Skip to content
EU Parl Watch

Changes between two versions

What changed between the plenary report and the adopted text

From · plenary report· 16 Feb 2023

A-9-2023-0032

on the proposal for a regulation of the European Parliament and of the Council on the internal markets for renewable and natural gases and for hydrogen (recast)

To · adopted text· 11 Apr 2024

TA-9-2024-0282

Internal markets for renewable gas, natural gas and hydrogen (recast)

These two texts have too little in common to compare paragraph by paragraph: they are different documents rather than versions of one (for example one group’s motion and the joint text that was adopted).

+8 added · −1,419 removed · 2 changed paragraphs, packaging included.

Part 9 of 27: Paragraphs 481–540

Removed:(a) the distribution system operator complies with reasonable time limits to assess the requests for injection of renewable gas, make an offer and implement the connection, with monitoring of the regulatory authority in accordance with Article 41 and Article 72(1), point (t) of [the recast Gas Directive as proposed in COM(2021)xxx];

Removed:(b) permitting procedures for the implementation of the connection are not hampered by a lack of administrative capacity and do not create a hurdle to the achievement of the national renewable energy target.

Removed:Article 34 Cooperation between distribution system operators, transmission system operators and hydrogen network operators

Removed:Distribution system operators shall cooperate with other distribution system operators, transmission system operators and hydrogen network operators to coordinate maintenance, system development, new connections, decommissioning and the operation of the system to ensure system integrity and with a view to maximise capacity and minimise the use of fuel gas.

Removed:Where distribution system operators are responsible for gas quality management in their networks, they shall make public detailed information regarding the quality of the gas transported in their networks, which might affect network users, based on Articles 16 and 17 of Commission Regulation (EU) 2015/703.

Removed:The development of a distribution system shall be based on a transparent network development plan that the distribution system operator shall publish at least every two years and shall submit to the regulatory authority. The network development plan shall provide transparency on the medium- and long-term gas services needed.

Removed:The distribution system operator shall consult consumers, local authorities, relevant transmission system operators and other stakeholders, including trade unions, on the network development plan referred to in the second subparagraph. The distribution system operator shall publish the results of the consultation process along with the network development plan, and submit the results of the consultation and the network development plan to the regulatory authority. The regulatory authority may request amendments to the plan.

Removed:Member States may decide not to apply the obligation set out in the second subparagraph to distribution system operators which serve less than 100 000 connected customers.

Removed:Distribution system operators operating a natural gas system or hydrogen network shall cooperate at Union level through the European entity for distribution system operators (‘EU DSO entity’) set up in accordance with Articles 52 to 57 of Regulation (EU) 2019/943 of the European Parliament and of the Council, in order to promote the completion and functioning of the internal market for natural gas, cooperate in the development of the hydrogen market and to promote optimal management and a coordinated operation of distribution and transmission systems.

Removed:Registered members may participate in the EU DSO entity directly or be represented by a national association designated by a Member State or by a Union-level association.

Removed:The costs related to the activities of the EU DSO entity shall be borne by the distribution system operators that are registered members and shall be taken into account in the calculation of tariffs. Regulatory authorities shall only approve costs that are reasonable and proportionate and provide reasons where they are not approved.

Removed:1. The rules and procedures on the participation of distribution system operators in the EU DSO entity pursuant to Article 54 of Regulation (EU) 2019/942 shall also apply to distribution system operators operating a natural gas system or hydrogen network.

Removed:1a. The governance rules and structures of the EU DSO entity shall guarantee a fair and balanced representation for gas and hydrogen distribution system operators.

Removed:2. The Strategic Advisory Group pursuant to Article 54(2), point (f), of Regulation (EU) 2019/942 shall also consist of representatives of associations representing European distribution system operators solely operating a natural gas system or hydrogen network.

Removed:3. By ... [one year after the date of entry into force of this Regulation] the EU DSO entity shall submit to the Commission and to ACER draft updated statutes, including a code of conduct, a list of registered members, draft updated rules of procedure, including rules of procedures on the consultation with the ENTSO for Electricity, the ENTSOG&H and other stakeholders, and draft updated financing rules.

Removed:The draft updated rules of procedure of the EU DSO entity shall ensure balanced representation of all participating distribution system operators, including those solely owning or operating natural gas systems or hydrogen network.

Removed:4. Within four months of receipt of the documents pursuant to paragraph 3, ACER shall provide the Commission with its opinion, after consulting organisations representing all stakeholders, in particular distribution system users, including customers.

