Skip to content
EU Parl Watch

Changes between two versions

What changed between the draft committee report and the plenary report

From · draft committee report· 22 Jun 2022

ITRE-PR-734108

on the proposal for a regulation of the European Parliament and of the Council on the internal markets for renewable and natural gases and for hydrogen (recast)

To · plenary report· 16 Feb 2023

A-9-2023-0032

on the proposal for a regulation of the European Parliament and of the Council on the internal markets for renewable and natural gases and for hydrogen (recast)

These two texts have too little in common to compare paragraph by paragraph: they are different documents rather than versions of one (for example one group’s motion and the joint text that was adopted).

+1,405 added · −189 removed · 6 changed paragraphs, packaging included.

Part 25 of 30: Paragraphs 1441–1500

Added:c. Responsible TSO:

Added:____________________________________

Added:Contact person: _____________________________

Added:Phone: +___________________________________

Added:d. Responsible market area manager (where relevant):

Added:__________________________________________

Added:Contact person: _____________________________

Added:Phone +___________________________________

Added:3. Primary offers – based on voluntary measures (‘market based’)

Added:a. Volume of gas (total):

Added:__________________________________________ kWh, of which

Added:high caloric gas: ____________________________ kWh,

Added:low caloric gas: _____________________________kWh.

Added:b. Period of supply:

Added:__________________________________________

Added:c. Maximum transport capacity:

Added:__________________________________________ kWh/h, of which

Added:firm capacity:___________________ kWh/h;

Added:interruptible capacity:___________________ kWh/h.

Added:d. Delivery points (interconnectors):

Added:Delivery point Firm transport capacity Interruptible transport capacity

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:e. Reference to capacity booking platform:

Added:_________________________________________

Added:f. Estimated compensation for the voluntary measure:

Added:gas price: EUR;

Added:other costs: EUR (please specify)

Added:g. Payment details:

Added:Recipient: ___________________________

Added:Bank details: ________________________

Added:4. Secondary offers – based on mandatory measures (‘non-market based’)

Added:a. Volume of gas (total):

Added:__________________________________________ kWh, of which

Added:high caloric gas: ____________________________ kWh,

Added:low caloric gas: _____________________________kWh.

Added:b. Period of supply:

Added:__________________________________________

Added:c. Maximum transport capacity:

Added:__________________________________________ kWh/h, of which

Added:firm capacity:___________________ kWh/h;

Added:interruptible capacity:___________________ kWh/h.

Added:d. Delivery points (interconnectors):

Added:Delivery point Firm transport capacity Interruptible transport capacity

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:________________ _________________ kWh/h _________________ kWh/h

Added:e. Reference to capacity booking platform:

Added:_________________________________________

Added:f. Likely costs of mandatory measures:

Added:estimated price of gas per kWh: _____________________ EUR;

Added:likely transportation costs: _____________________ EUR;

Added:estimated amount of compensation payments to sectors of the economy of the providing Member State affected by reductions in supply:

Added:_____________________________ EUR.

Added:g. Payment details: