Skip to content
EU Parl Watch

Changes between two versions

What changed between the plenary report and the adopted text

From · plenary report· 14 Apr 2023

A-9-2023-0147

on the proposal for a regulation of the European Parliament and of the Council Guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and Regulation (EU) No 913/2010 and repealing Regulation (EU) 1315/2013

To · adopted text· 24 Apr 2024

TA-9-2024-0317

Trans-European transport network

These two texts have too little in common to compare paragraph by paragraph: they are different documents rather than versions of one (for example one group’s motion and the joint text that was adopted).

+9 added · −1,254 removed · 1 changed paragraphs, packaging included.

Part 17 of 23: Paragraphs 961–1020

Removed:(Ex AM 1689( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 16/23 and part 17/23: Add the following to the core network: / - Port of Bahía de Cádiz

Removed:(Ex AM 1692( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 16/23 and part 17/23: Add the following to the comprehensive network: / - Granada – Motril (passenger and freight rail / Conventional / New Constr.)

Removed:(Ex AM 1694( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 16/23 and part 17/23: Add high speed for rail freight and passenger to the following to the core network: / Pamplona (ES)-Ezkio/Itxaso (ES)

Removed:(Ex AM 1695( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 16/23 and part 17/23: Add the following to the extended core network: / - Pau - Huesca (freight and passenger)

Removed:(Ex AM 1696( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 16/23 and part 17/23: Add high speed for rail freight and passenger to the following to the core network: / Bilbao (ES)-Santander (ES)

Removed:(Ex AM 458( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 17/23: Add the following to the core network: / - Santiago - Ourense (passenger rail/ ≥ 200 km/h)

Removed:(Ex AM 459( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 17/23: Add the following to the core network: / - Utrera- Granada- Almería (passenger and freight rail/ ≥ 200 km/h)

Removed:(Ex AM 1701( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 17/23: Add the following to the core network: / - Medina del Campo – Salamanca – Fuentes de Oñoro (passenger rail / ≥ 200 km/h) / - Madrid – Adanero – Tordesillas – Benavente – Ponferrada – Lugo – A Coruña (Road) / - Astorga – León – Carrión de los Condes – Burgos (Road) / - Port of Bahía de Cádiz / - Vigo - Porto (passenger rail/ ≥ 200 km/h)

Removed:(Ex AM 1703( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 17/23: Add the following to the extended core network: / - Sevilla – Huelva – Faro (passenger rail / ≥ 200 km/h / New Constr.) / - Córdoba - Jaén – Granada (Conventional) / - Madrid – Alcázar de San Juan – Jaén (Conventional) / - Bilbao – Santander (passenger and freight rail / ≥ 200 km/h / New Constr.)

Removed:(Ex AM 462( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 18/23: Add the following to the core network: / - Bussoleno - Avigliana ( ≥ 200 km/h) / - Orbassano - Torino S.Paolo ( ≥ 200 km/h)

Removed:(Ex AM 463( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 18/23: Add the following to the core network: / - Bologna – Ancona ( ≥ 200 km/h)

Removed:(Ex AM 464( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 18/23: Add the following to the extended core network: / - Ancona – Foggia ( ≥ 200 km/h)

Removed:(Ex AM 460( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 18/23 and part 19/23: Add the following to the extended core network: / - Zagreb (HR) - Maribor (SI) - Graz (AT) railfreight / passenger (conventional/new construction

Removed:(Ex AM 461( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – parts 18/23and 19/23: Add the following to the comprehensive network: / - Pula - Buzet (HR) - Divača (SI) - Trieste (IT) rail freight/passenger line Lupoglav – Buzet - state border (SI) - Prešnica (SI)

Removed:(Ex AM 465( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – parts 18/23 and 19/23: Add the following to the core network: / - Battipaglia - Praia a mare rail freight line and rail passenger line

Removed:(Ex AM 466( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 18/23 and part 19/23: Add the following to the core network: / - Bolzano and Rovereto rail freight bypasses (conventional).

Removed:(Ex AM 1852( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1268\1268304EN.docx)

Removed:Annex 1 – part 18/23 and part 19/23: Add the following to the comprehensive network: / - Caltanissetta - Marsala/Agrigento/Licata/Gela/Pozzallo rail freight line, rail passengers’ line (conventional)

Removed:(Ex AM 467( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 19/23: Add the following to the core network: / - Bussoleno - Avigliana ( ≥ 200 km/h) / - Orbassano - Torino S.Paolo ( ≥ 200 km/h)

Removed:(Ex AM 468( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 19/23: Add the following to the core network: / - Bologna – Ancona ( ≥ 200 km/h)

Removed:(Ex AM 469( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 19/23: Add the following to the extended core network: / - Ancona – Foggia ( ≥ 200 km/h)

Removed:(Ex AM 470( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 19/23: Include the following sections as high-speed (≥ 250 km/h) rail passengers lines: / - Milano – Treviglio (core network) / - Treviglio – Verona (core network)

Removed:(Ex AM 471( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 19/23: Add the following to the extended core network: / - Bari - Brindisi - Lecce passengers rail line (conventional) / - Bologna - Foggia passengers rail line (high speed) / - Pisa – Roma passengers rail line (conventional) / - Rosignano Marittimo - Civitavecchia motorway.

Removed:(Ex AM 1723( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 1 – part 19/23: Add the following to the comprehensive network: / Rijeka - Divača (SI) - Trieste (IT) road connection Kanfanar – Umag – State border - (SI) road connection

Removed:(Ex AM 472( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 21/23: Add the following to the core network: / - Craiova-Caracal-Alexandria-Bucureşti / Add Galati as Rail-Road Terminal

Removed:(Ex AM 473( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 1 – part 21/23: Add the following to comprehensive network / - Craiova - Pitesti

Removed:(Ex AM 482( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 2 – table – section AT: Rail road terminals: core (Villach -Fürnitz)

Removed:(Ex AM 474( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 2 – table – section DE: Deletion of the node.

Removed:(Ex AM 475( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 2 – table – section DE: Deletion of the node.

Removed:(Ex AM 476( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed:Annex 2 – table – section DE: Deletion of the node.

Removed:(Ex AM 1731( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Removed:Annex 2 - table - section DE: Maritime port: Core