(b) the project has received a cross-border cost allocation decision pursuant to Article 17, subject to paragraphs 2a and 2b of this Article and the exceptions specified in Article 17(16a);

(c) the project cannot be financed by the market or through the regulatory framework in accordance with the business plan and other assessments, in particular those carried out by potential investors, creditors or the national regulatory authority, taking into account any decision on incentives and reasons referred to in Article 20(2) when assessing the project’s need for Union financial assistance.

2a. Projects of common interest falling under the energy infrastructure categories set out in point (2) of Annex II may apply for financial support from designated Union funds and may benefit from a European guarantee. The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Regulation by establishing an EU-level de-risking and financing mechanism for cross-border hydrogen transport infrastructure. Those delegated acts shall lay down the necessary framework for the operation of the mechanism, ensure its integration with existing Union regulatory and funding frameworks, including InvestEU, and specify the eligibility criteria and conditions for the participation of hydrogen infrastructure projects in the EU-level de-risking mechanism, as well as the applicable budgetary framework. The mechanism shall apply on a non-discriminatory basis to all cross-border hydrogen infrastructure projects falling under the energy infrastructure categories set out in point (2) of Annex II, ensuring equal treatment of network operators with regard to the risks associated with investments in cross-border hydrogen infrastructure. Before adopting the delegated acts, the Commission shall consult ENNOH, the Agency and other relevant stakeholders. For the avoidance of doubt, compliance with the criterion laid down in paragraph 2, point (b), of this Article shall not be required for a project to apply for support under the Union-level de-risking mechanism backed by a Union guarantee. The Commission shall adopt the first of those delegated acts by … [12 months from the date of entry into force of this Regulation].

2b. In the case of projects falling under the energy infrastructure categories set out in point (2) of Annex II where the cross-border cost-allocation process is still ongoing, the project promoter may request Union financial assistance for works on a conditional basis, subject to the finalisation and adoption of the cross-border cost-allocation decision.

3. Projects of common interest carried out in accordance with the procedure referred to in Article 5(7), point (d), shall also be eligible for Union financial assistance in the form of grants for works where they fulfil the criteria set out in paragraph 2 of this Article.

4. Projects of common interest falling under the energy infrastructure categories set out in Annex II other than those referred to in paragraph 2, with the exception of the infrastructure category set out in point (3) of that Annex shall also be eligible for Union financial assistance in the form of grants for works where they fulfil all of the following criteria:

(a) the project specific cost-benefit analysis drawn up by the project promoter in application of the relevant cost-benefit analysis methodology developed in accordance with Article 11 provides evidence concerning the existence of significant positive externalities, such as security of supply, system flexibility, solidarity or innovation;

(b) the project cannot be financed by the market in accordance with the business plan drawn-up by the project promoter and other assessments, in particular those carried out by potential investors, creditors or the national regulatory authority;

(c) the project has received an evaluation carried out by the relevant national authority or, where applicable, the national regulatory authority, in consultation with the TSOs or relevant DSOs from the Member States where the project provides a significant net positive impact, that clearly demonstrates the existence of significant positive externalities, such as security of supply, system flexibility, solidarity or innovation, generated by the project and include an evaluation thereof, and provides clear evidence of their lack of commercial viability, in accordance with the cost-benefit analysis, the business plan and assessments carried out by the project promoter and potential investors or creditors and, where applicable, a national regulatory authority.

5. The evaluation referred to in paragraph 4, point (c), of this Article shall be based on the scenario and, if appropriate, sensitivities established under Article 11 and any existing sensitivity analyses thereof and shall include an accurate evaluation and assessment of the efficiently incurred costs, an accurate description of the benefits of the project including their split across borders for individual Member States or third countries including non-hosting countries, a description of the split of costs across-borders and of all financing sources relevant for the project and already certain.

5a. Projects of common interest falling under the energy infrastructure category set out in point (1)(c) of Annex II and located in peripheral and island Member States, which do not provide direct benefits to non-hosting countries, shall remain eligible for Union financial assistance, provided that they have a significant cross-border impact as set out in point (1) of Annex IV.

6. This Article shall apply mutatis mutandis to projects of mutual interest and bundles of projects pursuant to Article 18.

Projects of mutual interest shall be eligible for Union financial assistance under conditions set out in Regulation (EU) 2021/1153. With regard to grants for works, projects of mutual interest shall be eligible for Union financial assistance provided that they fulfil the criteria set out in paragraph 2 or 4 of this Article, as applicable, and where the project contributes to the Union’s overall energy and climate policy objectives.

6a. Grants for works covering projects of common interest and projects of mutual interests shall also cover digitalisation projects with high operational expenditure, where such projects demonstrably contribute to the objectives of this Regulation.

6b. Electricity infrastructure projects located in the outermost regions within the meaning of Article 349 TFEU shall be eligible for Union financial assistance in the form of grants for works under Regulation (EU) 2021/1153, including projects at distribution level, where they contribute to the development, reinforcement, resilience or efficient operation of the transmission network, provided that the following conditions are met:

(a) the project contributes to one or more of the following objectives in the outermost region concerned:

(i) the integration of renewable or low-carbon energy sources into the local electricity network;

(ii) the reduction of dependence on fossil fuels for electricity generation;

(iii) the security of electricity supply, including through diversification of generation sources or modernisation of distribution infrastructure;

(iv) the electrification of end-use sectors, in particular transport and heating;

(b) the project cannot be financed by the market or through the applicable regulatory framework, having regard to the structural energy isolation of the region, the limited local market size and the constrained capacity of operators to recover investment costs through network tariffs;

(c) the relevant Member State has carried out an assessment demonstrating the necessity of the project for the energy transition and security of supply of the outermost region concerned, taking into account the specific structural constraints recognised under Article 349 TFEU.

Member States shall ensure that the investment needs of outermost regions

identified pursuant to this paragraph are duly reflected in their NRPP.

Article 21a Eligibility of projects under financial assistance other than Union financial assistance under Regulation (EU) 2021/1153

Member States shall assess electricity network capacity and constraints, including at

distribution level, and identify corresponding investment needs. For projects on distribution

level that are not eligible for funding under Regulation (EU) 2021/1153, Member States

shall consider assistance under a Regulation of the European Parliament and of the

Council establishing the European Fund for economic, social and territorial cohesion,

agriculture and rural, fisheries and maritime, prosperity and security for the period 2028-

2034 [COM(2025)0565 - 2025/0240(COD)]. Where grid constraints are identified,

investments in electrification - renewable energy or demand shall be accompanied by

adequate investment in electricity networks. This also applies to outermost regions within

the meaning of Article 349 TFEU, which face structural energy isolation from the

European grid. Member States shall ensure that the specific investment needs of outermost

regions in electricity infrastructure are duly taken into account when defining their

National and Regional Partnership Plans.

Article 22 Guidance for the award criteria of Union financial assistance

The specific criteria set out in Article 4(3) of this Regulation and the parameters set out in

Article 4(5) of this Regulation shall apply for the purpose of establishing award criteria for

Union financial assistance under Regulation (EU) 2021/1153. For projects of common interest

falling under Article 27 of this Regulation, in addition to the requirements provided by Article

21(2), the criteria of market integration, security of supply, competition and sustainability

shall apply.

Where the implementation of a project of common interest referred to in Annex I faces a

persistent delay in excess of 18 months, due to a lack of regulatory or administrative

approval which is primarily attributable to one hosting Member State, the remaining host

Member State(s) affected by that delay shall be granted priority status in the evaluation of

other applications for Union financial assistance for projects of common interest related to

both Annex I and Annex II.

That priority status shall be composed of a weighting premium during the award criteria

scoring phase. The cumulative financial assistance granted under this preferential

framework to the co-operating Member State(s) shall be capped at, and shall not exceed,

the total financial allocation or estimated Union contribution initially provisioned for the

delayed cross-border project.

CHAPTER VIII

Final provisions

Article 23 Exercise of the delegation

1. The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article.

2. The power to adopt delegated acts referred to in Article 3(4), Article 11(6), Article 19(4) and Article 21(2a) shall be conferred on the Commission for a period of seven years from 23 June 2027. The Commission shall draw up a report in respect of the delegation of power not later than nine months before the end of the seven-year period. The delegation of power shall be tacitly extended for periods of an identical duration, unless the European Parliament or the Council opposes such extension not later than three months before the end of each period.

3. The delegation of power referred to in Article 3(4), Article 11(6), Article 19(4) and Article 21(2a) may be revoked at any time by the European Parliament or by the Council. A decision to revoke shall put an end to the delegation of the power specified in that decision. It shall take effect the day following the publication of the decision in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated acts already in force.

4. Before adopting a delegated act, the Commission shall consult experts designated by each Member State in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making.

5. As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council.

6. A delegated act adopted pursuant to Article 3(4), Article 11(6), Article 19(4) and Article 21(2a) shall enter into force only if no objection has been expressed either by the European Parliament or the Council within a period of two months of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by two months at the initiative of the European Parliament or of the Council.

Article 24 Reporting and evaluation

By 30 June 2032, the Commission shall publish a report on the implementation of projects on

the Union list and submit it to the European Parliament and the Council. That report shall

provide an evaluation of:

(a) the progress achieved in the planning, development, construction and commissioning of projects on the Union list, and, where relevant, delays in implementation and other difficulties encountered;

(b) the funds engaged and disbursed by the Union for projects on the Union list, compared to the total value of funded projects on the Union list;

(c) the progress achieved in terms of integration of renewable energy sources, including offshore renewable energy sources, and reduced greenhouse gas emissions through the planning, development, construction and commissioning of projects on the Union list;

(d) for the electricity and hydrogen sectors, the evolution of the interconnection level between Member States, and the corresponding evolution of energy prices;

(e) the permit-granting process and public participation, in particular:

(i) the average and maximum total duration of the permit-granting process for projects on the Union list, including the duration of each step of the pre-application procedure, compared to the timing foreseen by the initial major milestones referred to in Article 10(9);

(ii) best and innovative practices with regard to stakeholder involvement;

(iii) best and innovative practices with regard to mitigation of environmental impacts, including climate adaptation, during permit-granting processes and project implementation;

(iv) the effectiveness of the schemes provided for in Article 8(3) regarding compliance with the time limits set in Article 10(1) and (2);

(v) the rate of digitalisation of permitting procedures;

(f) regulatory treatment, in particular:

(i) the number of projects of common interest, or bundles of projects, having been granted a cross-border cost allocation decision pursuant to Article 17;

(ii) the number and type of projects of common interest which received specific incentives pursuant to Article 20;

(g) the effectiveness of this Regulation in contributing to the Union targets for energy and climate and the achievement of climate neutrality by 2050 at the latest;

(h) the improvement of physical and cyber security resilience of cross-border energy infrastructure;

(i) the uptake of non-wire solutions in terms of number of projects and respective increase in grid capacity.

Article 25 Review

By 30 June 2033, the Commission shall carry out a review of this Regulation, on the basis of

the results of the reporting and evaluation provided for in Article 24 of this Regulation, as

well as the monitoring, reporting and evaluation carried out pursuant to Articles 22 and 23 of

Regulation (EU) 2021/1153.

As part of that review, the Commission shall assess the need for, and feasibility of,

establishing an Independent European System Planner under this Regulation. That

assessment shall examine, in particular, whether such a body is to be established as a

permanent and independent entity at Union level, acting in the public interest and entrusted

with tasks relating to integrated energy system planning, including the development of

Union strategic scenario, contribution to energy system-wide cost-benefit analysis and

cross-border cost allocation, and the provision of an opinion on the Union list of projects of

common interest and projects of mutual interest. The Commission shall also assess the

appropriate mandate, governance, independence safeguards, consultation and public

participation requirements, and possible role of such a body in Union-level network

planning and operation, with a view to supporting the achievement of the Union’s climate

and energy objectives and climate neutrality by 2050 at the latest.

Article 26 Information and publicity

The Commission shall establish and maintain a transparency platform easily accessible to the

general public through the internet. The platform shall be regularly updated with information

from: the reports referred to in Article 5(4); the website referred to in Article 9(7); and direct

information from the project promoters as regards projects no longer on the Union list. The

platform shall contain the following information:

(a) general, updated information, including geographic information, for each project on the Union list;

(b) the implementation plan as set out in Article 5(1) for each project on the Union list, presented in a manner that allows the assessment of the progress in implementation at any time;

(c) the main expected benefits and contribution to the objectives referred to in Article 1(1) and the costs of the projects except for any commercially sensitive information;

(d) the Union list;

(e) the funds allocated and disbursed by the Union for each project on the Union list;

(f) the links to the national manual of procedures referred to in Article 9;

(g) information and status updates as regards projects that were on the Union list, but are no longer included.

Article 27 Derogation for interconnections for Cyprus and Malta

1. In the case of Cyprus and Malta, which are not interconnected to the trans-European gas network, a derogation from Article 3, Article 4(1), points (a) and (b), Article 4(5), and Annexes I, II and III shall apply. One interconnection for each of those Member States shall maintain its status of project of common interest under this Regulation with all relevant rights and obligations, where that interconnection:

(a) was under development or planning on 23 June 2022;

(b) has been granted the status of project of common interest under Regulation (EU) No 347/2013 of the European Parliament and of the Council;

(c) is necessary to secure permanent interconnection of those Member States to the trans-European gas network.

Those projects shall ensure the future ability to access new energy markets, including hydrogen.

2. The project promoters shall provide sufficient evidence of how the interconnections referred to in paragraph 1 will allow access to new energy markets, including hydrogen, in accordance with the Union’s overall energy and climate policy objectives. Such evidence shall include an assessment of the supply and demand for renewable or low-carbon hydrogen as well as a calculation of the greenhouse gas emissions reduction enabled by the project.

The Commission shall regularly verify that assessment and that calculation, as well as the timely implementation of the project.

3. In addition to the specific criteria set out in Article 21 for Union financial assistance, the interconnections referred to in paragraph 1 shall be designed in view of ensuring access to future energy markets, including hydrogen, shall not lead to a prolongation of the lifetime of natural gas assets and shall ensure the interoperability of neighbouring networks across borders. Any eligibility for Union financial assistance under Article 21 shall end on 31 December 2027.

4. Any request for Union financial assistance for works shall clearly demonstrate the aim to convert the asset into a dedicated hydrogen asset by 2036 if market conditions allow, by means of a roadmap with a precise timeline.

5. The derogation set out in paragraph 1 shall apply until Cyprus or Malta, respectively, is directly interconnected to the trans-European gas network or until 31 December 2029, whichever is the earlier.

Article 28 Amendments to Regulation (EU) 2019/942

Regulation (EU) 2019/942 is amended as follows:

(1) in Article 3(2), the first subparagraph is replaced by the following:

‘At ACER’s request, the regulatory authorities, the ENTSO for Electricity, the ENTSO for

Gas, the ENNOH, the regional coordination centres, the EU DSO Entity, the transmission

system operators, hydrogen network operators, the nominated electricity market operators,

and entities established by transmission system operators for natural gas, LNG system

operators, natural gas storage system operators or hydrogen storage operators or hydrogen

terminal operators shall provide to ACER the information in the same level of detail

necessary for the purpose of carrying out ACER’s tasks under this Regulation, unless ACER

has already requested and received such information.’

(2) in Article 11, points (c) and (d) are replaced by the following:

‘(c) carry out the obligations laid out in Articles 5, 11, 12, 14, 17 of Regulation (EU) …/… of

the European Parliament and of the Council* [the TEN-E Regulation as proposed by

COM(2025)xxxx] and in Section 2, point (8), of Annex III to that Regulation;

(d) take decisions on investment requests including cross-border cost allocation pursuant to

Article 17(9) of Regulation (EU) …/… [the TEN-E Regulation as proposed by

COM(2025)xxxx].

___________

* Regulation (EU) …/… of the European Parliament and of the Council [the TEN-E Regulation as proposed by COM(2025)xxxx] (OJ…, ELI: …)’

Article 29 Amendments to Regulation (EU) 2019/943

Article 48 ▌is replaced by the following:

‘Article 48

Ten-year network development plan

1. The Union-wide network development plan referred to under Article 30(1), point (b), of this Regulation shall be based on the Union strategic scenario and the identification of system needs report pursuant to Articles 11 and 12 of Regulation (EU) …/… of the European Parliament and of the Council* [the TEN-E Regulation as proposed by COM(2025)xxxx] and shall include the modelling of the integrated network and an assessment of the resilience of the system. Relevant input parameters for the modelling of the Union strategic scenario, such as assumptions on fuel and carbon prices or installation of renewables, and assumptions for the European resource adequacy assessment developed pursuant to Article 23 of this Regulation should be consistent to the extent possible.

The Union-wide network development plan shall, in particular:

(a) build on projects of cross-border relevance included in national ten-year network development plans and national investment plans, taking into account regional investment plans as referred to in Article 34(1) of this Regulation, and be based on Union aspects of network planning as set out in Regulation (EU) …/… [the TEN-E Regulation as proposed by COM(2025)xxxx]; it shall be subject to a cost-benefit analysis using the methodology established in Article 14 of that Regulation;

(b) consider with priority alternatives to network expansion, such as non-wire solutions pursuant to Regulation (EU) …/… [the TEN-E Regulation as proposed by COM(2025)xxxx] or non-fossil low-emission flexibility;

(c) regarding cross-border interconnections and system resilience, also build on the reasonable needs of different system users, protection of critical infrastructure elements and integrate long-term commitments from investors referred to in Articles 44 and 51 of Directive (EU) 2019/944;

(d) identify investment gaps, in particular with respect to cross-border capacities.

In regard to the second subparagraph, point (d), a review of barriers to the increase of

cross-border capacity of the network arising from different approval procedures or

practices may be annexed to the Union–wide network development plan.

2. ACER shall provide an opinion on the national ten-year network development plans to assess their consistency with the Union–wide network development plan, including compliance with requirements of Article 3(6) and (7) of Regulation (EU) …/… [the TEN-E Regulation as proposed by COM(2025)xxxx]. If ACER identifies inconsistencies between a national ten-year network development plan and the Union–wide network development plan, it shall recommend amending the national ten-year network development plan or the Union–wide network development plan as appropriate by three months upon its receipt. If such a national ten-year network development plan is developed in accordance with Article 40a of Directive (EU) 2019/944, ACER shall recommend that the regulatory authority amend the national ten-year network development plan in accordance with Article 40a(7) of that Directive and inform the Commission thereof.

___________

* Regulation (EU) …/… of the European Parliament and of the Council [the TEN-E Regulation as proposed by COM(2025)xxxx] (OJ…, ELI: …)’

1a. In Article 49, paragraph 4 is replaced by the following:

‘4. The Commission shall adopt delegated acts in accordance with Article 68, supplementing this Regulation, to update the amounts of compensation payments payable, after having consulted ACER. The Commission shall adopt the first of those delegated acts by … [six months from the date of the entry into force of Regulation (EU) …/… [the TEN-E Regulation 2025/0399(COD)]]. Where necessary, those delegated acts shall be updated regularly, taking into account developments in the energy markets.’.

Article 30 Amendments to Regulation (EU) 2024/1789

Regulation (EU) 2024/1789 is amended as follows:

(-1) In the second paragraph of Article 32, the following point is added:

‘(ca) assess the impact of repurposing, as defined in Article 2, point [17/18], of Regulation (EU) …/… [TEN-E Regulation], or other infrastructure developments, especially concerning security of supply and the sustainability of the whole energy system; that assessment shall take into consideration the relevant repurposing criteria.’;

(1) Article 60 is replaced by the following:

‘Article 60 Union-wide network development plan for hydrogen

1. The Union-wide network development plan for hydrogen shall be based on the Union Strategic scenario and the identification of system needs report pursuant to Articles 11 and 12 of Regulation (EU) …/… of the European Parliament and of the Council* [the TEN-E Regulation as proposed by COM(2025)xxxx] and shall include the modelling of the integrated hydrogen network, a European supply adequacy outlook and an assessment of the resilience of the system.

The Union-wide network development plan for hydrogen shall, in particular:

(a) build on the national hydrogen transmission network development plans as laid down in Article 55 of Directive (EU) 2024/1788 and be based on Union aspects of network planning as set out in Regulation (EU) …/… [the TEN-E Regulation as proposed by COM(2025)xxxx];

(b) regarding cross-border interconnections, build on the reasonable needs of different network users and integrate long-term commitments from investors as referred to in Article 55(7) of Directive (EU) 2024/1788;

(c) identify investment gaps, in particular with respect to the necessary cross-border capacities, to implement the priority corridors for hydrogen and electrolysers as referred to in point 3 of Annex I to Regulation (EU) …/… [the TEN-E Regulation as proposed by COM(2025)xxxx].

With regard to the second subparagraph, point (c), a review of barriers to the increase of cross-border capacity of the network arising from different approval procedures or practices may be annexed to the Union-wide network development plan for hydrogen. Such a review may be accompanied, where appropriate, by a comprehensive plan to remove such barriers and accelerate the implementation of the priority corridors for hydrogen and electrolysers.

2. ACER shall provide an opinion on the national hydrogen transmission network development plans where relevant to assess their consistency with the Union-wide network development plan for hydrogen including compliance with requirements of Article 3(6) and (7) of Regulation (EU) …/… [the TEN-E Regulation as proposed by COM(2025)xxxx]. If ACER identifies inconsistencies between a national hydrogen transmission network development plan and the Union-wide network development plan for hydrogen, it shall recommend amending the national hydrogen transmission network development plan or the Union-wide network development plan for hydrogen as appropriate, no later than three months after receiving the national hydrogen transmission network development plan.

