Changes between two versions
What changed between the plenary report and the adopted text
From · plenary report· 17 Feb 2023
on the proposal for a directive of the European Parliament and of the Council on common rules for the internal markets in renewable and natural gases and in hydrogen (recast)
To · adopted text· 11 Apr 2024
Common rules for the internal markets for renewable gas, natural gas and hydrogen (recast)
These two texts have too little in common to compare paragraph by paragraph: they are different documents rather than versions of one (for example one group’s motion and the joint text that was adopted).
+10 added · −1,395 removed · 1 changed paragraphs, packaging included.
Part 11 of 27: Paragraphs 543–602
Removed:(d) the need to apply their laws and administrative procedures, in conformity with Union law, for the grant of authorisation for production or upstream development.
Removed:3. Member States shall ensure that they have in place dispute-settlement arrangements, including an authority independent of the parties with access to all relevant information, to enable disputes relating to access to upstream pipeline networks to be settled expeditiously, taking into account the criteria in paragraph 2 and the number of parties which may be involved in negotiating access to such networks.
Removed:4. In the event of cross-border disputes, the dispute-settlement arrangements for the Member State having jurisdiction over the upstream pipeline network which refuses access shall be applied. Where, in cross-border disputes, more than one Member State covers the network concerned, the Member States concerned shall consult each other with a view to ensuring that the provisions of this Directive are applied consistently. Where the upstream pipeline network originates from a third country and connects to at least one Member State, the Member States concerned shall consult each other and the Member State where the first entry point to the Member States' network is located shall consult the third country concerned where the upstream pipeline network originates, with a view to ensuring, as regards the network concerned, that this Directive is applied consistently in the territory of the Member States.
Removed:1. For the organisation of access to storage facilities and linepack when technically or economically necessary for providing efficient access to the system for the supply of customers, as well as for the organisation of access to ancillary services, Member States may choose either or both of the procedures referred to in paragraphs 3 and 4. Those procedures shall operate in accordance with objective, transparent and non-discriminatory criteria.
Removed:When choosing the procedure for access to storage under this Article, Member States shall take into account the results of the common and national risk assessments carried out under Article 7 of Regulation (EU) 2017/1938.
Removed:The regulatory authorities shall define and publish criteria according to which the access regime applicable to storage facilities and linepack may be determined. They shall make public, or oblige storage and transmission system operators to make public, which storage facilities, or which parts of those storage facilities, and which linepack is offered under the different procedures referred to in paragraphs 3 and 4.
Removed:2. Paragraph 1 shall not apply to ancillary services and temporary storage that are related to LNG facilities and are necessary for the re-gasification process and subsequent delivery to the transmission system.
Removed:3. In the case of negotiated access, the regulatory authorities shall take the necessary measures for undertakings and eligible customers either inside or outside the territory covered by the interconnected system to be able to negotiate access to storage facilities and linepack, when technically and/or economically necessary for providing efficient access to the system, as well as for the organisation of access to other ancillary services. The parties shall be obliged to negotiate access to storage, linepack and other ancillary services in good faith.
Removed:Contracts for access to storage, linepack and other ancillary services shall be negotiated with the relevant storage system operator. The regulatory authorities shall require storage system operators and natural gas undertakings to publish their main commercial conditions for the use of storage, linepack and other ancillary services on an annual basis.
Removed:When developing those conditions, storage operators shall consult system users.
Removed:4. In the case of regulated access, the regulatory authorities shall take the necessary measures to give natural gas undertakings and eligible customers either inside or outside the territory covered by the interconnected system a right to access to storage, linepack and other ancillary services, on the basis of published tariffs or other terms and obligations for use of that storage and linepack, when technically or economically necessary for providing efficient access to the system, as well as for the organisation of access to other ancillary services. The regulatory authorities shall consult system users when developing those tariffs or the methodologies for those tariffs. The right of access for eligible customers may be given by enabling them to enter into supply contracts with competing undertakings other than the owner or operator of the system or a related undertaking.
Removed:1. Member States shall take the necessary measures to enable:
Removed:(a) undertakings established within their territory to supply the eligible customers through a direct line; and
Removed:(b) any such customer within their territory to be supplied through a direct line by natural gas undertakings.
Removed:2. In circumstances where an authorisation for example, licence, permission, concession, consent or approval is required for the construction or operation of direct lines, the Member States or any competent authority they designate shall lay down the criteria for the grant of authorisations for the construction or operation of such lines in their territory. Those criteria shall be objective, transparent and non-discriminatory.
Removed:3. Member States may issue an authorisation to construct a direct line subject either to the refusal of system access on the basis of Article 34 or to the opening of a dispute-settlement procedure under Article 73.
Removed:Access to hydrogen infrastructure
Removed:1. Member States shall ensure the implementation of a system of regulated third party access to hydrogen networks based on published tariffs and applied objectively and without discrimination between any hydrogen network users. In the event that there is less capacity than potential users, network operators shall, in cooperation with both relevant regulatory authorities and potential users, give priority access to users who can demonstrate the highest potential of greenhouse gas abatement per tonne of consumed hydrogen and where no other, more energy and cost efficient, options are available. This paragraph shall not apply to cases in which access to the hydrogen network has already been granted.
Removed:2. Member States shall ensure that those tariffs, or the methodologies underlying their calculation, are approved prior to their entry into force in accordance with Article 72 by a regulatory authority referred to in Article 70 and that those tariffs — and the methodologies, where only methodologies are approved — are published prior to their entry into force.
Removed:3. Hydrogen network operators shall, where necessary for the purpose of carrying out their functions, including in relation to cross-border network transport of hydrogen, have access to the network of other hydrogen network operators.
Removed:4. Until 31 December 2030, a Member State may decide not to apply paragraph 1. In such case, the Member State shall ensure the implementation of a system of negotiated third party access to hydrogen networks in accordance with objective, transparent and non-discriminatory criteria. The regulatory authorities shall take the necessary measures for hydrogen network users to be able to negotiate access to hydrogen networks. The parties shall be obliged to negotiate access to hydrogen networks in good faith.
Removed:5. Where negotiated access is used, regulatory authorities shall provide guidance to hydrogen network users on how negotiated tariffs will be affected when regulated third party access is introduced.
Removed:1. Member States shall ensure the implementation of a system of third party access to hydrogen terminals based on negotiated access in an objective, transparent and non-discriminatory manner, whereby the regulatory authorities shall take the necessary measures for hydrogen terminal users to be able to negotiate access to such terminals. The parties shall be obliged to negotiate access in good faith.
Removed:2. Regulatory authorities shall monitor conditions for third party access to hydrogen terminals and their impact on hydrogen markets and, where necessary in order to safeguard competition, take measures to improve access in line with the criteria set out in paragraph 1.
Removed:Member States shall ensure the implementation of a system of regulated third party access to hydrogen storage, and line pack when technically and/or economically necessary for providing efficient access to the system for the supply of customers, as well as for the organisation of access to ancillary services, based on published tariffs and applied objectively and without discrimination between any hydrogen system users. Member States shall ensure that those tariffs, or the methodologies underlying their calculation, are approved prior to their entry into force in accordance with Article 72 by the regulatory authority.
Removed:Refusal of access, connection or disconnection
Removed:1. Natural gas and hydrogen undertakings may refuse access or connection to the natural gas or hydrogen system on the basis of lack of capacity or grade of purity. Duly substantiated reasons shall be given for any such a refusal.
Removed:2. Taking into account national and Union energy and climate objectives and existing requirements to reduce or switch from fossil gas consumption, Member States shall, without delay, take appropriate measures to ensure that the natural gas or hydrogen undertaking refusing access or connection to the natural gas system or hydrogen system on the basis of lack of capacity or a lack of connection makes the necessary enhancements as far as it is economic to do so or when a potential customer is willing to pay for them.
Removed:2a. Natural gas undertakings shall ensure the disconnection of final customers in accordance with Article 11a, taking into account existing requirements to reduce or switch from fossil gas consumption and the relevant local heating and cooling plans prepared pursuant to Article 52a.
Removed:3. Access to the system for renewable gas and low-carbon gas may only be refused subject to the provisions of Article 18 and 33 of [recast Gas Regulation as proposed in COM(2021) xxx].
Removed:Rules applicable to transmission, storage and LNG system operators of natural gas
Removed:1. Each transmission, storage or LNG system operator shall:
Removed:(a) operate, maintain, develop and decommission under economic conditions secure, reliable and efficient transmission, storage or LNG facilities to secure an open market, with due regard to the environment, Union and national energy and climate objectives, the obligations laid down in ▌ Regulation (EU) .../ …+, ensure adequate means to meet service obligations;
Removed:(b) not discriminate between system users or classes of system users, specifically in favour of its related undertakings;
Removed:(c) provide to any other transmission system operator, any other storage system operator, any other LNG system operator or any distribution system operator, sufficient information to ensure that the transport and storage of natural gas may take place in a manner compatible with the secure and efficient operation of the interconnected system;
Removed:(d) provide system users with the information they need for efficient access to the system.
Removed:2. Each transmission system operator shall build sufficient cross-border capacity to integrate European transmission infrastructure accommodating all economically reasonable and technically feasible demands for capacity and taking into account security of gas supply.
Removed:3. Transmission system operators shall cooperate with distribution system operators to ensure the effective participation of market participants connected to the grid in retail, wholesale and balancing market.
Removed:4. Transmission system operators shall ensure efficient gas quality management in their facilities in line with applicable gas quality standards in order to consider the quality requirements of different end-user applications.
Removed:5. Rules adopted by transmission system operators for balancing the gas transmission system shall be objective, transparent and non-discriminatory, including rules for the charging of system users of their networks for energy imbalance. Terms and conditions, including rules and tariffs, for the provision of such services by transmission system operators shall be established pursuant to a methodology compatible with Article 72(7) in a non-discriminatory and cost-reflective way and shall be published.
Removed:6. The regulatory authorities where Member States have so provided or Member States may require transmission system operators to comply with minimum standards for the maintenance and development of the transmission system, including interconnection capacity.