Removed:5. Within three months of receipt of ACER's opinion, the Commission shall deliver an opinion on documents provided pursuant to paragraph 3, taking into account ACER's opinion as provided for in paragraph 4.

Removed:6. Within three months of receipt of the Commission's positive opinion, the distribution system operators shall adopt and publish its updated statutes, rules of procedure and financing rules.

Removed:7. The documents referred to in paragraph 3 shall be submitted to the Commission and to ACER where there are changes thereto or upon the reasoned request of either of them. The Commission and ACER may deliver an opinion in accordance with the process set out in paragraphs 3, 4 and 5.

Removed:1. The EU DSO entity shall exercise the tasks listed in Article 55(1) points (a) to (e) of Regulation (EU) 2019/943 and undertake the activities listed in Article 55(2) points (c) to (e) of that Regulation also as regards those distribution networks which are part of the natural gas system or hydrogen network.

Removed:2. In addition to the tasks listed in Article 55(1) of Regulation (EU) 2019/943 the EU DSO entity shall participate in the development of network codes which are relevant to the operation and planning of distribution grids and the coordinated operation of the transmission networks and distribution networks pursuant to this Regulation and contribute to mitigating fugitive methane emissions from the natural gas system.

Removed:When participating in the development of new network codes pursuant to Article 53, the EU DSO entity shall comply with the consultation requirements as laid down in Article 56 of Regulation (EU) 2019/943.

Removed:3. In addition to the activities listed in Article 55(2) of Regulation (EU) 2019/943 the EU DSO entity shall:

Removed:(a) cooperate with the ENTSOG&H on the monitoring of the implementation of the network codes and guidelines adopted pursuant to this Regulation which are relevant to the operation and planning of distribution grids and the coordinated operation of the transmission networks and distribution networks;

Removed:(b) cooperate with the ENTSOG&H and adopt best practices on the coordinated operation and planning of transmission and distribution systems including issues such as exchange of data between operators and coordination of distributed energy resources;

Removed:(c) work on identifying best practices for the implementation of the results of the assessments pursuant to Article 23(1a) [proposal for REDIII] and Article 23 [proposal for revised EED] and for the cooperation between operators of electricity distribution systems, of natural gas distribution systems, of hydrogen distribution networks and of district heating and cooling systems including for the purpose of the assessment pursuant to Article 24(8) [proposal for REDIII], including recommendations for the suitable placement of electrolysers with a view to ensure the use of waste heat in district heating network.

Removed:4. The EU DSO entity shall provide input to the ENTSOG&H for its reporting on gas and hydrogen quality, with regard to the distribution networks where distribution system operators are responsible for gas quality management, as referred to in Article 23(3).

Removed:RULES APPLICABLE TO THE DEDICATED HYDROGEN NETWORKS

Removed:1. Hydrogen network operators shall cooperate to avoid restrictions to cross-border flows of hydrogen due to hydrogen quality differences in order to meet the quality requirements of different end-use applications in line with the applicable hydrogen quality standards.

Removed:2. Where a restriction to cross-border flows due to differences in hydrogen quality cannot be avoided by the concerned hydrogen network operators in their standard operations, they shall inform the concerned regulatory authorities without delay. The information shall include a description and justified reasoning for any steps already taken by the hydrogen network operators.

Removed:3. The concerned regulatory authorities shall jointly agree within six months whether to recognise the restriction.

Removed:4. Where the concerned regulatory authorities recognise the restriction, they shall request the concerned hydrogen network operators to perform, within 12 months, the following actions in sequence:

Removed:(a) cooperate and develop technically feasible options in order to remove the recognised restriction;

Removed:(b) jointly carry out a cost-benefit analysis on the technically feasible options to define economically efficient solutions which shall specify the breakdown of costs and benefits among the categories of affected parties;

Removed:(c) produce an estimate of the implementation time for each potential option;

Removed:(d) conduct a public consultation on identified feasible solutions and take into consideration the results of the consultation;

Removed:(e) submit a joint proposal for a solution based on the cost benefit analysis and results of the public consultation removing the recognised restriction, including the timeframe for implementation, to their respective regulatory authorities for approval and to the other competent national authorities of each involved Member State for information.

Removed:5. Where the concerned hydrogen network operators do not reach an agreement on a solution within 12 months, each hydrogen system operator shall inform its regulatory authority without delay.