3. When developing the Union-wide network development plan for hydrogen, the ENNOH shall cooperate with the ENTSO for Electricity and with the ENTSO for Gas, in particular on the development of the energy system wide cost-benefit analysis referred to in Article 14 of Regulation (EU) …/… [the TEN-E Regulation as proposed by COM(2025)xxxx], and the infrastructure gaps identification referred to in Article 13 of that Regulation.

___________

* Regulation (EU) …/… of the European Parliament and of the Council … [the TEN-E Regulation as proposed by COM(2025)xxxx] (OJ…, ELI: …)’

(2) Article 61 is replaced by the following:

‘Article 61 Union-level integrated network planning

1. During the transitional period until 1 January 2027, the ENTSO for Gas shall develop the 2026 Union-wide network development plan for hydrogen, with the full involvement of hydrogen transmission network operators and together with the ENNOH as soon as it is established. The 2026 Union-wide network development plan for hydrogen shall consist of two separate chapters, one for hydrogen and one for natural gas. The ENTSO for Gas shall without delay transfer to the ENNOH all the information, including data and analyses it collected during the preparation of the Union-wide network development plans for hydrogen by 1 January 2027.

2. The ENNOH shall develop the 2028 Union-wide network development plan for hydrogen pursuant to this Article and Article 60.

3. The ENNOH shall cooperate closely with the ENTSO for Electricity and the ENTSO for Gas to develop integrated Union-wide network development plans pursuant to Articles 32 and 60 of this Regulation and to Article 30 of Regulation (EU) 2019/943 respectively.

4. Where decisions need to be made to ensure system efficiency as defined in Article 2, point (4), of Directive (EU) 2023/1791 of the European Parliament and of the Council across energy-carriers the Commission shall ensure that the ENTSO for Electricity, the ENTSO for Gas and the ENNOH cooperate closely.

5. The ENNOH, the ENTSO for Electricity and the ENTSO for Gas shall cooperate in an efficient, inclusive and transparent manner, they shall facilitate taking decisions by consensus and they shall develop the necessary working arrangements for the purpose of enabling such cooperation and ensuring their fair representation.

The ENNOH, together with the ENTSO for Electricity and the ENTSO for Gas, may establish working groups to fulfil its obligations pursuant to the first subparagraph, points (a), (b) and (d) and shall ensure fair and equal representation of the hydrogen, electricity and gas sectors in the working groups.’.

Article 31 Transitional provisions

1. This Regulation shall not affect the granting, continuation or modification of financial assistance awarded by the Commission pursuant to Regulation (EU) No 1316/2013 of the European Parliament and of the Council and Regulation (EU) 2021/1153.

2. Any process for developing the cost-benefit analysis methodology initiated by the ENTSO for Electricity or ENNOH in accordance with Article 11 of Regulation (EU) 2022/869 before [date of entry into force/start of application of this Regulation] shall continue under Article 14 of this Regulation.

Any steps completed under Article 11 of Regulation (EU) 2022/869 shall be deemed to have been completed under the corresponding provisions of Article 14 of this Regulation.

Any energy system-wide cost-benefit analysis methodology approved by the Commission pursuant to Article 11(4) of Regulation (EU) 2022/869 shall be deemed to have been approved under Article 14 (7) of this Regulation and shall remain valid until it is replaced by a new energy system-wide cost-benefit analysis methodology developed pursuant to Article 14 of this Regulation.

3. The joint scenarios being developed by the ENTSO for Electricity, the ENTSO for Gas, and the ENNOH pursuant to Article 12 of Regulation (EU) 2022/869 shall continue to be developed and approved by the Commission in accordance with the procedure set out in that Article. Those joint scenarios, once approved by the Commission, shall be deemed to be central reference scenarios under Article 11 of this Regulation and shall remain valid until they are replaced by new central reference scenarios developed pursuant to Article 11 of this Regulation.

4. Annex VII to Regulation (EU) 2022/869 setting out the [__] Union list of projects of common interest and projects of mutual interest as well as Articles [___] of Regulation (EU) 2022/869, and Annexes [___] to that Regulation, shall continue to apply to the projects of common interest and projects of mutual interest included on the [__] Union list until the delegated act referred to in Article 3(4) of this Regulation establishing the first Union list starts to apply.

Article 32 Repeal

Regulation (EU) 2022/869 is repealed. References to Regulation (EU) 2022/869 shall be construed as references to this Regulation.

Article 33 Entry into force

This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

This Regulation shall be binding in its entirety and directly applicable in all Member States.

Done at Brussels,

For the European Parliament For the Council

The President The President

ANNEX I ENERGY INFRASTRUCTURE PRIORITY CORRIDORS AND AREAS

(as referred to in Article 1(1))

This Regulation shall apply to the following trans-European energy infrastructure priority corridors and areas:

1. PRIORITY ELECTRICITY CORRIDORS

(1) North-South electricity interconnections in Western Europe (NSI West Electricity): interconnections between Member States of the region and with the Mediterranean area including the Iberian peninsula, in particular to integrate electricity from renewable energy sources, reinforce internal grid infrastructures to foster market integration in the region and to end isolation of Ireland, to increase security of supply and network security, and to ensure the necessary onshore prolongations of offshore grids for renewable energy and the domestic grid reinforcements necessary to ensure an adequate and reliable transmission grid and to supply electricity generated offshore to landlocked Member States.

Member States concerned: Belgium, Denmark, Germany, Ireland, Spain, France, Italy, Luxembourg, Malta, Netherlands, Austria and Portugal.

(2) North-South electricity interconnections in Central Eastern and South Eastern Europe (NSI East Electricity): interconnections, and internal lines in North-South and East-West directions to complete the internal market, integrate generation from renewable energy sources to end the isolation of Cyprus, to increase security of supply and network security, and to ensure the necessary onshore prolongations of offshore grids for renewable energy and the domestic grid reinforcements necessary to ensure an adequate and reliable transmission grid and to supply electricity generated offshore to landlocked Member States.

Member States concerned: Bulgaria, Czechia, Germany, Croatia, Greece, Cyprus, Italy, Hungary, Austria, Poland, Romania, Slovenia and Slovakia.

(3) Baltic Energy Market Interconnection Plan in electricity (BEMIP Electricity): interconnections between Member States and internal lines in the Baltic region, to foster market integration while integrating growing shares of renewable energy in the region, and to increase security of supply and network security.

Member States concerned: Denmark, Germany, Estonia, Latvia, Lithuania, Poland, Finland and Sweden.

2. PRIORITY OFFSHORE GRID CORRIDORS

(4) Northern Seas offshore grids (NSOG): offshore electricity grid development, integrated offshore electricity, as well as, where appropriate, hydrogen grid development and the related interconnectors in the North Sea, the Irish Sea, the Celtic Sea, the English Channel and neighbouring waters to transport electricity or, where appropriate, hydrogen from renewable offshore energy sources to centres of consumption and storage or to increase cross-border renewable energy exchange.

Member States concerned: Belgium, Denmark, Germany, Ireland, France, Luxembourg, Netherlands and Sweden.

(5) Baltic Energy Market Interconnection Plan offshore grids (BEMIP offshore): offshore electricity grid development, integrated offshore electricity, as well as, where appropriate, hydrogen grid development and the related interconnectors in the Baltic Sea and neighbouring waters to transport electricity or, where appropriate, hydrogen from renewable offshore energy sources to centres of consumption and storage or to increase cross-border renewable energy exchange.

Member States concerned: Denmark, Germany, Estonia, Latvia, Lithuania, Poland, Finland and Sweden.

(6) South and West offshore grids (SW offshore): offshore electricity grid development, integrated offshore electricity, as well as, where appropriate, hydrogen grid development and the related interconnectors in the Mediterranean Sea, including the Cadiz Gulf, and neighbouring waters to transport electricity or, where appropriate, hydrogen from renewable offshore energy sources to centres of consumption and storage or to increase cross-border renewable energy exchange.

Member States concerned: Greece, Spain, France, Italy, Malta and Portugal.

(7) South and East offshore grids (SE offshore): offshore electricity grid development, integrated offshore electricity, as well as, where appropriate, hydrogen grid development and the related interconnectors in the Mediterranean Sea, Black Sea and neighbouring waters to transport electricity or, where appropriate, hydrogen from renewable offshore energy sources to centres of consumption and storage or to increase cross-border renewable energy exchange.

Member States concerned: Bulgaria, Croatia, Greece, Italy, Cyprus, Romania and Slovenia.

(8) Atlantic offshore grids: offshore electricity grid development, integrated offshore electricity grid development and the related interconnectors in the North Atlantic Ocean waters to transport electricity from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricity exchange.

Member States concerned: Ireland, Spain, France and Portugal.

3. PRIORITY CORRIDORS FOR HYDROGEN AND ELECTROLYSERS

(9) Hydrogen interconnections in Western Europe (HI West): hydrogen infrastructure and the repurposing of gas infrastructure enabling the emergence of an integrated hydrogen backbone, directly or indirectly (via interconnection with or import from a third country), connecting the countries of the region and addressing their specific infrastructure needs for hydrogen supporting the emergence of an Union-wide network for hydrogen transport in the Union.

Electrolysers: supporting the deployment of power-to-gas applications aiming to enable greenhouse gas reductions and contributing to secure, efficient and reliable system operation and smart energy system integration in the Union.

Member States concerned: Belgium, Czechia, Denmark, Germany, Ireland. Spain, France, Italy, Luxembourg, Malta, Netherlands, Austria and Portugal.

(10) Hydrogen interconnections in Central Eastern and South Eastern Europe (HI East): hydrogen infrastructure and the repurposing of gas infrastructure, enabling the emergence of an integrated hydrogen backbone, directly or indirectly (via interconnection with a third country), connecting the countries of the region and addressing their specific infrastructure needs for hydrogen supporting the emergence of an Union-wide network for hydrogen transport in the Union.

Electrolysers: supporting the deployment of power-to-gas applications aiming to enable greenhouse gas reductions and contributing to secure, efficient and reliable system operation and smart energy system integration in the Union.

Member States concerned: Bulgaria, Czechia, Germany, Greece, Croatia, Italy, Cyprus, Hungary, Austria, Poland, Romania, Slovenia and Slovakia.

(11) Baltic Energy Market Interconnection Plan in hydrogen (BEMIP Hydrogen): hydrogen infrastructure and the repurposing of gas infrastructure, enabling the emergence of an integrated hydrogen backbone, directly or indirectly (via interconnection with a third country), connecting the countries of the region and addressing their specific infrastructure needs for hydrogen supporting the emergence of an Union-wide network for hydrogen transport in the Union.

Electrolysers: supporting the deployment of power-to-gas applications aiming to enable greenhouse gas reductions and contributing to secure, efficient and reliable system operation and smart energy system integration in the Union.

Member States concerned: Denmark, Germany, Estonia, Latvia, Lithuania, Poland, Finland and Sweden.

3a. PRIORITY CORRIDORS FOR PROTECTION AND RESILIENCE OF CRITICAL ENERGY SYSTEMS

(11a) Energy infrastructure protection in Western Europe (EIP WEST): strengthening the physical protection and operational resilience of existing energy infrastructure essential for the safe, secure and efficient operation of the energy systems of cross-border relevance, in particular preventing, detecting, mitigating or responding to acts of sabotage or other malicious physical interference. Member States concerned: Belgium, Czechia, Denmark, Germany, Ireland. Spain, France, Italy, Luxembourg, Malta, Netherlands, Austria and Portugal.

(11b) Energy infrastructure protection in Central Eastern and South Eastern Europe (EIP EAST): strengthening the physical protection and operational resilience of existing energy infrastructure essential for the safe, secure and efficient operation of the energy systems of cross-border relevance, in particular preventing, detecting, mitigating or responding to acts of sabotage or other malicious physical interference.

Member States concerned: Bulgaria, Czechia, Germany, Greece, Croatia, Italy, Cyprus, Hungary, Austria, Poland, Romania, Slovenia and Slovakia.

(11c) Baltic Energy Market Interconnection Plan in energy infrastructure protection (EIP BEMIP): strengthening the physical protection and operational resilience of existing energy infrastructure essential for the safe, secure and efficient operation of the energy systems of cross-border relevance, in particular preventing, detecting, mitigating or responding to acts of sabotage or other malicious physical interference.

Member States concerned: Denmark, Germany, Estonia, Latvia, Lithuania, Poland, Finland and Sweden.

4. PRIORITY THEMATIC AREAS

(12) Smart electricity grids deployment: adopting smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, enabling their active participation, in particular the generation of large amounts of electricity from renewable or distributed energy sources and demand response by consumers, energy storage, electric vehicles and other flexibility sources, to contribute to the climate adaptation of the electricity network, and, in addition, as regards islands and island systems, decreasing energy isolation, supporting innovative and other solutions involving at least two Member States with a significant positive impact on the Union’s targets for energy and climate and its 2050 climate neutrality objective, and contributing significantly to the sustainability of the island energy system and that of the Union.

Member States concerned: all.

(13) Cross-border carbon dioxide network: development of infrastructure for transport and storage of carbon dioxide between Member States and with neighbouring third countries of carbon dioxide capture and storage captured from industrial installations for the purpose of permanent geological storage as well as carbon dioxide utilisation for synthetic fuel gases leading to the permanent neutralization of carbon dioxide.

Member States concerned: all

ANNEX II ENERGY INFRASTRUCTURE CATEGORIES

The energy infrastructure categories to be developed in order to implement the energy infrastructure priorities set out in Annex I shall be the following:

(1) concerning electricity:

(a) high and extra-high voltage overhead transmission lines, crossing a border or within a Member State territory including the exclusive economic zone, if they have been designed for a voltage of 220 kV or more, and underground and submarine transmission cables, if they have been designed for a voltage of 150 kV or more. For Member States and small isolated systems with a lower voltage overall transmission system, those voltage thresholds are equal to the highest voltage level in their respective electricity systems;

(b) any equipment or installation falling under energy infrastructure category referred to in point (a) enabling transmission of low carbon and offshore renewable electricity from the offshore generation sites (energy infrastructure for offshore low carbon and renewable electricity);

(c) energy storage facilities, in individual or aggregated form, used for storing energy on a permanent or temporary basis in above-ground or underground infrastructure or geological sites, provided they are directly connected to high-voltage transmission lines and distribution lines designed for a voltage of 110 kV or more. For Member States and small isolated systems with a lower voltage overall transmission system, those voltage thresholds are equal to the highest voltage level in their respective electricity systems;

(d) any equipment or installation essential for the systems referred to in points (a), (b) and (c) to operate the systems safely, securely and efficiently, including protection, resilience, monitoring, control and digitalisation equipment or installation at all voltage levels and substations;

(e) any equipment or installation, which is specifically designed to provide protection and resilience to existing critical network elements, at all voltage levels pursuant to Regulation (EU) 2019/943, is physically directly connected to them, and is essential to operate the systems safely, securely and efficiently;

(f) any equipment or installation essential for voltage network elements to operate the systems safely and efficiently which constitutes monitoring, control and digitalisation equipment or installation;

(g) smart electricity grids: any equipment or installation, digital systems and components integrating both information and communication technologies (ICT) and Operational Software and Automation Technologies (OT), through digital platforms, control systems and sensor technologies, as well as digital twins or other platforms enabling or improving and coordinating planning, operations, market procurement or activation of distributed energy resources for the delivery of flexibility to system operators, both at transmission and low, medium and high voltage distribution level, aiming to ensure a more efficient, secure, and intelligent electricity transmission and distribution network, including by enhancing the cyber and operational resilience of the Union’s energy infrastructure, with the capacity to prevent, withstand and recover from cyber incidents, physical disruptions and hybrid threats, while increasing the capacity to integrate new forms of generation, energy storage and consumption and facilitating new business models and market structures, including investments in islands and island systems to decrease energy isolation, to support innovative and other solutions involving at least two Member States with a significant positive impact on the Union’s targets for energy and climate and its 2050 climate neutrality objective, and to contribute significantly to the sustainability of the island energy system and that of the Union;

(h) offshore grids for renewable energy: any equipment or installation falling under energy infrastructure category referred to in point (a) having dual functionality: interconnection and offshore grid connection system from the offshore renewable generation sites to two or more Member States and a third country, including the onshore prolongation of this equipment up to the first substation in the onshore transmission system, as well as any offshore adjacent equipment or installation essential to operate safely, securely and efficiently, including protection, monitoring and control systems, and necessary substations if they also ensure technology interoperability, inter alia, interface compatibility between various technologies ;

(2) concerning hydrogen:

(a) pipelines for the transport, mainly at high pressure, of hydrogen, including repurposed natural gas infrastructure, giving access to multiple network users on a transparent and non-discriminatory basis;

(aa) import and/or dispatch terminals for hydrogen;

(b) storage facilities connected to the high-pressure hydrogen pipelines referred to in point (a) and to the infrastructure referred to in point (aa);

(c) reception, storage and regasification or decompression facilities for liquefied hydrogen or hydrogen embedded in other chemical substances with the objective of injecting the hydrogen, where applicable, into the grid;

(d) any equipment or installation essential for the hydrogen system to operate safely, securely and efficiently or to enable bi-directional capacity, including compressor stations;

Any of the assets listed in points (a) to (d) may be newly constructed or repurposed from natural gas to hydrogen, or a combination of the two;

(3) concerning electrolyser facilities:

(a) electrolysers that:

(i) have at least 500 MW capacity, provided by a single electrolyser or by a set of electrolysers that form a single, coordinated project; and

(ii) the production qualifies as low carbon hydrogen in line with Directive (EU) 2024/1788 in case of low-carbon hydrogen or renewable fuel of non-biological origin in line with the Directive (EU) 2018/2001; and

(iii) have a network-related function for both the electricity and the hydrogen networks, particularly with a view to overall system flexibility and overall system efficiency of the two networks.

(b) related equipment, including pipeline connection to the network.

(4) concerning carbon dioxide:

(a) dedicated pipelines, other than upstream pipeline network, used to transport carbon dioxide from more than one source, for the purpose of permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC;

(b) fixed facilities for liquefaction, buffer storage and converters of carbon dioxide in view of its further transportation through pipelines and in dedicated modes of transport such as ship, barge, truck, and train;

(c) without prejudice to any prohibition of geological storage of carbon dioxide in a Member State, surface and injection facilities associated with infrastructure within a geological formation that is used, in accordance with Directive 2009/31/EC, for the permanent geological storage of carbon dioxide, where they do not involve the use of carbon dioxide for the enhanced recovery of hydrocarbons and are necessary to allow the cross-border transport and storage of carbon dioxide;

(d) any equipment or installation essential for the system in question to operate properly, securely and efficiently, including protection, monitoring and control systems.

ANNEX III REGIONAL LISTS OF PROJECTS

1. RULES FOR GROUPS

(1) With regard to energy infrastructure falling under the competence of national regulatory authorities, each Group shall be composed of representatives of the Member States, national regulatory authorities, TSOs as well as the Commission, the Agency, the EU DSO entity and either the ENTSO for Electricity or the ENNOH.

For the other energy infrastructure categories, each Group shall be composed of the Commission and the representatives of the Member States, project promoters concerned by each of the relevant priorities set out in Annex I.

(2) Depending on the number of candidate projects for the Union list, regional infrastructure gaps and market developments, the Groups and the decision-making bodies of the Groups may split, merge or meet in different configurations, as necessary, to discuss matters common to all Groups via the TEN-E Group or pertaining solely to particular regions. Such matters may include issues relevant to cross-regional consistency or the number of proposed projects included on the draft regional lists at risk of becoming unmanageable.

(3) Each Group shall organise its work in line with regional cooperation efforts pursuant to Articles 31 and 65 of Regulation (EU) 2024/1789, Article 80 of Directive (EU) 2024/1788, Article 34 of Regulation (EU) 2019/943, and Article 61 of Directive (EU) 2019/944, and other existing regional cooperation structures.

(4) Each Group shall invite, as appropriate for the purpose of implementing the relevant energy infrastructure priority corridors and areas designated in Annex I, promoters of a project potentially eligible for selection as a project of common interest or projects of mutual interest as well as representatives of national administrations, of regulatory authorities, of civil society and TSOs from third countries.

(5) For the energy infrastructure priority corridors set out in Section 2 of Annex I, each Group shall invite, as appropriate, representatives of the landlocked Member States, competent authorities, national regulatory authorities and TSOs.

(6) Each Group shall invite to the meetings, as appropriate, the organisations representing relevant stakeholders, including representatives from third countries, and, where deemed to be appropriate, directly the stakeholders, including producers, DSOs, suppliers, consumers, local populations and Union-based organisations for environmental protection, to express their specific expertise. Each Group shall organise hearings or consultations where relevant for the accomplishments of its tasks.

(7) As regards the meetings of the Groups, the Commission shall publish, on a platform accessible to stakeholders, the internal rules, an updated list of member organisations, regularly updated information on the progress of work, meeting agendas, as well as meeting minutes, where available. The deliberations of the decision-making bodies of the Groups and the project ranking in accordance with Article 4(5) shall be confidential. All decisions concerning to the functioning and work of the Groups shall be made by consensus between the Member States and the Commission. Any Member State participating in the Group may raise an objection on publication of any data referred to in this paragraph that is sensitive for the Member State.

(8) The Commission, the Agency and the Groups shall strive for consistency between the Groups. For that purpose, the Commission and the Agency shall ensure, when relevant, the exchange of information on all work representing an interregional interest between the Groups concerned.

(9) The participation of national regulatory authorities and the Agency in the Groups shall not jeopardise the fulfilment of their objectives and duties under this Regulation or under Regulation (EU) 2019/942, Articles 77, 78, and 79 of Directive (EU) 2024/1788 and Articles 58, 59 and 60 of Directive (EU) 2019/944.