Removed:7. Member States may provide that one or several responsibilities listed in paragraph 1 are assigned to a transmission system operator other than the one which owns the transmission system to which the responsibilities concerned would otherwise be applicable. The transmission system operator to which the tasks are assigned shall be certified under the ownership unbundling, the independent system operator or the independent transmission system operator model and fulfil the requirements provided for in Article 54, but shall not be required to own the transmission system it is responsible for.
Removed:8. The transmission system operator shall fulfil the requirements provided for in Chapter IX and be certified in accordance with Article 57. This shall be without prejudice to the possibility for transmission system operators which are certified under the ownership unbundling, the independent system operator or the independent transmission system operator model to delegate, on their own initiative and under their supervision, certain tasks to other transmission system operators which are certified under the ownership unbundling, the independent system operator or the independent transmission system operator model, where the delegation of tasks does not endanger the effective and independent decision-making rights of the delegating transmission system operator.
Removed:9. LNG and storage system operators shall cooperate, within one Member State and regionally, to ensure the most efficient use of facilities capacities and synergies between these facilities, taking into account system integrity and operation and minimised methane leakage, inter alia, by prioritising co-located uses.
Removed:10. Transmission system operators shall procure the energy they use for the carrying out of their functions according to transparent, non-discriminatory and market based procedures.
Removed:Article 36 Confidentiality for transmission system operators and transmission system owners
Removed:1. Without prejudice to Article 68 or any other legal duty to disclose information, each transmission, storage or LNG system operator, and each transmission system owner, shall preserve the confidentiality of commercially sensitive information obtained in the course of carrying out its activities, and shall prevent information about its own activities which may be commercially advantageous from being disclosed in a discriminatory manner. If the transmission, storage or LNG system operator, or the transmission system owner is part of a vertically integrated undertaking, it shall not disclose, in particular, any commercially sensitive information to the remaining parts of the vertically integrated undertaking other than transmission system operators, distribution system operators or hydrogen network operators, unless this is necessary for carrying out a business transaction. In order to ensure the full respect of the rules on information unbundling, Member States shall ensure that, where the transmission system operator is unbundled in accordance with the rules on the independent system operator for natural gas set out in Section 2 of Chapter IX, the transmission system owner including, in the case of a combined operator, the distribution system operator, and the remaining part of the vertically integrated undertaking other than transmission system operators, distribution system operators or hydrogen network operators do not use joint services, such as joint legal services, apart from purely administrative or IT functions.
Removed:2. Transmission, storage or LNG system operators shall not, in the context of sales or purchases of natural gas by related undertakings, misuse commercially sensitive information obtained from third parties in the context of providing or negotiating access to the system.
Removed:3. Information necessary for effective competition and the efficient functioning of the market shall be made public. That obligation shall be without prejudice to protecting commercially sensitive information.
Removed:Article 37 Decision-making powers regarding the connection of new production facilities for renewable gas and low-carbon gas to the transmission system
Removed:1. The transmission system operator shall establish and publish transparent and efficient procedures for non-discriminatory connection of new production installations of renewable gas and low-carbon gas in line with the capacities identified in the ten-year network development plan referred to in Article 51. Those procedures shall be subject to approval by the regulatory authorities.
Removed:2. The transmission system operators shall not be entitled to refuse economically reasonable and technically feasible connection requests of a new or of an existing, but not yet connected production facility installation for renewable gas and low-carbon gas in line with the capacities identified in the ten-year network development plan referred to in Article 51. Production facilities installations for renewable gas shall have priority to connect over facilities for low carbon gas.
Removed:2a. For the purpose of the swift implementation of grid connection of renewable gas production, Member States shall ensure that:
Removed:(a) the transmission system operator complies with reasonable time limits to assess the requests for the injection of renewable gas, make an offer and implement the connection, under the monitoring of the regulatory authorities carried out in accordance with Article 72(1), point (t);
Removed:(b) permitting procedures for the implementation of the connection are not hampered by a lack of administrative capacity and do not create a hurdle to the achievement of the national renewable energy target.
Removed:Article 38 Decision-making powers regarding the connection to the transmission system and the hydrogen network
Removed:1. The transmission system operator and the hydrogen network operator shall establish and publish transparent and efficient procedures and tariffs for non-discriminatory connection of natural gas and hydrogen storage facilities, LNG regasification facilities, hydrogen terminals and industrial customers to the transmission system and the hydrogen network in line with the capacities identified in the ten-year network development plan referred to in Article 51. Those procedures shall be subject to approval by the regulatory authority.
Removed:2. The transmission system operator and the hydrogen network operator shall not be entitled to refuse the connection of a new natural gas or hydrogen storage facility, LNG regasification facility, hydrogen terminal or industrial customer on the grounds of possible future limitations to available network capacities or additional costs linked with necessary capacity increase. The transmission system operator and hydrogen network operator shall ensure sufficient entry and exit capacity for the new connection.
Removed:Distribution system operation of natural gas
Removed:Article 39 Designation of distribution system operators and hydrogen distribution network operator