2. PROCESS FOR ESTABLISHING REGIONAL LISTS

(1) By 31 October of each year preceding the year in which a new Union list is to be adopted, promoters of a project potentially eligible for selection as a project on the Union list wanting to obtain that status shall submit an application for selection as a project on the Union list to the Group, the national competent authority referred to in Article 8(4) and the Agency, that includes:

(a) an assessment of their projects with regard to their contribution to implementing the priorities set out in Annex I;

(b) an indication of the relevant project category set out in Annex II;

(c) an analysis of the fulfilment of the relevant criteria laid down in Article 4;

(d) for projects having reached a sufficient degree of maturity, a cost-benefit analysis, which is consistent with the methodologies pursuant Article 14, and which, for energy infrastructure categories relating to electricity falling under points 1 (a), (b), (c), (d), (f), (h) of Annex II, to hydrogen falling under point 2 of Annex II, and to electrolysers falling under point 3 of Annex II, has been performed by the ENTSO for Electricity or the ENNOH, as applicable, in the framework of the Union-wide ten-year network development plan;

(e) information regarding their ultimate beneficiary owners and their internal ownership structure which shall be treated as confidential by the Commission and the members of the high-level decision-making body at duly justified request by the project promoters, in case of business secrets/commercial information;

(f) for projects of mutual interest, project specific non-binding agreements between or letters of support from the governments of the directly affected countries expressing their explicit support for the project and, for the third country, confirming their explicit commitment to complying with a similar timeline for accelerated implementation and other policy and regulatory support measures as applies to projects of common interest in the Union pursuant to Article 4(2), point (f), and, for energy infrastructure categories relating to electricity falling under points 1(a), (d) or (h), a preliminary grid security and stability study from the transmission system operators confirming that the project can be fully integrated into the electricity networks of the countries concerned;

(g) any other relevant information for the evaluation of the project.

(2) Projects on the Union list that have demonstrated sufficient project maturity, such as by obtaining regulatory approval or completing the environmental impact assessments required under applicable Union or national law, or completing front-end engineering design, or reaching final investment decision, or projects for which construction is on-going or show sufficient progress in their annual report required under Article 5, shall remain on the Union list and not be required to re-submit information pursuant to points (a) to (f) and of point 1. All recipients shall ensure the confidentiality of commercially sensitive information.

(3) The proposed electricity transmission and storage projects of common interest and projects of mutual interest falling under the energy infrastructure categories set out in point (1)(a), (b), (c), (d), (f), and (h) of Annex II to this Regulation, as relevant, shall be part of the latest available Union-wide ten-year network development plan for electricity, developed by the ENTSO for Electricity pursuant Article 30 of Regulation (EU) 2019/943. The proposed electricity transmission projects of common interest falling under the energy infrastructure categories set out in points (1)(b) and (h) of Annex II to this Regulation shall be consistent with the integrated offshore network development and grid reinforcements referred to in Article 15(2) of this Regulation.

(4) The proposed hydrogen projects of common interest and projects of mutual interest falling under the energy infrastructure categories set out in point (2) and (3) of Annex II to this Regulation shall be part of the latest available Union-wide ten-year network development plan for hydrogen, developed by the ENNOH pursuant to Article 60 of Regulation (EU) 2024/1789.

(4a) Following the adoption of the final list of proposed projects, the Group shall examine the unmatched needs pursuant to Article 13 for which eligible projects should be submitted as soon as possible for inclusion in the subsequent national development plans, the Union-wide ten-year network development plan and the Union list.

(5) By 30 June 2027 and subsequently for every Union-wide ten-year network development plan, the ENTSO for Electricity, and the ENNOH shall issue updated guidelines for inclusion of projects in their respective Union-wide ten-year network development plan, as referred to in points (3) and (4), in order to ensure equal treatment and the transparency of the process. For all the projects on the Union list in force at the time, the guidelines shall establish a simplified process of inclusion in the Union-wide ten-year network development plans taking into account the documentation and data already submitted during the previous Union-wide ten-year network development plan processes, provided that the documentation and data already submitted remains valid.

The ENTSO for Electricity, and the ENNOH shall consult the Commission and the Agency about their respective draft guidelines for inclusion of projects in the Union-wide ten-year network development plans and take due account of the Commission’s and the Agency’s recommendations before the publication of the final guidelines.

(6) The ENTSO for Electricity and the ENNOH shall provide information to the TEN-E Group as to how they applied the guidelines to evaluate inclusion in the Union-wide ten-year network development plans.

(7) Proposed carbon dioxide transport and storage projects falling under the energy infrastructure category set out in point (4) of Annex II shall be presented as part of a plan, developed by at least two Member States, for the development of cross-border carbon dioxide transport and storage infrastructure, to be presented by the Member States concerned or entities designated by those Member States to the Commission.

(8) For projects falling under their competence, the national regulatory authorities and, the Agency shall, taking into account regional cooperation pursuant to Article 80 of Directive (EU) 2024/1788 and Article 61 of Directive (EU) 2019/944, check the consistent application of the criteria and of the project-specific cost-benefit analysis methodology pursuant to Article 14 of this Regulation, and evaluate projects’ cross-border relevance and progress achieved for projects on the Union list, taking into account the reports submitted pursuant to Article 5(4) of this Regulation. They shall present their assessment to the Group. The Commission shall ensure that criteria and methodologies referred to in Article 4 of this Regulation and Annex IV are applied in a harmonised way to ensure consistency across the regional groups.

(9) For all projects not covered in point (8) of this Annex, the Commission shall evaluate the application of the criteria set out in Article 4 of this Regulation. The Commission shall also take into account the potential for future extension to include additional Member States. The Commission shall present its assessment to the Group. For projects applying for the status of project of mutual interest, third-country representatives and regulatory authorities shall be invited to the presentation of the assessment.

(10) Each Member State to whose territory a proposed project does not relate, but on which the proposed project may have a potential net positive or negative impact or a potential significant effect, such as on the environment or on the operation of the energy infrastructure on its territory, may present an opinion to the Group specifying its concerns.

(11) The Group shall examine, at the request of a Member State of the Group, the substantiated reasons presented by a Member State pursuant to Article 3(3) for not approving a project related to its territory.

(12) The Group shall consider whether the energy efficiency first principle is applied as regards the establishment of the regional infrastructure needs and as regards each of the candidate projects. The Group shall, in particular, consider solutions such as grid enhancing technologies, demand-side management, non-fossil flexibility, market arrangement solutions, implementation of digital solutions, and renovation of buildings as priority solutions where they are judged more cost-efficient on a system wide perspective than the construction of new supply side infrastructure.

(13) The Group shall meet to examine and rank the proposed projects based on a transparent assessment of the projects and using the criteria set out in Article 4 taking into account the assessment of the national regulatory authorities and of the Agency, or the assessment of the Commission for projects not falling within the competence of national regulatory authorities.

(14) The decision-making body of each Group shall adopt its final list of proposed projects at latest by two months before the adoption date of the Union list Article 22, respecting the provisions set out in Article 3(3), on the basis of the Groups’ proposal and taking into account the assessment of national regulatory authorities and the Agency and the assessment of the Commission for projects not falling within the competence of national regulatory authorities proposed in accordance with point (9), and the advice from the Commission that aims to ensure a manageable total number of projects on the Union list, especially at borders related to competing or potentially competing projects. The decision-making bodies of the Groups shall submit the final lists to the Commission, together with any opinions as specified in point (10).

(15) Where, on the basis of the draft lists, the total number of proposed projects on the Union list would exceed a manageable number, the Commission shall advise each Group concerned, not to include in the list projects that were ranked lowest by the Group concerned in accordance with the ranking established pursuant to Article 4(5).

ANNEX IV RULES AND INDICATORS CONCERNING CRITERIA FOR PROJECTS

(1) A project of common interest with a significant cross-border impact shall be a project on the territory of a Member State and shall fulfil the following conditions:

(a) for electricity transmission projects falling under point (1) (a), (b), (d), and (f) of Annex II , the project increases the net transfer capacity, at the border of that Member State with one or several other Member States by at least 200 Megawatts (MW) compared to the situation without commissioning of the project, including where such increase results from reinforcement of internal transmission infrastructure that demonstrably increases cross-border transfer capacity or alleviates structural congestion affecting cross-border electricity flows;

(b) for any equipment or installation projects falling under point (1) (e) of Annex II, they need to be deployed on existing critical network elements, as defined in Article 2, point (69), of Regulation (EU) 2019/943, be included as part of the measures defined in the risk preparedness plans established by Member States pursuant to the Risk Preparedness Regulation to address risks to energy security, and increase energy security in at least one additional Member State;

(c) for electricity storage projects falling under point (1) (c) of Annex II, the project provides at least 225 MW installed capacity or has a storage capacity that allows a net annual electricity generation of 250 GW-hours/year;

(d) for smart electricity grids projects falling under point (1) (g) of Annex II, the project is designed for equipment and installations at all voltage levels, and involves TSOs, TSOs and DSOs, or DSOs from at least two Member States. The project may involve only DSOs provided that they are from at least two Member States and provided that interoperability is ensured. The project shall satisfy at least two of the following criteria: it involves 50 000 users, generators, consumers or prosumers of electricity, it captures a consumption area of at least 300 GW hours/year, at least 20 % of the electricity consumption linked to the project originates from variable renewable resources, or it decreases energy isolation of non-interconnected systems in one or more Member States. The project does not need to involve a physical common border. For projects related to small isolated systems as defined in Article 2, point (42), of Directive (EU) 2019/944, including islands, those voltage levels shall be equal to the highest voltage level in the relevant electricity system;

(e) for hydrogen transmission the project increases existing cross-border hydrogen transport capacity at a border between two Member States by at least 10 % compared to the situation prior to the commissioning of the project, and the project sufficiently demonstrates that it is an essential part of a planned cross-border hydrogen network and provides sufficient proof of existing plans and cooperation with neighbouring countries and network operators or, for projects decreasing energy isolation of non-interconnected systems in one or more Member States, the project aims to supply, directly or indirectly, at least two Member States;

(f) for hydrogen storage or hydrogen reception facilities referred to in point (2) of Annex II, the project aims to supply, directly or indirectly, at least two Member States;

(g) for electrolysers, the project provides at least 500 MW installed capacity provided by a single electrolyser or by a set of electrolysers that form a single coordinated project and brings benefits directly or indirectly to at least two Member States;

(h) for offshore renewable electricity transmission, the project is designed to transfer electricity from offshore generation sites with capacity of at least 500 MW and allows for electricity transmission to onshore grid of a specific Member State, increasing the volume of renewable electricity available on the internal market. The project shall be developed in particular in the areas with low penetration of offshore renewable electricity and other areas and shall demonstrate a significant positive impact on the Union’s targets for energy and climate and its 2050 climate neutrality objective;

(i) for carbon dioxide projects, the project is used to transport and, where applicable, store anthropogenic carbon dioxide originating from at least two Member States.

(2) A project of mutual interest with significant cross-border impact shall fulfil the following conditions:

(a) for projects of mutual interest relating to the category set out in point (1)(a), (c), (g), (d), and (h) of Annex II, the project increases the net transfer capacity at the border of that Member State with a third country and brings significant benefits to at least two countries directly or indirectly concerned by the project;

(b) for projects of mutual interest in the category set out in point (2) (a) of Annex II, the hydrogen project enables the transmission of hydrogen across the border of a Member State with a third country and proves bringing significant benefits to at least two countries directly or indirectly concerned by the project;

(c) for projects of mutual interest in the category set out in point (4) of Annex II, the project can be used to transport and store anthropogenic carbon dioxide by at least two Member States and a third country.

(3) Concerning projects falling under the energy infrastructure categories set out in point (1)(a), (b), (c), (d), (f) and (h) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:

(a) transmission of renewable and low-carbon energy generation to major consumption centres and storage sites, measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, in particular by:

(i) for electricity transmission set out in point (1)(a), (b), (d), (f) and (h) of Annex II, estimating the amount of generation capacity from renewable energy sources (by technology, in MW), which is connected and transmitted due to the project, compared to the amount of planned total generation capacity from those types of renewable energy sources in the Member State concerned according to the National Energy and Climate Plans submitted by Member States in accordance with Regulation (EU) 2018/1999;

(ii) or energy storage set out in point (1)(c) of Annex II, comparing new capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as set out in Annex V including in particular its contribution to:

(a) the integration of renewable electricity and reduction of curtailment;

(b) system adequacy and resilience across relevant time horizons, and

(c) congestion relief and system flexibility, taking into account both installed capacity (MW) and storage capability (MWh/GWh) and discharge duration;

(b) market integration, competition and system flexibility, measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, in particular by:

(i) calculating, for cross-border projects, including reinvestment projects, the impact on the grid transfer capability in both power flow directions, measured in terms of amount of power (in MW), and their contribution to reaching the interconnection target, and for projects with significant cross-border impact, the impact on grid transfer capability at borders between relevant Member States, between relevant Member States and third country or within relevant Member States and on demand-supply balancing and network operations in relevant Member States;

(ii) assessing the impact, for the area of analysis as set out in Annex V, in terms of energy system-wide generation and transmission costs and evolution and convergence of market prices, including the reduction of persistent price divergences between bidding zones caused by structural network congestion, provided by a project under various planning scenarios, in particular taking into account the variations induced on the merit order;

(c) security of supply, interoperability and secure system operation, measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, in particular by assessing the impact of the project on the loss of load expectation for the area of analysis as set out in Annex V in terms of generation and transmission adequacy for a set of characteristic load periods, taking into account expected changes in climate-related extreme weather events and their impact on infrastructure resilience. Where applicable, the impact of the project on independent and reliable control of system operation and services shall be measured.

(4) Concerning projects falling under the energy infrastructure category set out in point (1)(g) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:

(a) the level of sustainability, measured by assessing the extent of the ability of the grids to connect and transport variable renewable energy;

(b) security of supply, measured by the availability of network components (related to planned and unplanned maintenance) and its impact on network performances, and on the duration and frequency of interruptions, including climate related disruptions;

(c) market integration, measured by assessing the innovative uptake in system operation, the decrease of energy isolation and interconnection, as well as the level of integrating other sectors and facilitating new business models and market structures;

(d) network security, flexibility and quality of supply, measured by assessing the innovative approach to system flexibility, cybersecurity, efficient operability between TSO and DSO level, the capacity to include demand response, storage, energy efficiency measures, the cost-efficient use of digital tools and ICT for monitoring and control purposes, the stability of the electricity system and the voltage quality performance.

(e) level of efficiency as measured by assessing the level of losses in distribution and transmission networks and the percentage utilisation (i.e. average loading) of electricity network components.

(5) Concerning projects falling under the energy infrastructure category set out in point (1)(e) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:

(a) security of supply, measured by the percentage utilisation (i.e. average loading) of electricity network components; the availability of network components and its impact on network performances; the duration and frequency of interruptions, including climate related disruptions;

(b) network security, measured by assessing the ability to prevent significant incidents through physical and cybersecurity measures;

(6) Concerning hydrogen falling under the energy infrastructure category set out in point (2) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:

(a) sustainability, measured as the contribution of a project to greenhouse gas emission reductions in various end-use applications in hard-to-abate sectors, such as industry or transport; flexibility and seasonal storage options for renewable electricity generation; or the integration of renewable and low-carbon hydrogen with a view to consider market needs and promote renewable hydrogen;

(b) market integration and interoperability, measured by calculating the additional value of the project to the integration of market areas and price convergence to the overall flexibility of the system;

(c) security of supply and flexibility, measured by calculating the additional value of the project to the resilience, diversity and flexibility of hydrogen supply;

(d) competition, measured by assessing the project’s contribution to supply diversification, including the facilitation of access to indigenous sources of hydrogen supply.

(7) Concerning electrolyser projects falling under the energy infrastructure category set out in point (3) of Annex II the criteria listed in Article 4 shall be evaluated as follows:

(a) sustainability, measured by assessing the share of renewable hydrogen or low-carbon hydrogen, in particular from renewable sources meeting the criteria defined in point (3)(a)(ii) of Annex II integrated into the network or estimating the amount of deployment of synthetic fuels of those origins and the related greenhouse gas emission savings;

(b) security of supply, measured by assessing its contribution to the safety, stability and efficiency of network operation, including through the assessment of avoided curtailment of renewable electricity generation;

(c) enabling flexibility services such as demand response and storage by the facilitation of smart energy sector integration through the creation of links to other energy carriers and sectors, measured by assessing the cost savings enabled in connected energy sectors and systems, such as the gas, hydrogen, power and heat networks, the transport and industry sectors.

(8) Concerning carbon dioxide infrastructure falling under the energy infrastructure categories set out in point (4) of Annex II the criteria listed in Article 4 shall be evaluated as follows:

(a) sustainability, measured by assessing the total expected project life-cycle greenhouse gas reductions and the absence of alternative technological solutions such as, but not limited to, energy efficiency, electrification integrating renewable sources, to achieve the same level of greenhouse gas reductions as the amount of carbon dioxide to be captured at connected industrial installations at a comparable cost within a comparable timeline taking into account the greenhouse gas emissions from the energy necessary to capture, transport and store the carbon dioxide, as applicable, considering the infrastructure including, where applicable, other potential future uses;

(b) resilience and security, measured by assessing the security of the infrastructure;

(c) the mitigation of environmental burden and risk via the permanent neutralisation of carbon dioxide.

ANNEX V ENERGY SYSTEM-WIDE COST-BENEFIT ANALYSIS

The methodologies for cost-benefit analyses developed by the ENTSO for Electricity and the ENNOH shall be consistent with each other, taking into account sectorial specificities. The methodologies for a harmonised and transparent energy system-wide cost-benefit analysis for projects on the Union list shall be uniform for all infrastructure categories, unless specific divergences are justified. They shall address costs in the broader sense, including externalities, in view of the Union’s targets for energy and climate and its 2050 climate neutrality objective, they shall be designed to assess the extent to which projects or project bundles effectively address identified infrastructure needs and shall comply with the following principles:

(1) the area for the analysis of an individual project shall cover all Member States and third countries, on whose territory the project is located, all directly neighbouring Member States and all other Member States in which the project has a significant impact. For this purpose, ENTSO for Electricity and ENNOH shall cooperate with all the relevant system operators in the relevant third countries. In the case of projects falling under the energy infrastructure category set out at point (3) of Annex II, the ENTSO for Electricity and the ENNOH shall cooperate with the project promoter, including where it is not a system operator;

(2) each cost-benefit analysis shall include sensitivity analyses concerning the input data set, investment cost assumptions, where relevant, including the cost of generation and greenhouse gases as well as the expected development of demand and supply, including with regard to renewable energy sources, and including the flexibility of both, electrification rates and impacts on seasonal peak demand for electricity, and the availability of storage, the commissioning date of various projects in the same area of analysis, climate impacts and other relevant parameters; the modelling shall allow for scenario-based comparison of alternative solutions;

(2a) investment costs shall be presented using cost ranges reflecting the level of project maturity or by the single point estimates, and shall be accompanied by an explanation of the main sources of uncertainty;

(2b) the treatment of uncertainty and risk shall be applied symmetrically across all project types. Where conservative assumptions are applied to innovative infrastructure solutions, equivalent assessment shall also be applied to potential cost escalation, permitting risk and delivery risk associated with conventional infrastructure solutions;

(3) they shall establish the analysis to be carried out, based on the relevant multi-sectorial input data set by determining the impact with and without each project and shall include the relevant interdependencies with other projects and shall enable a systematic comparison between identified infrastructure needs and the contribution of each project or project bundle to addressing those needs, including the identification of residual unmet needs;

(4) they shall give guidance for the development and use of energy network and market modelling necessary for the cost-benefit analysis. The modelling shall allow for a full assessment of economic benefits, including market integration, security of supply and competition, as well as lifting energy isolation, social and environmental and climate impacts, including the cross-sectorial impacts. The methodology shall be fully transparent including details on why, what and how each of the benefits and costs are calculated;

(5) they shall include an explanation on how the energy efficiency first principle is implemented including the assessment of higher efficiency alternatives in energy supply, demand, transmission and distribution, at system level, across electricity, heat and gas systems, in all the steps of the Union-wide ten-year network development plans;

(6) they shall explain that the development and deployment of renewable energy will not be hampered by the project;

(7) they shall ensure that the Member States on which the project has a net positive impact, the beneficiaries, the Member States on which the project has a net negative impact, and the cost bearers, which may be Members States other than those on which territory the infrastructure is constructed, are identified;

(8) they shall take into account, at least, the capital expenditureoperational and maintenance expenditure costs as well as the costs induced for the related system over the technical lifecycle of the project as a whole, such as decommissioning and waste management costs, including external costs The methodologies shall give guidance on discount rates, technical lifetime and residual value to be used for the cost- benefit calculations. They shall furthermore include a mandatory methodology to calculate benefit-to-cost ratio and the net present value, as well as a differentiation of benefits in accordance with the level of reliability of their estimation methods, and shall include indicators reflecting improvements in system utilisation and capacity availability. Methods to calculate the climate and environmental impacts of the projects and the contribution to Union energy targets, such as renewable penetrations reduction in system losses, energy efficiency and interconnection targets shall also be taken into account. For projects awarded PCI/PMI status in previous assessments, where those project costs diverge materially from those assumed at the time of project selection, the updated cost assumptions and their impact on the benefit-to-cost ratio shall be transparently reported:

(9) they shall ensure that the climate adaptation measures taken for each project are assessed and reflect the cost of greenhouse gas emissions and that the assessment is robust and consistent with other Union policies in order to enable comparison with other solutions which do not require new infrastructures, and shall ensure that the methodologies capture long-term system risks, including the risk of underutilisation of assets, and support a phased and market-based development of infrastructure where relevant;

(9a) they may be consistent on the following elements: assessment period, residual value of projects, use of social discount rate; approach for building the electricity, gas and hydrogen reference networks; stages of project implementation status; definition of project capital and operational expenditures; calculation of the project Economic Performance Indicators, use of sensitivities; and modelling interlinkages across sectors;

ANNEX VI GUIDELINES FOR TRANSPARENCY AND PUBLIC PARTICIPATION

(1) The manual of procedures referred to in Article 9(1) shall contain at least:

(a) specifications of the relevant pieces of legislation upon which decisions and opinions are based for the various types of relevant projects of common interest, including environmental law;

(b) the list of relevant decisions and opinions to be obtained;

(c) the names and contact details of the competent authority, other authorities concerned and major stakeholders concerned;

(d) the work flow, outlining each stage in the process, including an indicative timeline and a concise overview of the decision-making process for the various types of relevant projects of common interest;

(e) information about the scope, structure and level of detail of documents to be submitted with the application for decisions, including a checklist;

(f) the stages and means for the general public to participate in the process;

(g) the manner in which the competent authority, other authorities concerned and the project promoter shall demonstrate that the opinions expressed in the public consultation were taken into account, for example by showing what amendments were done in the location and design of the project or by providing reasons why such opinions have not been taken into account;

(h) to the extent possible, translations of its content in English and all languages of the neighbouring Member States to be realised in coordination with the relevant neighbouring Member States.

(2) The detailed schedule referred to in Article 10(8), shall at least specify the following:

(a) the decisions and opinions to be obtained;

(b) the authorities, stakeholders, and the public likely to be concerned;

(c) the individual stages of the procedure and their duration;

(d) major milestones to be accomplished and their deadlines in view of the comprehensive decision to be taken;

(e) the resources planned by the authorities and possible additional resource needs.

(3) Without prejudice to the requirements for public consultations under environmental law, to increase public participation in the permit granting process and ensure in advance information and dialogue with the public, the following principles shall be applied:

(a) the stakeholders affected by a project of common interest, including relevant national, regional and local authorities, landowners and citizens living in the vicinity of the project, the general public and their associations, organisations or groups, shall be extensively informed and consulted at an early stage, in an inclusive manner, when potential concerns by the public can still be taken into account and in an open and transparent manner. Where relevant, the competent authority shall actively support the activities undertaken by the project promoter;

(b) competent authorities shall ensure that public consultation procedures for projects of common interest are grouped together where possible including public consultations already required under national law. Each public consultation shall cover all subject matters relevant to the particular stage of the procedure, and one subject matter relevant to the particular stage of the procedure shall not be addressed in more than one public consultation; however, one public consultation may take place in more than one geographical location. The subject matters addressed by a public consultation shall be clearly indicated in the notification of the public consultation;

(c) comments and objections shall be admissible only from the beginning of the public consultation until the expiry of the deadline;

(d) the project promoters shall ensure that consultations take place during a period that allows for open and inclusive public participation.

(4) The concept for public participation shall at least include information about:

(a) the stakeholders concerned and addressed;

(b) the measures envisaged, including proposed general locations and dates of dedicated meetings;

(c) the timeline;

(d) the human resources allocated to various tasks.

(5) In the context of the public consultation to be carried out before submission of the application file, the relevant parties shall at least:

(a) publish in electronic and, where relevant, printed form, an information leaflet of no more than 15 pages, giving, in a clear and concise manner, an overview of the description, purpose and preliminary timetable of the development steps of the project, the national grid development plan, alternative routes considered, types and characteristics of the potential impact, including of cross-border or transboundary nature, and possible mitigation measures, such information leaflet is to be published prior to the start of the consultation and to list the web addresses of the website of the project of common interest referred to in Article 9(7), the transparency platform referred to in Article 23 and the manual of procedures referred to in point (1) of this Annex;

(b) publish the information on the consultation on the website of the project of common interest referred to in Article 9(7), on the bulletin boards of the offices of local administrations, and, at least, in one or, if applicable, two local media outlets;

(c) invite, in written or electronic form, the relevant affected stakeholders, associations, organisations and groups to dedicated meetings, during which concerns shall be discussed.

(6) The project website referred to in Article 9(7) shall at least publish the following information:

(a) the date when the project website was last updated;

(b) translations of its content in English and in all languages of the Member States concerned by the project or on which the project has a significant cross-border impact in accordance with point (1) of Annex IV;

(c) the information leaflet referred to in point (5) updated with the latest data on the project;

(d) a non-technical and regularly updated summary reflecting the current status of the project, including geographic information, and clearly indicating, in case of updates, changes to previous versions;

(e) the implementation plan as set out in Article 5(1) updated with the latest data on the project;

(f) the funds allocated and disbursed by the Union for the project;

(g) the project and public consultation planning, clearly indicating dates and locations for public consultations and hearings and the envisaged subject matters relevant for those hearings;

(h) contact details in view of obtaining additional information or documents;

(i) contact details in view of conveying comments and objections during public consultations.

ANNEX VII INFRASTRUCTURE NEEDS IDENTIFICATION REPORTS

The framework methodology developed by ACER for identification of infrastructure needs by the ENTSO for Electricity and the ENNOH shall ensure that the identification of infrastructure needs reports referred to in Article 12 comply with the following principles:

(1) It shall be based on the Union strategic scenario and sensitivities pursuant to Article 11 of this Regulation, and complemented by further assessment, when relevant, using the central scenario’s sensitivities.

(2) It shall follow cross-sectoral and integrated approach taking into account interlinkages between electricity, hydrogen and gas sectors, as well as, where applicable, district heating and CO2 sectors.

(3) It shall ensure that the needs are identified by analysing most efficient joined-up contribution of the electricity and hydrogen network solutions, including grid enhancing technologies, integrated electricity and hydrogen infrastructure, renewable and low-carbon , non-fossil flexibility or other alternatives to system expansion, to achieve the optimal energy network for achieving the energy and climate targets and objectives. The optimal energy network should also ensure security of supply and lead to a higher market integration and competitiveness of the European industry by increasing price convergence between respective market and bidding zones as and higher electricity interconnectivity levels.

(3a) It shall ensure the needs identified are robust. To that aim, where a need is identified based on an alternative scenario in addition to the initial scenario it may be considered a prevailing need.

(4) It shall look at medium (10-15 years) and long-term (20-30 years) time horizon based on a realistic starting network for each time horizon, identifying needs at Member States borders and at national level if of cross-border relevance, taking also into account infrastructure developments in the third countries in line with the EU policy priorities.

(5) It shall reflect the European perspective by first identifying cross-border needs leading to the identification of possible infrastructure reinforcement needs at national level.

(5a) It shall analyse the ability of the Union electricity network to accommodate projected cross-border electricity exchanges under the central scenario and identify situations where network capacity may limit the efficient utilisation of generation resources across bidding zones.

(5b) It shall identify structural congestion patterns that persist across scenarios and time horizons and that materially affect market integration, system efficiency or security of supply at Union level, including where such congestion leads to persistent separation of bidding zones.

(6) It shall provide sufficient level of detail and granularity to properly consider current and future network constraints and enable subsequent identification of infrastructure needs on regional as well as national level. It shall also provide clear information on the necessary investments to address the infrastructure gaps as well as the cumulative benefits of these investments for the energy system..

(7) In electricity, it shall include DSO data, demand forecasts and system needs and consider infrastructure and grid enhancing technologies, with due consideration of renewable and low emission flexibility resources, including storage, which would lead to more optimised energy system. The matchmaking of needs with taking into account the specific characteristics and level of maturity of each sector projects submitted for inclusion in the Union wide ten-year network development shall be accompanied by an explanation how non-wire solutions, non-fossil flexibility or other alternatives to system expansion were taken into account.

(8) It shall be an outcome of a transparent process, based on robust tools and data, requiring up to date and verified cost assumptions. In this context, it shall use clear and quantifiable criteria for the set-up of the starting network. Key relevant stakeholders shall be involved into provision of inputs as well as validation of the results through the consultation process structured in a way to enable the accommodation of comments.

(8a) It shall consider the role of flexibility solutions, including energy storage and demand response, in addressing network constraints and supporting the efficient integration of renewable electricity generation.

(9) It shall deliver specific and quantified results allowing for measuring the magnitude of potential infrastructure gaps in specific locations, referring both grid enhancing technologies and conventional network reinforcement . To this aim, the identified needs should indicate to market participants the main cross-border transmission infrastructure gaps, including internal infrastructure with significant cross-border impact, that need to be addressed over the next ten to twenty years.

(9a) Where relevant, it shall ensure consistency with the methodology of the European Resources Adequacy Assessment referred to in Article 23 of Regulation (EU) 2019/943, and the methodology for the analysis of flexibility needs as referred to in Article 19e of Regulation (EU) 2024/1724.

Explanatory statement 8 paragraphs

The rapporteur welcomes the Commission proposal that seeks to adapt the TEN-E framework to the next phase of the Union’s energy transition. Recent geopolitical developments, including disruptions affecting a critical energy transit route, have once again shown that, in a context marked by electrification, the accelerated deployment of renewable energy, growing system integration needs, heightened geopolitical risk and the need to strengthen Europe’s industrial competitiveness, the timely development of cross-border energy infrastructure must be regarded not only as a long-term decarbonisation tool, but also as a matter of resilience, affordability and strategic security.

The rapporteur therefore supports the strategic objective of the proposal, namely to ensure that the Union has the planning tools, governance structures and implementation framework required to deliver the infrastructure necessary for climate neutrality, security of supply and a more integrated internal energy market. At the same time, the rapporteur considers that this revised framework must be more robust in demonstrating which projects are truly needed, more transparent in how planning choices are made, and more attentive to the impact of infrastructure investment on final consumers.

The main objective of the report is therefore to strengthen the evidence-based nature of TEN-E planning. The rapporteur supports the Commission’s move towards a stronger Union-level planning architecture based on a central scenario, infrastructure-needs identification and a more harmonised cost-benefit analysis. However, the report seeks to ensure that these elements are more than formal planning exercises. The report strengthens the requirement that infrastructure needs be clearly identified, quantified and linked to actual system performance, including the efficient use of existing and planned infrastructure. The report also requires a more systematic comparison between identified needs and the projects proposed to address them. In this way, the report aims to ensure that the Union list reflects genuine infrastructure priorities rather than a simple aggregation of candidate projects.

The rapporteur also seeks to make the revised TEN-E framework more cost-conscious and more consumer-oriented. Energy infrastructure is indispensable to decarbonisation and market integration, but the costs of building and reinforcing networks must be assessed in a way that protects households and businesses from disproportionate burdens. For that reason, the report introduces a stronger affordability dimension across the Regulation. It provides that infrastructure development should take place at the lowest overall cost to the system, strengthens the role of cost-effectiveness in project assessment, requires greater attention to the impact of projects on network tariffs and final electricity prices, and makes clear that implementation shortcomings and avoidable cost overruns should not simply be passed through to final customers. In the rapporteur’s view, accelerating investment and protecting affordability are not contradictory objectives: they are both necessary conditions for a durable and socially balanced energy transition.

Another important aim of the report is to ensure that TEN-E better integrate storage, flexibility and demand response into the planning framework and require a more explicit assessment of system utilisation, capacity availability and structural congestion. In particular, the report seeks to ensure that persistent price divergence between bidding zones and internal transmission constraints that materially affect cross-border electricity flows are properly reflected in project assessment. This is important because the functioning of the internal electricity market depends not only on interconnectors themselves, but also on whether surrounding infrastructure and system operation allow those interconnectors to be used effectively.

The report further strengthens transparency, accountability and follow-through in the planning process. It makes the role of sensitivity analysis more systematic, improves the publication of assumptions and underlying data, and requires clearer evidence as to whether proposed projects or project bundles actually address the needs identified. It also strengthens the corrective dimension of the framework by requiring the Commission to act where unmatched needs persist and by making the outcomes of those processes more transparent. This reflects the rapporteur’s view that the effectiveness of TEN-E will depend not only on better methodologies, but also on whether the framework can identify unresolved bottlenecks and produce timely corrective action where the market and existing project pipeline do not deliver adequate solutions.

At the same time, the report supports the strengthening of resilience and security considerations in the revised framework, while ensuring that these concerns are addressed in a proportionate and accountable manner. The rapporteur therefore backs the attention given to critical network elements and foreign-investment-related risks, but complements this with a stronger requirement for ownership transparency, foreign direct investment screening and notification of material post-designation changes in control. In parallel, the report preserves the importance of public participation and local engagement, notably by requiring clearer information and earlier engagement with directly affected communities in relevant cases. In doing so, the rapporteur seeks to improve both the strategic robustness and the societal legitimacy of TEN-E projects.

Finally, the report addresses implementation and financing discipline. It strengthens oversight of congestion income use and seek to ensure that those revenues contribute more effectively to relieving congestion and improving market integration. The report also reflects the reality that, in some cases, internal reinforcements may be decisive for increasing cross-border transfer capacity and reducing structural congestion. This is a practical and important clarification in a system where the value of cross-border infrastructure can be undermined by bottlenecks inside national networks. More broadly, the report aims to ensure that the benefits of infrastructure investment are better demonstrated, more fairly distributed and more closely aligned with the functioning of the internal market.

Annex: declaration of input 5 paragraphs

Pursuant to Article 8 of Annex I to the Rules of Procedure, the rapporteur declares that she included in her report input on matters pertaining to the subject of the file that she received, in the preparation of the report, prior to the adoption thereof in committee, from the following interest representatives falling within the scope of the Interinstitutional Agreement on a mandatory transparency register, or from the following representatives of public authorities of third countries, including their diplomatic missions and embassies:

1. Interest representatives falling within the scope of the Interinstitutional Agreement on a mandatory transparency register
Edison
RTE
ENNOH
ENTSO-E
EU DSO Entity
Green Industrial Grids Association
ENTSO-G
GD4S
ACER
Hydrogen Europe
Heinrich-Böll-Stiftung European Union
Schneider Electric
CurrENT
Tesla
Climate action Network Europe
Renewables Grid Initiative
2. Representatives of public authorities of third countries, including their diplomatic missions and embassies

The list above is drawn up under the exclusive responsibility of the rapporteur.

Where natural persons are identified in the list by their name, by their function or by both, the rapporteur declares that she has submitted to the natural persons concerned the European Parliament's Data Protection Notice No 484 (https://www.europarl.europa.eu/data-protect/index.do), which sets out the conditions applicable to the processing of their personal data and the rights linked to that processing.

24.6.2026

Opinion of the committee on the environment, climate and food safety 4 paragraphs

for the Committee on Industry, Research and Energy

on the proposal for a regulation of the European Parliament and of the Council on guidelines for trans-European energy infrastructure, amending Regulations (EU) 2019/942, (EU) 2019/943 and (EU) 2024/1789 and repealing Regulation (EU) 2022/869

(COM(2025)1006 – C100342/2025 – 2025/0399(COD))

Rapporteur for opinion: Elżbieta Katarzyna Łukacijewska

Short justification 8 paragraphs

In the current geopolitical context and following recent energy market disruptions, the rapporteur considers that the Union must strengthen its energy system to ensure security of supply, resilience and affordability, while remaining on track towards climate neutrality by 2050. The rapporteur underlines that achieving these objectives requires a well-functioning, fully integrated energy market supported by robust and forward-looking infrastructure planning covering electricity, renewable and low-carbon gases, hydrogen and other clean molecules.

The rapporteur underlines that, despite the challenges arising from the current geopolitical situation, the Union must remain firmly committed to its climate objectives and decarbonisation priorities. These objectives should not be weakened but rather pursued through a more integrated and efficient approach to energy system development. In this context, infrastructure projects should be designed in a complementary and mutually reinforcing manner, ensuring optimal system integration across electricity, gases and other energy carriers. The rapporteur emphasises that the core objective is to enable a coherent and integrated energy system that delivers on climate goals while ensuring cost-efficiency, avoiding unnecessary expenditure and maintaining energy infrastructure as a cornerstone of the Union’s economic stability and resilience.

The rapporteur considers that recent developments have demonstrated the necessity of diversification of energy sources and supply routes. No single technological pathway can address the needs of all Member States. The rapporteur therefore underlines the importance of home-grown energy, including renewable electricity as well as low-carbon solutions such as hydrogen, biomethane and synthetic fuels, where consistent with climate objectives and lifecycle emissions criteria, making use of the Union’s domestic potential, including agricultural resources and waste streams.

The rapporteur further considers that infrastructure planning must reflect the evolving composition of the energy system and increasing demand, including from emerging industrial uses, and should therefore avoid reliance on a single technological approach. In this context, the rapporteur underlines that system needs should be assessed holistically, including the contribution of firm and dispatchable low-carbon generation to system stability, congestion reduction and overall system efficiency.

A central objective of the amendments is to ensure the consistent application of the principle of technological neutrality, in line with Article 194(2) TFEU. The rapporteur considers that all relevant net-zero and low-carbon technologies should be assessed on the basis of their contribution to decarbonisation, security of supply and system stability, while fully respecting Member States’ right to determine their energy mix and ensuring consistency with the Union’s climate and environmental objectives.

The rapporteur also underlines the need to strengthen the resilience of the energy system, including through improved cyber and physical protection of critical infrastructure, as well as to ensure that infrastructure development is aligned with real system needs, avoids unnecessary costs and reduces environmental impact.

Consequently, the rapporteur considers robust governance indispensable to credible, implementable and environmentally sound infrastructure planning. The compromise confirms the Commission's central role in defining and adopting the central scenario, while ensuring it acts in cooperation with the Member States, in light of the national energy and climate plans, and adopts the final scenario only after consulting the Member States within the relevant Regional Groups. The technical expertise of ENTSO-E, ENTSOG and ENNOH is safeguarded and considered as crucial by the rapporteur, as they may develop additional models of the central scenario to identify needs not reflected in the Commission's modelling, acting as an early-warning mechanism for the robustness of the process.

Finally, the rapporteur considers that, in order to ensure the efficient use of existing assets and limit the need for new infrastructure, more emphasis should be put on the repurposing or/retrofitting of existing natural gas pipelines for the transport of renewable and low-carbon gases, including hydrogen, where technically and economically feasible. This approach reduces the need for resource-intensive new construction, thereby minimising environmental impacts, land use and ecosystem disruption, while supporting a cost-effective and timely energy transition in line with the Union’s climate objectives.

Amendments 323 paragraphs

The Committee on the Environment, Climate and Food Safety submits the following to the Committee on Industry, Research and Energy, as the committee responsible:

Amendment 1

Proposal for a regulation

Recital 1

Text proposed by the CommissionAmendment
(1) The Commission Communication of 26 February 2025 on the “Clean Industrial Deal”3 sets out a joint roadmap for competitiveness and decarbonisation. Securing affordable energy is a key condition for the competitiveness of the Union industry, especially for energy-intensive sectors. Access to affordable energy is therefore a cornerstone of the Clean Industrial Deal as well as the Action Plan for Affordable Energy4 . At the same time, decarbonisation policies are a powerful driver of growth when they are well integrated with industrial, competition, economic and trade policies as set out in the Commission Communication of 29 January 2025 on a “Competitiveness Compass for the EU”5 . With Regulation (EU) 2021/1119 of the European Parliament and of the Council6 , the Union has set out an ambitious framework to become a decarbonised economy by 2050.(1) The Commission Communication of 26 February 2025 on the “Clean Industrial Deal”3 sets out a joint roadmap for competitiveness and decarbonisation. Securing clean, reliable, home-grown and affordable energy is a key condition for the competitiveness of the Union industry, especially for energy-intensive sectors. Access to affordable energy is therefore a cornerstone of the Clean Industrial Deal as well as the Action Plan for Affordable Energy4 . The Action Plan for Affordable Energy also indicates that every person, community, and business should benefit from the clean transition, and identifies investments in modernising and expanding the electricity network as essential to facilitate the deployment of renewables, electrification and new industrial and business demand. At the same time, decarbonisation policies are a powerful driver of growth when they are well integrated with industrial, competition, economic and trade policies as set out in the Commission Communication of 29 January 2025 on a “Competitiveness Compass for the EU”5 . With Regulation (EU) 2021/1119 of the European Parliament and of the Council6 , the Union has set out an ambitious framework to become a climate neutral economy by 2050.
3 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025, “The Clean Industrial Deal: A joint roadmap for competitiveness and decarbonisation” (COM(2025) 85 final).3 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025, “The Clean Industrial Deal: A joint roadmap for competitiveness and decarbonisation” (COM(2025) 85 final).
4 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025: “Action Plan for Affordable Energy - Unlocking the true value of our Energy Union to secure affordable, efficient and clean energy for all Europeans”, COM(2025) 79 final.4 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025: “Action Plan for Affordable Energy - Unlocking the true value of our Energy Union to secure affordable, efficient and clean energy for all Europeans”, COM(2025) 79 final.
5 Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions of 29 January 2025, “A Competitiveness Compass for the EU” (COM(2025) 30 final).5 Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions of 29 January 2025, “A Competitiveness Compass for the EU” (COM(2025) 30 final).
6 Regulation (EU) 2021/1119 of the European Parliament and of the Council of 30 June 2021 establishing the framework for achieving climate neutrality and amending Regulations (EC) No 401/2009 and (EU) 2018/1999 (‘European Climate Law’) (OJ L 243, 9.7.2021, p. 1, ELI: http://data.europa.eu/eli/reg/2021/1119/oj).6 Regulation (EU) 2021/1119 of the European Parliament and of the Council of 30 June 2021 establishing the framework for achieving climate neutrality and amending Regulations (EC) No 401/2009 and (EU) 2018/1999 (‘European Climate Law’) (OJ L 243, 9.7.2021, p. 1, ELI: http://data.europa.eu/eli/reg/2021/1119/oj).

Amendment 2

Proposal for a regulation

Recital 2

Text proposed by the CommissionAmendment
(2) As part of the ambition of Regulation (EU) 2021/1119, the binding Union level target for renewable energy for 2030 has been increased to 42.5 % renewable energy in the Union’s energy mix by 2030, aiming for 45 %7 , and the binding Union level target for energy efficiency has been made more ambitious, with a reduction of Union final energy consumption by 11.7 % by 2030, compared to 2020 projections8 . With the intermediate target of at least 55 % net greenhouse gas (GHG) emissions reduction compared with 1990 levels by 2030 well on track, on 2 July 2025 the Commission proposed an amendment to Regulation (EU) 2021/11199 setting a Union climate target for 2040 of a 90 % reduction in net GHG emissions, compared to 1990 levels.(2) As part of the ambition of Regulation (EU) 2021/1119, the binding Union level target for renewable energy for 2030 has been increased to 42.5 % renewable energy in the Union’s energy mix by 2030, aiming for 45 %7 , and the binding Union level target for energy efficiency has been made more ambitious, with a reduction of Union final energy consumption by 11.7 % by 2030, compared to 2020 projections8 . With the intermediate target of at least 55 % net greenhouse gas (GHG) emissions reduction compared with 1990 levels by 2030 well on track, on 2 July 2025 the Commission proposed an amendment to Regulation (EU) 2021/11199 setting a Union climate target for 2040 of a 90 % reduction in net GHG emissions, compared to 1990 levels and helps reduce dependency risks and shoring up the security of supply.
7 Directive (EU) 2023/2413 of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652 (OJ L, 2023/2413, 31.10.2023, ELI: http://data.europa.eu/eli/dir/2023/2413/oj).7 Directive (EU) 2023/2413 of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652 (OJ L, 2023/2413, 31.10.2023, ELI: http://data.europa.eu/eli/dir/2023/2413/oj).
8 Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency and amending Regulation (EU) 2023/955 (OJ L 231, 20.9.2023, p.1, ELI: http://data.europa.eu/eli/dir/2023/1791/oj).8 Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency and amending Regulation (EU) 2023/955 (OJ L 231, 20.9.2023, p.1, ELI: http://data.europa.eu/eli/dir/2023/1791/oj).
9 COM(2025) 524 final of 2 July 2025.9 COM(2025) 524 final of 2 July 2025.

Amendment 3

Proposal for a regulation

Recital 3

Text proposed by the CommissionAmendment
(3) Infrastructure needs to be in place to support the Union energy transition in accordance with those targets, including rapid electrification, scaling up renewable and fossil fuel free electricity generation, the increased use of renewable and low-carbon gases, energy integration and a higher uptake of innovative solutions. Current investments in cross-border energy infrastructure are clearly insufficient to transform and build the energy infrastructure needed to support those targets and there is a substantial gap between our cross-border electricity infrastructure needs and the speed and level of infrastructure development at both the transmission and distribution grid level.10 For electricity, about half of cross-border electricity needs for 2030 (41 of 88 GW) will remain unaddressed, and this gap is expected to increase the next decade. By 2040, cross-border electricity capacity needs will amount to 108 GW.11 . Increased investments in energy infrastructure are therefore necessary, and the Draghi report12 pointed in particular to the need to rapidly increase the deployment of cross-border energy infrastructure to decarbonise Europe’s industry. In the Clean Industrial Deal13 and the accompanying “Action Plan for Affordable Energy”14 , the Commission underlined the crucial role of completing the Energy Union by investing in energy infrastructure and cross-border grids for safeguarding the competitiveness of Union industry and the prosperity of people as well as for the affordability and security of energy supply.(3) Infrastructure needs to be in place to support the Union energy transition in accordance with those targets, including rapid electrification, scaling up renewable, fossil fuel free electricity generation, the increased use of renewable and low-carbon gases, energy integration and a higher uptake of innovative solutions and solutions based on net-zero technologies as defined in Regulation (EU) 2024/17359a, in accordance with the principle of technological neutrality. Current investments in cross-border energy infrastructure are clearly insufficient to transform and build the energy infrastructure needed to support those targets and there is a substantial gap between our cross-border electricity infrastructure needs and the speed and level of infrastructure development at both the transmission and distribution grid level.10 For electricity, about half of cross-border electricity needs for 2030 (41 of 88 GW) will remain unaddressed, and this gap is expected to increase the next decade. By 2040, cross-border electricity capacity needs will amount to 108 GW.11 . Increased investments in energy infrastructure are therefore necessary, and the Draghi report12 pointed in particular to the need to rapidly increase the deployment of cross-border energy infrastructure to decarbonise Europe’s industry. In the Clean Industrial Deal13 and the accompanying “Action Plan for Affordable Energy”14 , the Commission underlined the crucial role of completing the Energy Union by investing in energy infrastructure and cross-border grids for safeguarding the competitiveness of Union industry and the prosperity of people as well as for the affordability and security of energy supply. To ensure consistency between Union funding instruments and the evolving policy framework supporting the deployment of net-zero technologies, the TEN-E should enable support for cross-border projects contributing to the deployment and system integration of net-zero technologies, in addition to projects based on renewable energy cooperation.
9a Regulation (EU) 2024/1735 of the European Parliament and of the Council of 13 June 2024 on establishing a framework of measures for strengthening Europe’s net-zero technology manufacturing ecosystem and amending Regulation (EU) 2018/1724 (OJ L, 2024/1735, 28.6.2024, ELI: http://data.europa.eu/eli/reg/2024/1735/oj).
10 ACER (2024): Electricity infrastructure development to support a competitive and sustainable energy system (2024 Monitoring Report)10 ACER (2024): Electricity infrastructure development to support a competitive and sustainable energy system (2024 Monitoring Report)
11 ENTSO-E (2025), TYNDP 2024. Opportunities for a more efficient European power system by 2050. Infrastructure Gaps Report.11 ENTSO-E (2025), TYNDP 2024. Opportunities for a more efficient European power system by 2050. Infrastructure Gaps Report.
12 M. Draghi (2025): “The future of European competitiveness”.12 M. Draghi (2025): “The future of European competitiveness”.
13 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025, “The Clean Industrial Deal: A joint roadmap for competitiveness and decarbonisation”, COM(2025) 85 final.13 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025, “The Clean Industrial Deal: A joint roadmap for competitiveness and decarbonisation”, COM(2025) 85 final.
14 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025, “Action Plan for Affordable Energy - Unlocking the true value of our Energy Union to secure affordable, efficient and clean energy for all Europeans” (COM(2025) 79 final).14 Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions of 26 February 2025, “Action Plan for Affordable Energy - Unlocking the true value of our Energy Union to secure affordable, efficient and clean energy for all Europeans” (COM(2025) 79 final).

Amendment 4

Proposal for a regulation

Recital 3 a (new)

Text proposed by the CommissionAmendment
(3a) Increasing pressure on electricity grids due to rapid electrification and rising demand underscores the need for firm, dispatchable generation that can strengthen grid stability and alleviate transmission congestion. Nuclear energy, particularly advanced technologies, may, for Member States that choose to include this energy source in their national energy mix, provide a reliable source of electricity that enhances system performance by delivering flexible, dispatchable power with grid-supporting characteristics that maintain frequency stability, reduce fluctuations, and may contribute to enabling the integration of variable renewable energy. For those Member States, and where relevant, the infrastructure required to connect this capacity to trans-European transmission networks could be part of the cross-border projects considered in the Union-level planning alongside offshore and onshore renewable energy infrastructure, supporting energy security, market integration, and affordable energy prices.

Amendment 5

Proposal for a regulation

Recital 3 b (new)

Text proposed by the CommissionAmendment
(3b) The expansion, upgrade, development, and integration of the trans-European energy network should be planned and deployed in accordance with the principle of technological neutrality. This implies that Union support should not favour or discriminate against specific technologies or technical solutions, where different technologies are capable of contributing to environmental sustainability and climate objectives, as well as to deliver future-proof, interoperable, and resilient infrastructure.

Amendment 6

Proposal for a regulation

Recital 3 c (new)

Text proposed by the CommissionAmendment
(3c) In the current geopolitical context, strengthening the Union’s energy security, industrial competitiveness and strategic resilience require the accelerated deployment of cross-border energy infrastructure that supports electrification, the integration of renewable and low-carbon energy sources and system flexibility. Existing Union legislation and instruments, including the Clean Industrial Deal, the Action Plan for Affordable Energy, the Net-Zero Industry Act, the decarbonised gas and hydrogen package, the Innovation Fund and the Connecting Europe Facility, provide dedicated frameworks and support mechanisms to facilitate the development of net-zero technologies and industrial decarbonisation. In this context, this Regulation should focus on those cross-border infrastructure projects that deliver clear European added value, contribute to market integration, affordability, security of supply and climate neutrality, while ensuring the efficient use, modernisation and repurposing of existing assets, where technically and economically justified.

Amendment 7

Proposal for a regulation

Recital 5

Text proposed by the CommissionAmendment
(5) While the objectives of Regulation (EU) 2022/869 remain largely valid, the current trans-European energy networks framework should be adjusted to fully reflect the expected changes to the energy system that will result from the new policy context and in particular the 2050 climate neutrality objective and the proposed intermediary target for 2040. In particular, there is a need for more integrated grid planning to support an increasingly interdependent and decentralised internal energy market, faster permit granting processes and to ensure the security and resilience of cross-border energy infrastructure to be adequately reflected in the revised trans-European energy networks framework. Besides the new political context and objectives, technological development has been rapid in the past decade. That development should be taken into account in the energy infrastructure categories covered by this Regulation, the selection criteria for projects of common interest and projects of mutual interest as well as the priority corridors and areas. At the same time, the provisions of this Regulation should not affect a Member State’s right to determine the conditions for exploiting its energy resources, its choice between different energy sources and the general structure of its energy supply, in accordance with Article 194 of the Treaty.(5) While the objectives of Regulation (EU) 2022/869 remain largely valid, the current trans-European energy networks framework should be adjusted to fully reflect the expected changes to the energy system that will result from the new policy context and in particular the 2050 climate neutrality objective and the proposed intermediary target for 2040. In particular, there is a need for more integrated grid planning, including super grids connecting Member States and the Union's neighbouring regions, to support an increasingly interdependent and decentralised internal energy market, faster permit granting processes and to ensure the security and resilience of cross-border energy infrastructure to be adequately reflected in the revised trans-European energy networks framework. Besides the new political context and objectives, technological development has been rapid in the past decade. That development should be taken into account in the energy infrastructure categories covered by this Regulation, the selection criteria for projects of common interest and projects of mutual interest as well as the priority corridors and areas. At the same time, the provisions of this Regulation should not affect a Member State’s right to determine the conditions for exploiting its energy resources, its choice between different energy sources and the general structure of its energy supply, in accordance with Article 194 of the Treaty.

Amendment 8

Proposal for a regulation

Recital 5 a (new)

Text proposed by the CommissionAmendment
(5a) In order to ensure cost-efficiency, affordability for consumers and alignment with Union climate objectives, the selection of infrastructure under this Regulation should be based on technologies and system solutions that are mature, scalable and economically competitive.

Amendment 9

Proposal for a regulation

Recital 6

Text proposed by the CommissionAmendment
(6) The implementation of the identified 13 trans-European energy infrastructure priority corridors and thematic areas is essential for the achievement of the Union’s energy and climate targets including further market integration, energy security, the 2050 climate neutrality objective as well as affordability of energy prices. Those priorities cover investments in electricity transmission and storage, offshore grids for renewable energy, smart electricity grids, equipment and installation designed to ensure protection and resilience of existing critical network elements, hydrogen transmission, storage and terminals, electrolysers, and the transport and storage of carbon dioxide as well as monitoring, control and digitalisation equipment and installation essential for existing high-voltage networks of cross-border relevance.(6) The implementation of the identified 13 trans-European energy infrastructure priority corridors and thematic areas is essential for the achievement of the Union’s energy and climate, pollution and biodiversity targets including further market integration, energy security, the 2050 climate neutrality objective as well as affordability of energy prices. Those priorities cover investments in electricity transmission, conversion and storage, offshore grids for renewable energy, super grids, smart electricity grids, strategic infrastructure supporting the production, integration and transport of fossil-fuel-free energy, and transport of biomethane produced from renewable sources, equipment and installation designed to ensure protection and resilience of existing critical network elements, hydrogen transmission, conversion, storage and terminals, electrolysers and the transport and storage of carbon dioxide as well as monitoring, control and digitalisation equipment and installation essential for existing high-voltage networks of cross-border relevance. The priority corridors also cover investments in stand-alone or supporting infrastructure, including connection components and other eligible technologies, where such elements enable the cost-effective deployment, integration or use of the network or of diverse generation mixes in line with the objectives of this Regulation. Where applicable and economically justified, the connection of energy generation facilities to transmission or distribution networks, where such connection forms an integral part of the project and effectively enables the integration, operation or use of the network, may be considered as contributing to the cost-effective deployment of infrastructure and to the integration of diverse generation mixes in line with the objectives of this Regulation.

Amendment 10

Proposal for a regulation

Recital 6 a (new)

Text proposed by the CommissionAmendment
(6a) Achieving the Union’s objectives of climate neutrality by 2050, security of supply, and industrial competitiveness requires, in line with the principle of technological neutrality, the timely deployment and system integration of a broad range of net-zero technologies. Cross-border cooperation can help overcome coordination challenges, reduce costs, and accelerate deployment, particularly for projects involving multi-jurisdictional permitting, shared benefits and risks, or coordinated planning and investment across Member States. Therefore, in addition to the priorities identified in the TEN-E Regulation, this Regulation should support cross-border energy and infrastructure projects contributing to the deployment of net-zero technologies recognised under Union law, including those within the scope of Regulation (EU) 2024/1735 and activities substantially contributing to climate change mitigation under Regulation (EU) 2020/852, where such projects demonstrably address cross-border coordination needs or deliver system-wide benefits that would not be realised through national action alone, without prejudice to Member States’ right to determine their energy mix in accordance with the Treaties.

Amendment 11

Proposal for a regulation

Recital 6 b (new)

Text proposed by the CommissionAmendment
(6b) The integration of clean molecules other than hydrogen could play a role in the future for the decarbonisation, resilience, interoperability and flexibility of the Union's energy system. Infrastructure enabling the transport, storage, conversion and system integration of renewable gases, may support sector integration across the electricity, gas, thermal and industrial systems, and contribute to security of supply. The development of such infrastructure could complement existing infrastructure priorities under this Regulation. Therefore, the Commission may take such integration into account, where appropriate, in the context of a review of this Regulation.

Amendment 12

Proposal for a regulation

Recital 7

Text proposed by the CommissionAmendment
(7) The Union’s energy infrastructure should be upgraded in order to increase its resilience against natural or man-made disasters, adverse effects of climate change, deliberate hostile actions and threats to its security, in particular as regards European critical infrastructures pursuant to Directive 2022/2557 of the European Parliament and of the Council16 .(7) The Union’s energy infrastructure should be upgraded in order to increase its resilience against natural or man-made disasters, adverse effects of climate change and geopolitical crises, deliberate hostile actions, threats to its security and external interference, in particular as regards European critical infrastructures pursuant to Directive 2022/2557 of the European Parliament and of the Council16 . and a high common level of cybersecurity across the Union pursuant to Directive (EU) 2022/2555 of the European Parliament and of the Council16a. A well-functioning, resilient and interconnected energy infrastructure is essential for the Union’s security of supply, the functioning of the internal energy market, and solidarity among Member States. Given the increasing geopolitical, cyber, climate and technical risks, Union-funded energy infrastructure should support system resilience, including preparedness for disruptions and rapid recovery in case of failure. Network planning and design should also consider these and other risks, with particular attention to the vulnerability of centralized infrastructure to natural and man-made disasters and the effects of sustained climate variability on the energy system and its elements. The resilience of trans-European energy infrastructure is a cross-cutting objective encompassing two complementary requirements: the capacity to withstand deliberate hostile actions, sabotage, and other security threats, including physical, cyber, and hybrid threats; and the ability to adapt to the adverse effects of climate change, including the increasing frequency and intensity of extreme weather events and long-term changes in average climate conditions that may reduce the capacity, efficiency and lifespan of energy infrastructure assets. These requirements apply to all energy infrastructure categories and carriers subject to this Regulation and are relevant across interconnected networks. Given these systemic interdependencies, infrastructure resilience should be addressed in a comprehensive, integrated and cross-sectoral manner, consistent with the 'one energy system' concept referred to in this Regulation, and should not be limited to individual infrastructure categories or specific types of hazard. Infrastructure projects should align with the principles outlined in the Commission Notice Technical Guidance on the climate proofing of infrastructure in the period 2021-202716b. The integration from the earliest planning and design stages of ecosystem-based features into infrastructure projects can enhance efficiencies, support climate change mitigation and resilience, reduce pollution, increase biodiversity, and benefit human well-being and health, while ensuring that the infrastructure remains safe, functional and adaptable throughout its lifecycle. Where relevant, the planning and design processes should include an assessment of the potential for integrating such features. The Commission should provide guidance and a template to facilitate this assessment.
16 Directive EU) 2022/2557 of the European Parliament and of the Council of 14 December 2022 on the resilience of critical entities and repealing Council Directive 2008/114/EC (OJ L 333, 27.12.2022, p. 164, ELI: http://data.europa.eu/eli/dir/2022/2557/oj).16 Directive EU) 2022/2557 of the European Parliament and of the Council of 14 December 2022 on the resilience of critical entities and repealing Council Directive 2008/114/EC (OJ L 333, 27.12.2022, p. 164, ELI: http://data.europa.eu/eli/dir/2022/2557/oj).
16a Directive (EU) 2022/2555 of the European Parliament and of the Council of 14 December 2022 on measures for a high common level of cybersecurity across the Union, amending Regulation (EU) No 910/2014 and Directive (EU) 2018/1972, and repealing Directive (EU) 2016/1148 (NIS 2 Directive) (OJ L 333, 27.12.2022, p. 80, ELI http://data.europa.eu/eli/dir/2022/2555/oj).
16b Commission Notice ‘Technical Guidance on the climate proofing of infrastructure in the period 2021-2027’, C(2021) 5430 final.

Amendment 13

Proposal for a regulation

Recital 8

Text proposed by the CommissionAmendment
(8) In the current geopolitical context, it is important to ensure the uninterrupted flow of electricity across borders to ensure security of supply. This depends not only on the resilience of interconnectors between Member States, but also on the resilience of critical network elements. Therefore, this Regulation should introduce a new infrastructure category in the form of investments into equipment and installations directly connected to and designed to enhance the critical network elements’ resilience and protection. That new infrastructure category should cover critical network elements, as set out in Regulation (EU) 2019/943 of the European Parliament and of the Council17 , that support network security and supply security in accordance with the Member States’ crisis scenarios and risk preparedness plans under Regulation (EU) 2019/941 of the European Parliament and of the Council18 .(8) In the current geopolitical context, it is important to ensure the uninterrupted flow of electricity across borders to ensure security of supply. To this end, the Commission’s upcoming proposal for the revision of the energy security framework should aim to strengthen the Union’s energy security by ensuring that the Union energy system remains secure, resilient and adaptable to an evolving energy, climate and geopolitical landscape. The resilience of energy infrastructure constitutes a shared challenge across all network sectors, and the protection of critical network elements needs therefore to be addressed in a comprehensive manner across electricity, hydrogen, renewable gas, carbon dioxide transport and storage, and other eligible energy infrastructure and carriers subject to this Regulation. Security of supply depends not only on the resilience of interconnectors between Member States, but also on the resilience of critical network elements. Therefore, this Regulation should introduce a new infrastructure category, in the form of investments into equipment and installations directly connected to and designed to enhance the resilience and protection of critical network elements. That new infrastructure category should cover critical network elements across all network sectors covered by Regulation (EU) 2019/943 of the European Parliament and of the Council17 , that support network security and supply security in accordance with the Member States’ crisis scenarios and risk preparedness plans under Regulation (EU) 2019/941 of the European Parliament and of the Council18 . Where relevant, energy infrastructure projects may include interoperability or interface capacity with strategic systems for the purpose of enhancing crisis response capabilities.
17 Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (OJ L 158, 14.6.2019, p. 54, ELI: http://data.europa.eu/eli/reg/2019/943/oj).17 Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (OJ L 158, 14.6.2019, p. 54, ELI: http://data.europa.eu/eli/reg/2019/943/oj).
18 Regulation (EU) 2019/941 of the European Parliament and of the Council of 5 June 2019 on risk-preparedness in the electricity sector and repealing Directive 2005/89/EC (OJ L 158, 14.6.2019, p. 1, ELI: http://data.europa.eu/eli/reg/2019/941/oj).18 Regulation (EU) 2019/941 of the European Parliament and of the Council of 5 June 2019 on risk-preparedness in the electricity sector and repealing Directive 2005/89/EC (OJ L 158, 14.6.2019, p. 1, ELI: http://data.europa.eu/eli/reg/2019/941/oj).

Amendment 14

Proposal for a regulation

Recital 12

Text proposed by the CommissionAmendment
(12) Regional groups (Groups) should be established for the purpose of proposing and reviewing projects of common interest and projects of mutual interest, leading to the establishment of regional lists of projects of common interest and projects of mutual interest. In order to ensure broad consensus, those Groups should include and ensure close cooperation between Member States, national regulatory authorities, project promoters and relevant stakeholders. In the context of that cooperation, national regulatory authorities should, where necessary, advise Groups, inter alia, on the feasibility of the national regulatory aspects of proposed projects and on the feasibility of the proposed timetable for regulatory approval.(12) Regional groups (Groups) should be established for the purpose of proposing and reviewing projects of common interest and projects of mutual interest, leading to the establishment of regional lists of projects of common interest and projects of mutual interest. In order to ensure broad consensus, those Groups should include and ensure close cooperation between Member States, national regulatory authorities, project promoters and relevant stakeholders. The composition, the activity and decisions of Regionals Groups should be accessible to public and published on the PCI transparency Platform website. In the context of that cooperation, national regulatory authorities should, where necessary, advise Groups, inter alia, on the feasibility of the national regulatory aspects of proposed projects and on the feasibility of the proposed timetable for regulatory approval.

Amendment 15

Proposal for a regulation

Recital 15

Text proposed by the CommissionAmendment
(15) A new Union list of projects of common interest and projects of mutual interest (“the Union list”) should be established every two years. Projects of common interest and projects of mutual interest that have been completed or that no longer fulfil the relevant criteria and requirements as set out in this Regulation should not appear on the subsequent Union list.(15) A new Union list of projects of common interest and projects of mutual interest (“the Union list”) should be established every two years. Projects of common interest and projects of mutual interest that have been completed or that no longer fulfil the relevant criteria and requirements as set out in this Regulation should not appear on the subsequent Union list. In light of evolving political priorities and the rapid technological developments, those developments should be taken into account in the energy infrastructure categories covered by future reviews of this Regulation, as well as in the selection criteria for projects of common interest and projects of mutual interest and the definition of priority corridors and areas.

Amendment 16

Proposal for a regulation

Recital 18

Text proposed by the CommissionAmendment
(18) Projects of common interest and projects of mutual interest should comply with common, transparent and objective general and specific criteria in view of their contribution to the energy policy objectives. In order to be eligible for inclusion in the Union list, proposed electricity projects, with the exception of smart electricity grids and projects specifically designed to provide protection and resilience to existing critical network elements, should be part of the latest available Union-wide ten-year network development plan. Likewise, proposed hydrogen and electrolyser projects should be part of the latest available Union-wide ten-year network development plan.(18) Projects of common interest and projects of mutual interest should comply with common, transparent and objective general and specific criteria in view of their contribution to the energy policy objectives, including supply security, industrial competitiveness, and energy infrastructure resilience, without unjustified technological discrimination. In order to be eligible for inclusion in the Union list, proposed electricity projects, with the exception of smart electricity grids and projects specifically designed to provide protection and resilience to existing critical network elements, should be part of the latest available Union-wide ten-year network development plan. Likewise, proposed hydrogen and electrolyser projects should be included, together with projects involving the adaptation or repurposing of existing infrastructure and equipment, where technically feasible and most efficient, in the latest available Union-wide ten-year network development plan.

Amendment 17

Proposal for a regulation

Recital 21

Text proposed by the CommissionAmendment
(21) The Union should facilitate infrastructure projects linking Union networks directly with third-country networks which are mutually beneficial and necessary for the energy transition and the achievement of the climate targets, and which also meet the specific criteria of the relevant infrastructure categories pursuant to this Regulation. To reinforce the focus on cross-border projects and to maintain complementarity with the Union’s external policy, in the case of projects of mutual interest, the projects should directly connect a Member State with the first electricity network connection point or the first hydrogen or carbon dioxide connection point in the third country.(21) The Union should facilitate infrastructure projects linking Union networks directly with third-country networks, including cross-border and super grids, which are mutually beneficial and necessary for the energy transition and the achievement of the climate targets, and which also meet the specific criteria of the relevant infrastructure categories pursuant to this Regulation. To reinforce the focus on cross-border projects and to maintain complementarity with the Union’s external policy, in the case of projects of mutual interest, the projects should directly connect a Member State with the first network connection point of corresponding infrastructure located in the third country.

Amendment 18

Proposal for a regulation

Recital 23

Text proposed by the CommissionAmendment
(23) It is necessary to ensure that projects of mutual interest, which are granted priority treatment, genuinely advance the Union’s internal market, security of supply and climate neutrality objectives. Therefore, projects of mutual interest should be eligible for inclusion in the Union list only where the policy framework of a third country involved has a high level of convergence and is supported by enforcement mechanisms, and such projects demonstrate a contribution to the Union’s and the third countries’ overall energy and climate policy objectives in terms of security of supply and decarbonisation.(23) It is necessary to ensure that projects of mutual interest, which are granted priority treatment, genuinely advance the Union’s internal market, circular economy, security of supply and climate neutrality objectives, in full alignment with the principle of technological neutrality. Therefore, projects of mutual interest should be eligible for inclusion in the Union list only where the policy framework of a third country involved has a high level of convergence and is supported by enforcement mechanisms, and such projects demonstrate a contribution to the Union’s and the third countries’ overall energy and climate policy objectives in terms of security of supply and decarbonisation.

Amendment 19

Proposal for a regulation

Recital 29

Text proposed by the CommissionAmendment
(29) The permit-granting process should neither lead to administrative burdens which are disproportionate to the size or complexity of a project, nor create barriers to the development of the trans-European networks and market access.(29) The permit-granting process should neither lead to administrative burdens which are disproportionate to the size or complexity of a project, nor create barriers to the development of the trans-European networks and market access. The process should include adequate information provision and stakeholder consultation, while upholding Union or national laws regarding access to justice in environmental matters.

Amendment 20

Proposal for a regulation

Recital 37

Text proposed by the CommissionAmendment
(37) In order to speed up the deployment of the trans-European energy network, the conditions for applying specific derogations as set out in Union environmental legislation should be clear. In particular, when assessing whether there are satisfactory alternative solutions to energy projects, the scope of such assessment should be limited to alternative solutions that ensure the achievement of the same objective within the same or similar timeframe and without resulting in significantly higher costs. When comparing the timeframe and the cost of satisfactory alternative solutions, the relevant authorities should be able to take into account the need to deploy projects of common interest and projects of mutual interest in an accelerated and cost-effective manner in accordance with the priorities set out in their integrated national energy and climate plans and updates thereof submitted to the Commission pursuant to Regulation (EU) 2018/1999.(37) In order to speed up the deployment of the trans-European energy network, the conditions for applying specific derogations as set out in Union environmental legislation should be clear. In particular, when assessing whether there are satisfactory alternative solutions to energy projects, the scope of such assessment should be limited to alternative solutions that ensure the achievement of the same objective within the same or similar timeframe, without significantly increasing costs or reducing system resilience. The assessment should rely on the best available scientific and technical knowledge. When comparing the timeframe and the cost of satisfactory alternative solutions, the relevant authorities should be able to take into account the need to deploy projects of common interest and projects of mutual interest in an accelerated and cost-effective manner in accordance with the priorities set out in their integrated national energy and climate plans and updates thereof submitted to the Commission pursuant to Regulation (EU) 2018/1999.

Amendment 21

Proposal for a regulation

Recital 46

Text proposed by the CommissionAmendment
(46) It is important to streamline and improve the permit-granting process, while respecting, to the extent possible and with due regard to the principle of subsidiarity, national competences and procedures for the construction of new energy infrastructure. Given the urgency of developing energy infrastructures, the simplification of the permit-granting process should set a clear time limit for the decision of the relevant authorities regarding the construction of the project. That time limit should stimulate an efficient definition and handling of procedures. This Regulation should establish maximum time limits. However, Member States can strive to achieve shorter time limits where feasible, in particular, as regards projects such as smart grids, which may not require as complex a permit-granting process as the one for transmission infrastructure.(46) It is important to streamline and improve the permit-granting process, while respecting, to the extent possible and with due regard to the principle of subsidiarity, national competences and procedures for the construction of new energy infrastructure. Given the urgency of developing and strengthening energy infrastructures, the simplification of the permit-granting process should set a clear time limit for the decision of the relevant authorities regarding the construction of the project. That time limit should stimulate an efficient definition and handling of procedures. This Regulation should establish maximum time limits. However, Member States can strive to achieve shorter time limits where feasible, in particular, as regards projects such as smart grids, which may not require as complex a permit-granting process as the one for transmission infrastructure.

Amendment 22

Proposal for a regulation

Recital 47

Text proposed by the CommissionAmendment
(47) The lack of resources of permit-granting authorities and the lack of digitalisation of permit-granting processes and data availability are bottlenecks slowing down permit-granting processes. Digitalisation and an appropriate use of artificial intelligence features are expected to speed up procedures and to increase efficiency of processes by allowing for faster handling of applications and increase transparency through improved access to information on procedural steps and requirements. However, digitalisation of permit-granting processes is lagging behind, with data often scattered across different competent authorities without unified digital processes or platforms, and without interoperability being ensured. That leads to lack of clarity on the status of the applications and hindering the identification of bottlenecks. Therefore, Member States should set up a digital platform at national level for all the steps of the permit-granting processes for renewable energy, storage and grid projects so that the digitalisation of procedures is uniform, interoperable and transparent maximising its benefits in terms of speeding up the permit-granting process. Such platforms should enable project promoters to file applications and check their status, attribute them to the competent authorities, and allow authorities to process them by having access to all relevant data and information, without the need for intermediate paper-based steps. In addition, such platform should allow for the extraction of statistics on the overall progress of permit-granting processes in Member States. Such digital platforms should rely on secure and interoperable means provided through European Digital Identity Wallets, in compliance with the requirements of Regulation (EU) No 910/2014, for natural persons and, in the future, with European Business Wallets, in compliance with [Regulation (EU) No XXX/20YY], for legal persons, for enabling electronic identification and authentication, signing or sealing of documents, submission of documents and sending or receiving notifications between competent authorities and economic operators(47) The lack of resources of permit-granting authorities and the lack of digitalisation of permit-granting processes and data availability are bottlenecks slowing down permit-granting processes. Digitalisation and an appropriate use of artificial intelligence features are expected to speed up procedures and to increase efficiency of processes by allowing for faster handling of applications and increase transparency through improved access to information on procedural steps and requirements. However, digitalisation of permit-granting processes is lagging behind, with data often scattered across different competent authorities without unified digital processes or platforms, and without interoperability being ensured. That leads to lack of clarity on the status of the applications and hindering the identification of bottlenecks. Therefore, Member States should make available a digital portal at national level for all the steps of the permit-granting processes for renewable energy, storage and grid projects so that the digitalisation of procedures is uniform, interoperable and transparent maximising its benefits in terms of speeding up the permit-granting process. Such portals should enable project promoters to file applications and check their status, attribute them to the competent authorities, and allow authorities to process them by having access to all relevant data and information, without the need for intermediate paper-based steps. In addition, such portals should allow for the extraction of statistics on the overall progress of permit-granting processes in Member States. Such portals should rely on secure and interoperable means provided through European Digital Identity Wallets, in compliance with the requirements of Regulation (EU) No 910/2014, for natural persons and, in the future, with European Business Wallets, in compliance with [Regulation (EU) No XXX/20YY], for legal persons, for enabling electronic identification and authentication, signing or sealing of documents, submission of documents and sending or receiving notifications between competent authorities and economic operators. Portal operators should provide a dedicated contact point that project promoters and other stakeholders can reach out to in case of technical issues with the digital portal.

Amendment 23

Proposal for a regulation

Recital 52

Text proposed by the CommissionAmendment
(52) The Union-wide ten-year network development plan process provides a solid basis for the identification of projects of common interest and projects of mutual interest. While the European Network of Transmission System Operators for Electricity (ENTSO for Electricity), the European Network of Transmission System Operators for Gas (ENTSO for Gas), the European Network of Network Operators for Hydrogen (ENNOH) and TSOs continue to play an important role in the process, more streamlining and steering is required, in particular as regards defining the scenarios for the future, identifying long-term infrastructure gaps and energy infrastructure bottlenecks and addressing those gaps with most adequate solutions, to increase the political weight, pertinence and robustness of the process. Therefore, the Agency and the Commission should have an increased role in the process for drawing up the Union-wide ten-year network development plans pursuant to Regulations (EU) 2019/943 and (EU) 2024/1789.(52) The Union-wide ten-year network development plan process provides a solid basis for the identification of projects of common interest and projects of mutual interest. While the European Network of Transmission System Operators for Electricity (ENTSO for Electricity), the European Network of Transmission System Operators for Gas (ENTSO for Gas), the European Network of Network Operators for Hydrogen (ENNOH) and TSOs continue to play an important role in the process, more streamlining and steering is required, in particular as regards defining the scenarios for the future, identifying long-term infrastructure gaps and energy infrastructure bottlenecks and addressing those gaps with most adequate solutions, to increase the political weight, pertinence and robustness of the process. The Agency and the Commission should enhance their planning and coordination role in the process for drawing up the Union-wide ten-year network development plans pursuant to Regulations (EU) 2019/943 and (EU) 2024/1789, leveraging the increasing involvement of ENTSO for Electricity, ENTSO for Gas, ENNOH, and TSOs in identifying infrastructure needs and providing relevant input to the network development plans, while preventing possible conflicts of interest resulting from the joint role of system planner and project promoter.

Amendment 24

Proposal for a regulation

Recital 53

Text proposed by the CommissionAmendment
(53) Considering that the selected scenario and its underlying assumptions play a major role in the Union-wide network development planning process, the Commission should play a central role in defining it. That should help streamline the inputs and ensure better compliance with the Union’s policy targets. It is also appropriate for the Union-wide ten-year network development plans to be based on one central scenario, with possible sensitivity analyses to the scenario in case of change of external conditions, because the main purpose of the scenario is to provide a common basis for the assessment of the infrastructure gaps and benefits of candidate projects of common interest and project of mutual interest. The increased importance of the central scenario requires close involvement of the ENTSO for Electricity, the ENNOH, and the ENTSO for Gas, the Member States and the Agency to ensure that relevant data and information is provided, and that the scenario is aligned with national developments. The Stakeholder Reference Group should continue providing coordinated stakeholder input and advice on scenario development.(53) Considering that the selected scenario and its underlying assumptions play a major role in the Union-wide network development planning process, the Commission should play a central role in defining it. That should help streamline the inputs and ensure better compliance with the Union’s policy targets. It is also appropriate for the Union-wide ten-year network development plans to be based on one central scenario, with sensitivity analyses to the scenario structured by different pathways to the Union’s policy targets that reflect a variety of external conditions and stress factors, because the main purpose of the scenario is to provide a common basis for the assessment of the infrastructure gaps for long-term planning of the Union’s energy networks, as well as for assessing the benefits of candidate projects of common interest and project of mutual interest. Additional sensitivity analyses may be carried out in case of change to external conditions or additional uncertainties that could significantly impact the validity or outcomes of the original scenario, ensuring a comprehensive and resilient planning process that accounts for a range of potential future developments. The ENTSO for Electricity, the ENTSO for Gas and the ENNOH may develop additional models of the central scenario based on the assumptions and data provided by the Commission, to identify infrastructure needs or system parameters potentially not captured in the Commission’s modelling and to serve as an early warning mechanism for the robustness of the infrastructure needs and planning. The increased importance of the central scenario requires close involvement of the ENTSO for Electricity, the ENNOH, and the ENTSO for Gas, the Member States and the Agency to ensure that relevant data and information is provided, and that the scenario is aligned with national developments. The Stakeholder Reference Group should continue providing coordinated stakeholder input and advice on scenario development.

Amendment 25

Proposal for a regulation

Recital 53 a (new)

Text proposed by the CommissionAmendment
(53a) In order to ensure the robustness of infrastructure assessments and to facilitate regulatory reality checks consistent with national circumstances, the systematic development of sensitivity analyses and additional scenarios based on national data and conditions should be encouraged. The use of such sensitivities and alternative scenarios enables project promoters and decision-makers to assess infrastructure needs and the value of projects under varying conditions.

Amendment 26

Proposal for a regulation

Recital 55 a (new)

Text proposed by the CommissionAmendment
(55a) Grid infrastructure planning should reflect the full range of system-level solutions available to address identified infrastructure needs, including both network-side and generation-side contributions to system stability and congestion relief. Stable, predictable, and dispatchable clean power generation, can reduce peak flows on interconnectors and transmission corridors. Transmission system operators and the ENTSO for Electricity should therefore assess, as part of the infrastructure needs identification process, the flexibility needs of the system. That approach supports efficient use of public and private investment and avoids unnecessary expansion of grid infrastructure where system-level alternatives provide equivalent or superior outcomes.

Amendment 27

Proposal for a regulation

Recital 57

Text proposed by the CommissionAmendment
(57) The Union-wide ten-year network development plan should provide a comprehensive overview of planned infrastructure projects having cross-border impacts in the Union. Non-wire and flexibility solutions should form an intrinsic part of the plan so that it provides a full picture of future investments necessary for optimal operation of the electricity and hydrogen networks. A specific consideration should also be given to projects improving security and resilience of the network.(57) The Union-wide ten-year network development plan should provide a comprehensive overview of planned infrastructure projects having cross-border impacts in the Union. Non-wire and flexibility solutions should form an intrinsic part of the plan so that it provides a full picture of future investments necessary for optimal operation of the electricity and hydrogen and other carriers pursuant to this Regulation. A specific consideration should also be given to projects improving security and resilience of the network, including the interaction of different supply and flexibility resources in ensuring adequacy and stability of the energy system.

Amendment 28

Proposal for a regulation

Recital 59

Text proposed by the CommissionAmendment
(59) Energy infrastructure planning should properly reflect sector coupling and cross-linkages between energy carriers. The scenarios’ development, the process of identifying infrastructure needs and the methodologies for cost-benefit analysis should be based on an integrated, long-term and optimised ‘one energy system’ approach and modelling which uses common assumptions and consistent methodologies. Greater coordination of infrastructure planning across sectors should help prioritise and deploy new infrastructure solutions in a more optimal manner.(59) Energy infrastructure planning should properly reflect sector coupling and cross-linkages between energy carriers. The scenarios’ development, the process of identifying infrastructure needs and the methodologies for cost-benefit analysis should be based on an integrated, long-term and optimised ‘one energy system’ approach and modelling which uses common assumptions and consistent methodologies. Greater coordination of infrastructure planning across sectors should help prioritise and deploy new infrastructure solutions in a more optimal manner, including the interaction of different supply and flexibility resources in ensuring system adequacy and stability.

Amendment 29

Proposal for a regulation

Recital 60 a (new)

Text proposed by the CommissionAmendment
(60a) Grid-supportive and grid-optimization assets, including non-wire solutions, flexibility and energy storage, among others, should be considered in identifying infrastructure needs and optimising the use of existing electricity networks by Member States and National Regulatory Authorities (NRAs). Such solutions should be considered at all voltage levels, including transmission networks, and their value assessed and reflected in grid planning and remuneration methodologies of said investments. Such assets can contribute to decarbonization, reaching the Union's climate neutrality objectives, congestion relief, efficient use of network capacity, system security and cross-border integration, in line with the objectives of this Regulation and without prejudice to the application of Directive (EU) 2019/944.

Amendment 30

Proposal for a regulation

Recital 63 a (new)

Text proposed by the CommissionAmendment
(63a) The completion of an integrated and efficient internal electricity market requires significant investment in cross-border infrastructure and measures addressing structural network constraints. Congestion income generated within Member States as a result of price differences between bidding zones should be used in accordance with the objectives set out in Article 19(2) of Regulation (EU) 2019/943. Where those objectives have been adequately fulfilled, congestion revenues may be used, in accordance with Union electricity market design rules, for investments that contribute to reducing structural congestion and improving system efficiency. This should contribute to a fair allocation of infrastructure costs and help avoid the disproportionate externalisation of costs arising from persistent structural congestion, while respecting Member States' discretion over the use of congestion revenues in accordance with Union law.

Amendment 31

Proposal for a regulation

Recital 64

Text proposed by the CommissionAmendment
(64) In an increasingly interconnected internal energy market, clear and transparent rules for cross-border cost-allocation are necessary in order to accelerate investment in cross-border infrastructure and in projects with a cross-border impact. As cross-border energy infrastructure becomes more integrated, more projects deliver benefits beyond the territories where they are built. That makes fair and transparent cost-sharing essential to avoid disproportionate burdens on local consumers. The discussion on the appropriate allocation of costs should be based on the analysis of the costs and benefits of an infrastructure project carried out on the basis of a harmonised methodology for energy-system-wide analysis, using the central scenario and any sensitivity analysis established for the purpose of the Union-wide ten-year network development plans prepared pursuant to Regulations (EU) 2019/943 and (EU) 2024/1789, allowing for a robust analysis of the contribution of the project of common interest or mutual interest to the Union energy policies of decarbonisation, market integration, competition, sustainability and security of supply. Member States and national regulatory authorities in which at least 10 % of the benefits of a project are located should participate in discussions on cost allocation to ensure that the project can be implemented and its benefits delivered. Furthermore, cross-border cost allocation agreements should consider ex-post arrangements to ensure fair and proportionate participation of non-host countries, provided that such adjustments are clearly defined and structured in a way that safeguards investment certainty.(64) In an increasingly interconnected internal energy market, clear and transparent rules for cross-border cost-allocation are necessary in order to accelerate investment in cross-border infrastructure and in projects with a cross-border impact. As cross-border energy infrastructure becomes more integrated, more projects deliver benefits beyond the territories where they are built. That makes fair and transparent cost-sharing essential to avoid disproportionate burdens on local consumers. The discussion on the appropriate allocation of costs should be based on the analysis of the costs and benefits of an infrastructure project carried out on the basis of a harmonised methodology for energy-system-wide analysis, using the central scenario and any sensitivity analysis established for the purpose of the Union-wide ten-year network development plans prepared pursuant to Regulations (EU) 2019/943 and (EU) 2024/1789, allowing for a robust analysis of the contribution of the project of common interest or mutual interest to the Union energy policies of decarbonisation, market integration, competition, circular economy, sustainability and security of supply. Member States and national regulatory authorities involved in infrastructure developments and in which at least 10 % of the benefits of a project are located should participate in discussions on cost allocation to ensure that the project can be implemented and its benefits delivered. Furthermore, cross-border cost allocation agreements should consider ex-post arrangements to ensure fair and proportionate participation of non-host countries, provided that such adjustments are clearly defined and structured in a way that safeguards investment certainty.

Amendment 32

Proposal for a regulation

Recital 70 a (new)

Text proposed by the CommissionAmendment
(70a) The development of a European hydrogen network is necessary to support the decarbonisation of hard-to-abate sectors, strengthen energy system integration and contribute to the Union's climate and energy objectives. To reduce investment risks arising from the emerging nature of the hydrogen market, network development requires support from Union-level mechanisms established to facilitate cross-border hydrogen infrastructure and market development, including Regulation (EU) 2024/1789 and other relevant Union financial instruments that can further contribute to improve market visibility, support the efficient rollout of hydrogen infrastructure and prevent prohibitive network charges in the early phase.

Amendment 33

Proposal for a regulation

Recital 75

Text proposed by the CommissionAmendment
(75) The Union should facilitate energy projects in disadvantaged, less connected, peripheral, outermost or isolated regions to enable access to the trans-European energy networks in order to accelerate the decarbonisation process and reduce dependency on fossil fuels.(75) The Union should facilitate energy projects, in line with the technological neutrality principle, in disadvantaged, less connected, peripheral, outermost or isolated regions to enable access to the trans-European energy networks in order to accelerate the decarbonisation process and reduce dependency on fossil fuels.

Amendment 34

Proposal for a regulation

Recital 79 a (new)

Text proposed by the CommissionAmendment
(79a) Acknowledges that the Union energy system is dynamic and that technological advancements, the growing capacity for home-grown energy production and new energy carriers are going to be part of the Union’s future decarbonized energy system. That system also operates in a geopolitical environment that can change rapidly and unpredictably, with direct consequences for the security and affordability of the Union's energy supply, scaling up domestically produced renewable gases, in particular biomethane is therefore a matter of both decarbonisation and strategic resilience. In this regard the Commission should, ahead of its next review, carry out an assessment of new energy vectors that are market-mature and whose deployment may require the development of trans-European infrastructure and consider their inclusion in future reviews of this regulation, provided that these contribute to the Union’s energy and climate goals.

Amendment 35

Proposal for a regulation

Article 1 – paragraph 1

Text proposed by the CommissionAmendment
1. This Regulation lays down guidelines for the timely development and interoperability of the priority corridors and areas of trans-European energy infrastructure (energy infrastructure priority corridors and areas) set out in Annex I, that contribute to ensuring climate change mitigation, in particular achieving the Union’s targets for energy and climate and its climate neutrality objective by 2050 at the latest, and to ensuring interconnections, energy security, market and system integration and competition that benefits all Member States, as well as affordability of energy prices.1. This Regulation lays down guidelines for the timely development and interoperability of the priority corridors and areas of trans-European energy infrastructure (energy infrastructure priority corridors and areas) set out in Annex I, that contribute to ensuring:
a) climate change mitigation, in particular achieving the Union’s targets for energy and climate and its climate neutrality objective by 2050 at the latest;
b) the achievement of the Union’s goals of enhancing adaptive capacity, strengthening resilience and reducing vulnerability to climate change;
c) the achievement of the Union’s environmental and biodiversity objectives;
d) interconnections, energy security, market and system integration and competition that benefits all Member States, as well as affordability of energy prices.

Amendment 36

Proposal for a regulation

Article 2 – paragraph 1 – point 19 a (new)

Text proposed by the CommissionAmendment
(19a) ‘energy efficiency first’ means energy efficiency first as defined in Article 2, point 18, of Regulation (EU) 2018/1999 of the European Parliament and of the Council 1a;
1a Regulation (EU) 2018/1999 of the European Parliament and of the Council of 11 December 2018 on the Governance of the Energy Union and Climate Action, amending Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European Parliament and of the Council, Directives 94/22/EC, 98/70/EC, 2009/31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the European Parliament and of the Council, Council Directives 2009/119/EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of the European Parliament and of the Council (OJ L 328, 21.12.2018, p. 1).

Amendment 37

Proposal for a regulation

Article 3 – paragraph 6

Text proposed by the CommissionAmendment
6. Projects of common interest and projects of mutual interest that fall under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (f) and (h) of Annex II, as relevant, shall become an integral part of the relevant regional investment plans adopted in accordance with Article 34 of Regulation (EU) 2019/943 and of the relevant national ten-year network development plans adopted in accordance with Article 51 of Directive (EU) 2019/944. Projects of common interest and projects of mutual interest that fall under the energy infrastructure categories set out in point (2) of Annex II ,as relevant, shall become an integral part of the ten-year network development plan for hydrogen under Article 55 of Directive (EU) 2024/1788 and other national infrastructure plans, as appropriate. Those projects of common interest and projects of mutual interest shall be conferred the highest possible priority within each of those national plans. This paragraph shall not apply to competing projects or projects that have not reached a sufficient degree of maturity to provide a project-specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III.6. Projects of common interest and projects of mutual interest that fall under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (f) and (h) of Annex II, as relevant, shall become an integral part of the relevant regional investment plans adopted in accordance with Article 34 of Regulation (EU) 2019/943 and of the relevant national ten-year network development plans adopted in accordance with Article 51 of Directive (EU) 2019/944, as well as of the integrated national energy and climate plans (NECPs) adopted in accordance with Article 3 of Regulation (EU) 2018/1999. Projects of common interest and projects of mutual interest that fall under the energy infrastructure categories set out in point (2) of Annex II, as relevant, shall become an integral part of the ten-year network development plan for hydrogen under Article 55 of Directive (EU) 2024/1788 and other national infrastructure plans, as appropriate. Those projects of common interest and projects of mutual interest shall be conferred the highest possible priority within each of those national plans. This paragraph shall not apply to competing projects or projects that have not reached a sufficient degree of maturity to provide a project-specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III.

Amendment 38

Proposal for a regulation

Article 4 – paragraph 3 – point a – introductory part

Text proposed by the CommissionAmendment
(a) for electricity transmission, distribution and storage projects falling under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (f) and (h) of Annex II, the project contributes significantly to sustainability through the integration of renewable energy into the grid, the transmission or distribution of renewable generation to major consumption centres and storage sites, and to reducing energy curtailment, where applicable, and contributes to at least one of the following specific criteria:(a) for electricity transmission, distribution and storage projects falling under the energy infrastructure categories set out in points (1)(a), (b), (c), (d), (f) and (h) of Annex II, the project contributes significantly to sustainability through the integration of renewable energy into the grid, including the development of super grids as enablers of efficient, long-distance, large-scale power flows, the transmission or distribution of renewable and low-carbon generation to major consumption centres and storage sites, improving regional energy security through the elimination of structural bottlenecks, and to reducing energy curtailment, where applicable, and contributes to at least one of the following specific criteria:

Amendment 39

Proposal for a regulation

Article 4 – paragraph 3 – point a – point ii

Text proposed by the CommissionAmendment
(ii) security of supply, including through interoperability, system flexibility, cybersecurity, appropriate connections and secure and reliable system operation;(ii) security of supply, resilience of the energy systems, including through interoperability, system flexibility, cybersecurity, appropriate connections and secure and reliable system operation;

Amendment 40

Proposal for a regulation

Article 4 – paragraph 3 – point b – point iii

Text proposed by the CommissionAmendment
(iii) network security, flexibility and quality of supply, including through higher uptake of innovation in balancing, flexibility markets, cybersecurity, monitoring, system control and error correction;(iii) network security, resilience of the energy systems, flexibility and quality of supply, including through the use of digital technologies and data-driven methods and higher uptake of innovation in forecasting climate-related risks, balancing, flexibility markets, cybersecurity, monitoring, system control, error correction, disruption prevention and effective response and recovery, ensuring that such digital and physical solutions are provided by trusted providers and originate from jurisdictions that adhere to high standards of transparency, reciprocity, and the protection of the Union’s essential security interests;

Amendment 41

Proposal for a regulation

Article 4 – paragraph 3 – point c – point ii

Text proposed by the CommissionAmendment
(ii) network security, including through measures facilitating a higher degree of physical security and cybersecurity, monitoring, and system control;(ii) network security, resilience of the energy systems, including through measures facilitating a higher degree of physical security and cybersecurity, monitoring, and system control;

Amendment 42

Proposal for a regulation

Article 4 – paragraph 3 – point d – point ii

Text proposed by the CommissionAmendment
(ii) increasing the resilience and security of transport and storage of carbon dioxide;(ii) increasing the resilience, efficiency and security of transport and storage of carbon dioxide;

Amendment 43

Proposal for a regulation

Article 4 – paragraph 3 – point e – introductory part

Text proposed by the CommissionAmendment
(e) for hydrogen projects falling under the energy infrastructure categories set out in point (2) of Annex II, the project contributes significantly to sustainability, including by reducing greenhouse gas emissions, by enhancing the deployment of renewable or low carbon hydrogen, with an emphasis on hydrogen from renewable sources in particular in end-use applications, such as hard-to-abate sectors, in which more energy efficient solutions are not feasible, and supporting variable renewable power generation by offering flexibility, storage solutions, or both, and the project contributes significantly to at least one of the following specific criteria:(e) for hydrogen projects falling under the energy infrastructure categories set out in point (2) of Annex II, the project contributes significantly to sustainability, including by reducing greenhouse gas emissions, by enhancing the deployment of domestically produced renewable or low carbon hydrogen, with an emphasis on hydrogen from renewable sources in particular in end-use applications, such as hard-to-abate sectors, in which more energy efficient solutions are not feasible, ensuring security of supply, and supporting variable renewable power generation by offering flexibility, storage solutions, or both, and the project contributes significantly to at least one of the following specific criteria:

Amendment 44

Proposal for a regulation

Article 4 – paragraph 4 a (new)

Text proposed by the CommissionAmendment
4a. When assessing projects under this Article, the Groups shall take into account the specific contribution of a project to the security of supply in regions particularly affected by energy isolation or structural network constraints, ensuring a balanced development of infrastructure across the Union.

Amendment 45

Proposal for a regulation

Article 4 – paragraph 5 – subparagraph 2 – point a

Text proposed by the CommissionAmendment
(a) the urgency and the contribution of each proposed project in order to meet the Union’s targets for energy and climate and its 2050 climate neutrality objective, market integration, competition, sustainability, and security of supply;(a) the urgency and the contribution of each proposed project in order to meet the Union’s targets for energy and climate and its 2050 climate neutrality objective, market integration, competition, sustainability, affordability and security of supply, considering the application of the principle of ‘energy efficiency first’;

Amendment 46

Proposal for a regulation

Article 4 – paragraph 5 a (new)

Text proposed by the CommissionAmendment
5a. In prioritising projects of common and mutual interest, the assessment shall take into account each project's contribution to the Union's energy and climate targets, to sustainability, to market integration, competition and security of supply, as well as its cost-effectiveness and potential cross-border and system-wide impacts. The assessment shall be carried out in accordance with the principle of technological neutrality.

Amendment 47

Proposal for a regulation

Article 7 – paragraph 8 – subparagraph 1

Text proposed by the CommissionAmendment
Where Member States apply the exemptions under paragraph 7, they shall ensure that rules on effective mitigation measures to be adopted for the projects on the Union list falling under the infrastructure categories referred to in Annex II point (1) are identified based on the National Development Plan, in order to avoid the adverse environmental impact that may arise or, where that is not possible, to significantly mitigate it. Member States shall ensure that the appropriate mitigation measures are applied in a timely manner to ensure compliance with the obligations laid down in Article 6(2) of Directive 92/43/EEC and Article 4(1), point (a)(i), of Directive 2000/60/EC of the European Parliament and of the Council and to avoid deterioration and achieve good ecological status or good ecological potential in accordance with Article 4(1), point (a), of Directive 2000/60/EC.Where Member States apply the exemptions under paragraph 7, they shall ensure that rules on effective mitigation measures to be adopted for the projects on the Union list falling under the infrastructure categories referred to in Annex II point (1) are identified based on the National Development Plan, in order to avoid the adverse environmental impact that may arise or, where that is not possible, to significantly mitigate it. Member States shall ensure that the appropriate mitigation measures are applied in a timely manner to ensure compliance with the obligations laid down in Article 6(2) of Directive 92/43/EEC and Article 4(1), points (a)(i) and (b)(i), of Directive 2000/60/EC of the European Parliament and of the Council and to avoid deterioration and achieve good ecological status or good ecological potential in accordance with Article 4(1), point (a), of Directive 2000/60/EC,

Amendment 48

Proposal for a regulation

Article 7 – paragraph 9

Text proposed by the CommissionAmendment
9. Member States shall ensure public participation regarding the National Development Plan in accordance with Articles 6 and 7 of Directive 2001/42/EC, including identifying the public affected or likely to be affected as well as the Member States that may be affected by the implementation of that Plan and the projects on the Union list falling under the infrastructure categories referred to in point (1) of Annex II to this Regulation included in that Plan.9. Member States shall ensure effective public participation regarding the National Development Plan in accordance with Articles 6 and 7 of Directive 2001/42/EC, including identifying the public affected or likely to be affected as well as the Member States that may be affected by the implementation of that Plan and the projects on the Union list falling under the infrastructure categories referred to in point (1) of Annex II to this Regulation included in that Plan.

Amendment 49

Proposal for a regulation

Article 7 – paragraph 10 – subparagraph 2 a (new)

Text proposed by the CommissionAmendment
The second subparagraph and the exemption provided for in point (a) of the seventh subparagraph are without prejudice to a Member State’s obligations under the Convention on environmental impact assessment in a transboundary context.

Amendment 50

Proposal for a regulation

Article 7 – paragraph 13

Text proposed by the CommissionAmendment
13. When assessing whether satisfactory alternative solutions to projects on the Union list falling under the infrastructure categories referred to in points (2), (3) and (4) of Annex II to this Regulation, exist for the purposes of Articles 6(4) and Article 16(1) of Directive 92/43/EEC, Article 4(7), point (d), of Directive 2000/60/EC and Article 9(1) of Directive 2009/147/EC, the condition of having no satisfactory alternatives shall be fulfilled if there are no satisfactory alternative solutions capable of achieving the same objective of the project in question, in terms of the development of the same capacity through the same technology within the same or similar timeframe and without resulting in significantly higher costs.13. When assessing whether satisfactory alternative solutions to projects on the Union list falling under the infrastructure categories referred to in points (2), (3) and (4) of Annex II to this Regulation, exist for the purposes of Articles 6(4) and Article 16(1) of Directive 92/43/EEC, Article 4(7), point (d), of Directive 2000/60/EC and Article 9(1) of Directive 2009/147/EC, the condition of having no satisfactory alternatives shall be fulfilled if, based on the best available scientific and technical knowledge, there are no satisfactory alternative solutions capable of achieving the same objective of the project in question, in a manner that is the least damaging for the habitats and species concerned and the integrity of the Natura 2000 site or sites concerned, in terms of the development of the same capacity through the same technology within the same or similar timeframe and without resulting in significantly higher costs.

Amendment 51

Proposal for a regulation

Article 8 – paragraph 3 – subparagraph 2 – point b – point iii

Text proposed by the CommissionAmendment
(iii) the national competent authority shall, after consulting the other authorities concerned, establish on a case-by-case basis a reasonable time limit within which the individual decisions shall be issued with the aim to minimise the duration of the process without prejudice to time limits set out in Article 10(1) and (2);(iii) the national competent authority shall, after consulting the other authorities concerned, establish on a case-by-case basis a reasonable time limit within which the individual decisions shall be issued with the aim to minimise the duration of the process without prejudice to time limits set out in Article 10(1) and (2) and without compromising the quality of the decision-making process.

Amendment 52

Proposal for a regulation

Article 9 – paragraph 1

Text proposed by the CommissionAmendment
1. By 24 October 2027, the Member State or national competent authority shall, where necessary, in collaboration with other authorities concerned, publish an updated manual of procedures for the permit-granting process applicable to projects on the Union list to include at least the information specified in point (1) of Annex VI. The manual shall not be legally binding, but it shall refer to or quote relevant legal provisions. The national competent authorities shall, where relevant, cooperate and find synergies with the authorities of neighbouring countries with a view to align timelines and facilitating the permit-granting process for projects, including for the development of the manual of procedures.1. By 24 October 2027, the Member State or national competent authority shall, where necessary, in collaboration with other authorities concerned, publish an updated manual of procedures for the permit-granting process applicable to projects on the Union list to include at least the information specified in point (1) of Annex VI. The manual shall not be legally binding, but it shall refer to or quote relevant legal provisions. The national competent authorities shall, where relevant, cooperate and find synergies with the authorities of neighbouring countries with a view to align timelines, enhance administrative coordination and facilitate the permit-granting process for projects, including for the development of the manual of procedures.

Amendment 53

Proposal for a regulation

Article 9 – paragraph 5

Text proposed by the CommissionAmendment
5. Where it is not already required under national law, the project promoter shall carry out at least one early-stage public consultation, before the submission of the final and complete permitting application to the national competent authority pursuant to Article 10(10). The public consultation may be carried out in combination with any public consultation after submission of the request for development consent pursuant to Article 6(2) of Directive 2011/92/EU.5. Where it is not already required under national law, the project promoter shall carry out at least one early-stage public consultation, before the submission of the final and complete permitting application to the national competent authority pursuant to Article 10(10). The public consultation may be carried out in combination with any public consultation after submission of the request for development consent pursuant to Article 6(2) of Directive 2011/92/EU. Any exemption from environmental assessment in respect of Directive 2011/92/EU under this Regulation is without prejudice to Member State obligations for public participation.

Amendment 54

Proposal for a regulation

Article 9 – paragraph 6

Text proposed by the CommissionAmendment
6. The public consultation required in the previous paragraph shall comply with the minimum requirements set out in point (5) of Annex VI and shall inform the stakeholders referred to in point (3)(a) of Annex VI about the project at an early stage and shall help to identify the most suitable location, trajectory or technology, including, where relevant, in view of adequate climate adaptation and security considerations for the project, all impacts relevant under Union and national law, and the relevant issues to be addressed in the application file.6. The public consultation required in the previous paragraph shall comply with the minimum requirements set out in point (5) of Annex VI and shall inform the stakeholders referred to in point (3)(a) of Annex VI about the project at an early stage and shall help to identify alternatives, where feasible, the most suitable location, trajectory or technology, including, where relevant, in view of adequate climate mitigation and adaptation and security considerations for the project, all impacts relevant under Union and national law, and the relevant issues to be addressed in the application file.

Amendment 55

Proposal for a regulation

Article 10 – paragraph 2 – subparagraph 2

Text proposed by the CommissionAmendment
However, where the national competent authority considers that one or both of the procedures will not be completed within the time limits set out in paragraph 1, it may extend one or both of those time limits before their expiry and on a case-by-case basis. The national competent authority shall not extend the combined duration of the two procedures for more than six months other than in exceptional circumstances.However, where the national competent authority considers that one or both of the procedures will not be completed within the time limits set out in paragraph 1, it may extend one or both of those time limits before their expiry and on a case-by-case basis. The national competent authority shall not extend the combined duration of the two procedures for more than six months other than in exceptional circumstances, while not compromising the quality of the decision-making process.

Amendment 56

Proposal for a regulation

Article 10 – paragraph 4 – subparagraph 2

Text proposed by the CommissionAmendment
This paragraph does not produce effects for environmental decisions, and where the principle of administrative tacit approval does not exist in the legal system of the Member State concerned.This paragraph does not produce effects for environmental decisions, including, where appropriate, decisions on, or screening for, environmental assessments, and where the principle of administrative tacit approval does not exist in the legal system of the Member State concerned.

Amendment 57

Proposal for a regulation

Article 10 – paragraph 5 – subparagraph 4

Text proposed by the CommissionAmendment
Member States shall ensure that dedicated digital platforms are established to manage permitting applications, permitting processes, ongoing permitting decisions, and decisions issued in an easily accessible format.Member States shall aim to streamline and speed up administrative permit-granting procedures by establishing dedicated digital portals to manage permitting applications, permitting processes, ongoing permitting decisions, and decisions issued in a clear and easily accessible format. Those digital portals shall be designed for maximum efficiency and ensure interoperability with existing portals used by System Operators.

Amendment 58

Proposal for a regulation

Article 10 – paragraph 7

Text proposed by the CommissionAmendment
7. The national competent authorities shall take into consideration, in the screening for establishing the requirements for the permit-granting process, any studies conducted and permits or authorisations issued up to five years before the project entered the permit-granting process in accordance with this Article, including assessments conducted for the deployment of other projects that are relevant and can be reused, and shall not require unnecessary or duplicate studies, assessments, permits or authorisations.7. The national competent authorities shall take into consideration, in the screening for establishing the requirements for the permit-granting process, any studies conducted and permits or authorisations issued up to five years before the project entered the permit-granting process in accordance with this Article, including assessments conducted for the deployment of other projects that are relevant and can be reused, and shall not require unnecessary or duplicate studies, assessments, permits or authorisations, unless the competent authority decides that there have been material developments which render such studies and assessments insufficient and out of date for the purposes of assessments.
Data older than five years may be taken into consideration by national competent authorities as supportive evidence insofar as it remains scientifically valid and relevant to the respective project configuration and shall, when necessary, be complemented by targeted updates.
If permit-granting is significantly delayed, the Commission, the Member States, and the project promoter shall engage in a formal dialogue to address administrative bottlenecks within a reasonable timeframe before any penalties or status downgrades are applied.

Amendment 59

Proposal for a regulation

Article 10 – paragraph 9 – subparagraph 1 – point a – subparagraph 1

Text proposed by the CommissionAmendment
as soon as possible and no later than three months following the notification by the project promoter referred to in paragraph 5, the national competent authority shall determine, and notify the project promoter of the authorisations, permits and assessments required to complete permit-granting process.as soon as possible and no later than three months following the notification by the project promoter referred to in paragraph 5, the national competent authority shall determine, and notify the project promoter of the authorisations, permits and assessments required to complete permit-granting process, and shall make this information publicly available subject to national or EU confidentiality rules.

Amendment 60

Proposal for a regulation

Article 11 – paragraph 1

Text proposed by the CommissionAmendment
1. By [two years after entry into force] and at least every four years thereafter, the Commission shall develop a central scenario for the electricity, hydrogen and gas sectors to be used for the Union-wide ten-year network development plans referred to in: Article 48 of Regulation (EU) 2019/943 and Article 59 of Regulation (EU) 2024/1789, the infrastructure needs identification process referred to in Article 12 of this Regulation, the energy system wide cost-benefit analysis referred to in Article 14 of this Regulation, and the cross-border cost allocation referred to in Article 17 of this Regulation.1. By [two years after entry into force] and at least every four years thereafter, in cooperation with Member States and considering the NECPs, the Commission shall develop a central scenario for the electricity, hydrogen and gas sectors to be used for the Union-wide ten-year network development plans referred to in: Article 48 of Regulation (EU) 2019/943 and Article 59 of Regulation (EU) 2024/1789, the infrastructure needs identification process referred to in Article 12 of this Regulation, the energy system wide cost-benefit analysis referred to in Article 14 of this Regulation, and the cross-border cost allocation referred to in Article 17 of this Regulation. The final results of the central scenario, including the underlying assumptions, shall be adopted by the Commission after consulting the Member States within the relevant Regional Groups.

Amendment 61

Proposal for a regulation

Article 11 – paragraph 2 – point a

Text proposed by the CommissionAmendment
(a) be consistent with the Union’s targets for energy and climate and include a long-term perspective until at least 2050 in accordance with the Union’s climate neutrality objective;(a) be consistent with the Union’s targets for energy and climate, observe the latest available NECPs, the latest policies and technology cost development, and include a long-term perspective until at least 2050 in accordance with the Union’s climate neutrality objective and, where relevant, the technological neutrality principle;

Amendment 62

Proposal for a regulation

Article 11 – paragraph 2 – point b

Text proposed by the CommissionAmendment
(b) take a cross-sectoral approach ensuring consistency between the electricity, hydrogen and gas sectors, optimizing system efficiency;(b) take a cross-sectoral approach ensuring consistency between the electricity, hydrogen and gas sectors, optimizing system efficiency considering the integrated NECPs adopted in accordance with Article 3 of Regulation (EU) 2018/1999;

Amendment 63

Proposal for a regulation

Article 11 – paragraph 4 – subparagraph 1 a (new)

Text proposed by the CommissionAmendment
The ENTSO for Electricity, the ENTSO for Gas and the ENNOH may develop additional models of the central scenario on the basis of the framework of assumptions and the final input data provided by the Commission, including those relating to environmental factors, with a view to identifying any infrastructure needs or system parameters not reflected in the Commission's modelling.

Amendment 64

Proposal for a regulation

Article 12 – paragraph 2 – point d a (new)

Text proposed by the CommissionAmendment
(da) ensure forward-looking climate and extreme weather risk scenarios, including the potential of non-wire and digital solutions to prevent system failures, and reflect decarbonisation needs.

Amendment 65

Proposal for a regulation

Article 12 – paragraph 2 – point d b (new)

Text proposed by the CommissionAmendment
(db) in the case of the infrastructure needs identification report, in line with Annex VII, assess the impact of repurposing gas infrastructure to renewable hydrogen and retrofitting to other renewable gases especially concerning security of supply and the whole energy system stability.

Amendment 66

Proposal for a regulation

Article 12 – paragraph 4

Text proposed by the CommissionAmendment
4. Within six months of the publication of a central scenario pursuant to Article 11, except where the publication is limited to adding a sensitivity analysis, the ENTSO for Electricity and the ENNOH shall submit their respective draft infrastructure needs identification report, including the assessment of how projects submitted for inclusion in the Union wide ten-year network development plan match the needs identified, to the TEN-E Group. In case the publication is limited to adding a sensitivity analysis, the Commission may request the ENTSO for Electricity and the ENNOH to develop a new infrastructure needs identification report in accordance with the procedure laid down in this Article.4. Within six months of the publication of a central scenario pursuant to Article 11, except where the publication is limited to adding a sensitivity analysis, the ENTSO for Electricity and the ENNOH shall submit their respective draft infrastructure needs identification report, including the comparison of how projects submitted for inclusion in the Union wide ten-year network development plan match the needs identified, to the TEN-E Group. In case the publication is limited to adding a sensitivity analysis, the Commission may request the ENTSO for Electricity and the ENNOH to develop a new infrastructure needs identification report in accordance with the procedure laid down in this Article. Where relevant, projects repurposing existing gas infrastructure for the transport of renewable hydrogen, or retrofitting it for the transport of other renewable gases shall be taken into account in the assessment of identified needs, provided that such repurposing or retrofitting demonstrably contributes to the decarbonisation of the energy system and does not create long-term dependency on fossil-based energy sources, and without prejudice to the security of energy supply.

Amendment 67

Proposal for a regulation

Article 13 – paragraph 1

Text proposed by the CommissionAmendment
1. When the infrastructure needs identification report for electricity concludes that projects submitted for inclusion in the Union wide ten-year network development plan do not fully meet the infrastructure needs identified pursuant to Article 12, the Commission may launch a process to identify possible solutions to address the unmatched needs.1. When the infrastructure needs identification and system assessment reports pursuant to Article 12 of this Regulation conclude that projects submitted for inclusion in the Union wide ten-year network development plan do not fully match the infrastructure needs identified, the Commission may launch a process to identify possible solutions to address the unmatched needs. In doing so, the Commission shall take into account the regional investment plans pursuant to Article 34 of Regulation (EU) 2019/943 and network development plans pursuant to Article 40a of Directive (EU) 2019/944, as well as, where relevant, socio-economic, security, environmental and geopolitical considerations.

Amendment 68

Proposal for a regulation

Article 13 – paragraph 1 – subparagraph 1 a (new)

Text proposed by the CommissionAmendment
To provide an early assessment of emerging infrastructure gaps and enable timely corrective action, the TEN-E Group, based on the modelling provided by the ENTSOs and in close cooperation with the Commission, may identify and periodically review regional cross-border infrastructure needs and emerging bottlenecks as a complement to the infrastructure needs identification report referred to in Article 12.

Amendment 69

Proposal for a regulation

Article 13 – paragraph 2

Text proposed by the CommissionAmendment
2. The Commission, in cooperation with the ENTSO for Electricity, the Member States and the Agency, shall invite system operators in the relevant Groups to propose, within six months of the invitation, projects capable of addressing the unmatched needs. The Commission shall submit the proposed projects to the relevant Groups established in accordance with Article 3 for discussion. The Commission may involve other relevant stakeholders and other regional cooperation fora. Project promoters capable of addressing the unmatched needs shall submit eligible projects as soon as possible for inclusion in the subsequent national development plans, the Union-wide ten-year network development plan and the Union list.2. The Commission, in cooperation with the ENTSO for Electricity, the Member States and the Agency, shall invite system operators in the relevant Groups to propose, within twelve months of the invitation, cross-border projects capable of addressing the unmatched needs. The Commission shall submit the proposed projects to the relevant Groups established in accordance with Article 3 for discussion. The Commission may involve other relevant stakeholders and other regional cooperation fora. Project promoters capable of addressing the unmatched needs shall submit eligible projects as soon as possible for inclusion in the subsequent national development plans, the Union-wide ten-year network development plan and the Union list. The calls for proposals shall be launched by the Commission following recommendations from the Regional Groups and after consulting with the TEN-E Group.

Amendment 70

Proposal for a regulation

Article 13 – paragraph 3

Text proposed by the CommissionAmendment
3. Where the process under paragraph 2 does not identify projects capable of addressing the unmatched needs, the Commission may launch a call for proposals open to any third party capable of becoming a project promoter to propose projects capable of addressing the unmatched needs. Project promoters capable of addressing the unmatched needs shall submit eligible projects as soon as possible for inclusion in the subsequent national development plans, the Union-wide ten-year network development plan and the Union list.3. Where the process under paragraph 2 does not identify projects capable of addressing the unmatched needs, following the recommendations from the Regional Groups and after consulting with the TEN-E Group, the Commission, may launch calls for proposals open to any third party capable of becoming a project promoter to propose projects capable of addressing the unmatched needs. Project promoters capable of addressing the unmatched needs, after consulting the relevant system operators, national regulatory authorities and concerned Member States, shall submit eligible projects as soon as possible for inclusion in the subsequent national development plans, the Union-wide ten-year network development plan and the Union list. The projects shall follow the established processes and meet the requirements for inclusion in the relevant network development plans, in the Union-wide ten-year network development plan and in the Union list.

Amendment 71

Proposal for a regulation

Article 19 – paragraph 1

Text proposed by the CommissionAmendment
1. TSOs shall set aside 25 % of the congestion rents not spent for guaranteeing the actual availability of the allocated capacity pursuant to Article 19(2), point (a), of Regulation (EU) 2019/943 and for compensation to offshore renewable electricity generation plant operators pursuant to Article 19(2), point (c), of Regulation (EU) 2019/943, for network investments into projects on the Union list relevant to reducing interconnector congestion pursuant Article 19(2), point (b), of Regulation (EU) 2019/943.1. TSOs shall set aside 25 % of the congestion rents not spent for guaranteeing the actual availability of the allocated capacity pursuant to Article 19(2), point (a) of Regulation (EU) 2019/943 and for compensation to offshore renewable electricity generation plant operators pursuant to Article 19(2), point (c) of Regulation (EU) 2019/943, for network investments into projects on the Union list relevant to reducing interconnector congestion pursuant to Article 19(2), point (b), of Regulation (EU) 2019/943.

Amendment 72

Proposal for a regulation

Article 24 – paragraph 1 – point d a (new)

Text proposed by the CommissionAmendment
(da) the presence of new market-ready energy vectors that contribute to the Union’s decarbonization goals and the potential for corresponding development of trans-European infrastructure;

Amendment 73

Proposal for a regulation

Article 30 – paragraph – point -1 (new)

Regulation (EU) 2024/1789

Article 32 – paragraph 2 – point c a (new)

Text proposed by the CommissionAmendment
(-1) in Article 32, paragraph 2, the following point is added:
'(ca) assess the impact of repurposing gas infrastructure for the transport of renewable hydrogen and/or retrofitting it for the transport other renewable gases, especially concerning security of supply and the sustainability of the whole energy system.’;

Amendment 74

Proposal for a regulation

Annex I – paragraph 1 – point 4 – point 12 – paragraph 1

Text proposed by the CommissionAmendment
Smart electricity grids deployment: adopting smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and demand response by consumers, energy storage, electric vehicles and other flexibility sources and, in addition, as regards islands and island systems, decreasing energy isolation, supporting innovative and other solutions involving at least two Member States with a significant positive impact on the Union’s targets for energy and climate and its 2050 climate neutrality objective, and contributing significantly to the sustainability of the island energy system and that of the Union.Smart electricity grids deployment: adopting smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and demand response by consumers, energy storage, electric vehicles and other flexibility sources and, in addition, as regards islands and island systems, decreasing energy isolation, supporting innovative and other solutions with a significant positive impact on the Union’s targets for energy and climate and its 2050 climate neutrality objective, and contributing significantly to the sustainability of the island energy system and that of the Union.

Amendment 75

Proposal for a regulation

Annex III – point 1 – point 1 – paragraph 1

Text proposed by the CommissionAmendment
With regard to energy infrastructure falling under the competence of national regulatory authorities, each Group shall be composed of representatives of the Member States, national regulatory authorities, TSOs as well as the Commission, the Agency, the EU DSO entity and either the ENTSO for Electricity or the ENNOH.With regard to energy infrastructure falling under the competence of national regulatory authorities, each Group shall be composed of representatives of the Member States, national regulatory authorities, TSOs as well as the Commission, the Agency, the EU DSO entity and either the ENTSO for Electricity, the ENTSO for Gas or the ENNOH.

Amendment 76

Proposal for a regulation

Annex III – point 2 – point 5 – paragraph 2

Text proposed by the CommissionAmendment
The ENTSO for Electricity, and the ENNOH shall consult the Commission and the Agency about their respective draft guidelines for inclusion of projects in the Union-wide ten-year network development plans and take due account of the Commission’s and the Agency’s recommendations before the publication of the final guidelines.The ENTSO for Electricity, the ENTSO for Gas and the ENNOH shall consult the Commission and the Agency about their respective draft guidelines for inclusion of projects in the Union-wide ten-year network development plans and take due account of the Commission’s and the Agency’s recommendations before the publication of the final guidelines.

Amendment 77

Proposal for a regulation

Annex III – point 2 – point 6

Text proposed by the CommissionAmendment
(6) The ENTSO for Electricity and the ENNOH shall provide information to the TEN-E Group as to how they applied the guidelines to evaluate inclusion in the Union-wide ten-year network development plans.(6) The ENTSO for Electricity, the ENTSO for Gas and the ENNOH shall provide information to the TEN-E Group as to how they applied the guidelines to evaluate inclusion in the Union-wide ten-year network development plans.

Amendment 78

Proposal for a regulation

Annex IV – point 1 – point i a (new)

Text proposed by the CommissionAmendment
(ia) for any project to qualify as a project of common interest, regardless of the technology it concerns, the project must have a proven level of technological maturity, sufficient real demand and offer for the energy vector concerned in the Union market and is a cost-effective project.

Amendment 79

Proposal for a regulation

Annex IV – point 3 – point a – introductory part

Text proposed by the CommissionAmendment
(a) transmission of renewable energy generation to major consumption centres and storage sites, measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, in particular by:(a) transmission of renewable and low carbon energy generation to major consumption centres and storage sites, measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, in particular by:

Amendment 80

Proposal for a regulation

Annex IV – point 3 – point a – point i

Text proposed by the CommissionAmendment
(i) for electricity transmission set out in point (1)(a), (b), (d), (f) and (h) of Annex II, estimating the amount of generation capacity from renewable energy sources (by technology, in MW), which is connected and transmitted due to the project, compared to the amount of planned total generation capacity from those types of renewable energy sources in the Member State concerned according to the National Energy and Climate Plans submitted by Member States in accordance with Regulation (EU) 2018/1999;(i) for electricity transmission set out in point (1)(a), (b), (d), (f) and (h) of Annex II, estimating the amount of generation capacity from renewable and low carbon energy sources (by technology, in MW), which is connected and transmitted due to the project, compared to the amount of planned total generation capacity from those types of renewable energy sources in the Member State concerned according to the National Energy and Climate Plans submitted by Member States in accordance with Regulation (EU) 2018/1999;
Annex: declaration of input 4 paragraphs

Pursuant to Article 8 of Annex I to the Rules of Procedure, the rapporteur for opinion declares that she included in her draft opinion input on matters pertaining to the subject of the file that she received, in the preparation of the draft opinion, from the following interest representatives falling within the scope of the Interinstitutional Agreement on a mandatory transparency register, or from the following representatives of public authorities of third countries, including their diplomatic missions and embassies:

1. Interest representatives falling within the scope of the Interinstitutional Agreement on a mandatory transparency register
PSE – Polish electricity transmission system operator
ENNOH - European Network of Network Operators for Hydrogen
GIE – Gas Infrastructure Europe
Nuclear Europe
IRU - International Road Union
2. Representatives of public authorities of third countries, including their diplomatic missions and embassies

The list above is drawn up under the exclusive responsibility of the rapporteur for opinion.

Where natural persons are identified in the list by their name, by their function or by both, the rapporteur for opinion declares that she has submitted to the natural persons concerned the European Parliament's Data Protection Notice No 484 (https://www.europarl.europa.eu/data-protect/index.do), which sets out the conditions applicable to the processing of their personal data and the rights linked to that processing.

Procedure pages

How the committees handled the text, and how their members voted on it.

Procedure – committee asked for opinion 1 paragraph
TitleGuidelines for trans-European energy infrastructure, amending Regulations (EU) 2019/942, (EU) 2019/943 and (EU) 2024/1789 and repealing Regulation (EU) 2022/869
ReferencesCOM(2025)1006 – C10-0342/2025 – 2025/0399(COD)
Committee(s) responsible Date announced in plenaryITRE 12.2.2026
Opinion by Date announced in plenaryENVI 12.2.2026
Rapporteur for opinion Date appointedElżbieta Katarzyna Łukacijewska 9.3.2026
Discussed in committee5.5.2026
Final vote by roll call by the committee asked for opinion 3 paragraphs

51 · For

ECR
Sergio Berlato, Pietro Fiocchi, Paolo Inselvini, Sander Smit, Aurelijus Veryga, Anna Zalewska
EPP
Bartosz Arłukowicz, Alexander Bernhuber, Daniel Buda, Hanna Gronkiewicz-Waltz, Michalis Hadjipantela, Niels Flemming Hansen, Esther Herranz García, Radan Kanev, Ewa Kopacz, Peter Liese, Elżbieta Katarzyna Łukacijewska, Dolors Montserrat, Letizia Moratti, Virgil-Daniel Popescu, Massimiliano Salini, Susana Solís Pérez, Ingeborg Ter Laak, Matej Tonin, Dimitris Tsiodras, Andrea Wechsler
Patriots
Marie-Luce Brasier-Clain, Valérie Deloge, Antonín Staněk
Renew
Jeannette Baljeu, Stine Bosse, Sigrid Friis, Gerben-Jan Gerbrandy, Martin Hojsík, Ana Vasconcelos, Michal Wiezik
S&D
Vytenis Povilas Andriukaitis, Sakis Arnaoutoglou, Delara Burkhardt, Mohammed Chahim, Christophe Clergeau, Annalisa Corrado, Heléne Fritzon, Alicia Homs Ginel, Javi López, César Luena, Pierfrancesco Maran, Alessandra Moretti, Marta Temido, Kristian Vigenin, Tiemo Wölken

9 · Against

ESN
Petr Bystron, Tomasz Froelich, Volker Schnurrbusch
EPP
Jessica Polfjärd
Patriots
Ton Diepeveen
The Left
Lynn Boylan, Emma Fourreau, Catarina Martins, Jonas Sjöstedt

9 · Abstained

EPP
Manuela Ripa
Patriots
Viktória Ferenc, Roman Haider, Silvia Sardone
Greens
Martin Häusling, Rasmus Nordqvist, Maria Ohisalo, Jutta Paulus, Kai Tegethoff
Procedure – committee responsible 1 paragraph
TitleGuidelines for trans-European energy infrastructure, amending Regulations (EU) 2019/942, (EU) 2019/943 and (EU) 2024/1789 and repealing Regulation (EU) 2022/869
ReferencesCOM(2025)1006 – C10-0342/2025 – 2025/0399(COD)
Date submitted to Parliament11.12.2025
Committee(s) responsible Date announced in plenaryITRE 12.2.2026
Committees asked for opinions Date announced in plenaryBUDG 12.2.2026ENVI 12.2.2026
Not delivering opinions Date of decisionBUDG 28.1.2026
Rapporteurs Date appointedTsvetelina Penkova 25.2.2026
Discussed in committee6.5.2026
Date adopted10.9.2026
Result of final vote+: –: 0:56 10 9
Date tabled11.9.2026
Final vote by roll call by the committee responsible 3 paragraphs

56 · For

EPP
Hildegard Bentele, Pilar del Castillo Vera, Raúl de la Hoz Quintano, Niels Flemming Hansen, Seán Kelly, Willemien Koning, Eszter Lakos, Angelika Niebler, Andrey Novakov, Virgil-Daniel Popescu, Jüri Ratas, Aura Salla, Paulius Saudargas, Oliver Schenk, Matej Tonin, Marion Walsmann, Andrea Wechsler, Iuliu Winkler, Angelika Winzig, Tomáš Zdechovský
Patriots
Jana Nagyová
Renew
João Cotrim De Figueiredo, Sigrid Friis, Bart Groothuis, Michał Kobosko, Ilhan Kyuchyuk, Morten Løkkegaard, Anna Stürgkh, Brigitte van den Berg, Yvan Verougstraete
S&D
Estelle Ceulemans, Christophe Clergeau, Annalisa Corrado, Niels Fuglsang, Lina Gálvez, Jens Geier, Bruno Gonçalves, Nicolás González Casares, Maria Grapini, Eero Heinäluoma, Thomas Pellerin-Carlin, Tsvetelina Penkova, René Repasi, Elena Sancho Murillo, Bruno Tobback, Nicola Zingaretti
The Left
Gaetano Pedulla', Jussi Saramo, Dario Tamburrano
Greens
Michael Bloss, Damian Boeselager, Markéta Gregorová, Ville Niinistö, Majdouline Sbai, Lena Schilling, Villy Søvndal

10 · Against

ECR
Elena Donazzan, Daniel Obajtek, Francesco Torselli, Mariateresa Vivaldini
ESN
Markus Buchheit
Patriots
Mélanie Disdier, András Gyürk, Pierre-Romain Thionnet, Auke Zijlstra
S&D
Evin Incir

9 · Abstained

ECR
Rihards Kols, Diego Solier, Claudiu-Richard Târziu, Kris Van Dijck
EPP
Krzysztof Hetman, Łukasz Kohut, Mirosława Nykiel
Patriots
Majbritt Birkholm
The Left