Removed:6. The ▌regulatory authorities concerned shall take a joint coordinated decision to remove or maintain the recognised restriction, taking into account the cost-benefit analysis prepared by the concerned transmission system operators and the results of the public consultation within six months as set out in Article 6(10) of Regulation (EU) 2019/942. Any decision to maintain the recognised restriction shall be reviewed every four years.

Removed:7. The joint coordinated decision of the concerned regulatory authorities shall include a decision on the allocation of the investment costs to be borne by each hydrogen network operator for implementing the agreed solution, as well as their inclusion in tariffs after 1 January 2031, taking into account the economic, social and environmental costs and benefits of the solution in the concerned Member States.

Removed:8. ACER may make recommendations to the regulatory authorities on the details of such cost allocation decisions as referred to in paragraph 7.

Removed:9. Where the concerned regulatory authorities cannot reach an agreement as referred to in paragraph 3 of this Article, ACER shall decide on the restriction, following the process set out in Article 6(10) of Regulation (EU) 2019/942. Where ACER recognises the restriction it shall request the concerned hydrogen network operators to perform, within 12 months, the actions referred to in paragraph 4, points (a) to (e), in sequence.

Removed:10. Where the ▌regulatory authorities concerned cannot take a joint coordinated decisions as referred to in paragraphs 6 and 7 of this Article, ACER shall decide on the solution to remove or maintain the recognised restriction and on the allocation of the investment costs to be borne by each system operator for implementing the agreed solution, following the process set out in Article 6(10) of Regulation (EU) 2019/942. Any decision to maintain the recognised restriction shall be reviewed every four years.

Removed:11. Further details required to implement this Article, including details on a common binding hydrogen quality specification for cross-border hydrogen interconnectors, cost benefit analyses for removing cross-border flow restrictions due to hydrogen quality differences, interoperability rules for cross-border hydrogen infrastructure, including addressing interconnection agreements, units, data exchange, communication and information provision among relevant market participants, shall be set in a network code established in accordance with Article 54(2), point (b).

Removed:▌

Removed:1. The hydrogen network operators shall make public detailed information regarding the services they offer and the relevant conditions applied, together with the technical information necessary for hydrogen network users to gain effective network access.

Removed:2. In order to ensure transparent, objective and non-discriminatory tariffs and facilitate efficient utilisation of the hydrogen network, from 1 January 2031 hydrogen network operators or relevant authorities shall publish complete information on tariff derivation, methodology and structure.

Removed:3. The hydrogen network operators shall make public detailed information regarding the quality of hydrogen transported in their networks, which might affect network users.

Removed:4. The relevant points of a hydrogen network on which the information is to be made public shall be approved by the competent authorities after consultation with hydrogen network users.

Removed:5. The hydrogen network operators shall always disclose the information required by this Regulation in a meaningful, quantifiably clear and easily accessible manner and on a non-discriminatory basis.

Removed:6. The hydrogen network operators shall make public ex-ante and ex-post supply and demand information, including a periodic forecast and the recorded information. The regulatory authority shall ensure that all such information is made public. The level of detail of the information that is made public shall reflect the information available to the hydrogen network operators.

Removed:7. The market participants concerned shall provide the hydrogen network operator with the data referred to in this Article.

Removed:8. Further details required to implement the transparency requirements for hydrogen network operators, including further details on the content, frequency and form of information provision by hydrogen network operators, shall be set in a network code established in accordance with Article 54(1) of this Regulation.

Removed:Hydrogen network operators, hydrogen storage operators and hydrogen terminal operators shall keep at the disposal of the national authorities, including the regulatory authority, the national competition authority and the Commission, all information referred to in Articles 31 and 48 and in Part 4 of Annex I for a period of five years.

Removed:1. Harmonised standards or parts thereof the references of which have been published in the Official Journal of the European Union shall be presumed to be in conformity with the requirements referred to in delegated acts issued under Article 54(2), point (b) of this Regulation or implementing acts issued in accordance with Article 51.

Removed:2. The Commission shall inform the European standardisation body concerned and, if necessary, issue a new mandate with a view to revising the harmonised standards concerned.

Removed:The Commission is empowered to adopt implementing acts laying down common specifications for the requirements set out in Article 46 of [the recast Gas Directive as proposed in COM(2021) xxx] or may set those specifications in a network code pursuant to Article 54 (2), point (b), of this Regulation, where:

Removed:(a) those requirements are not covered by harmonised standards or parts thereof, the references of which have been published in the Official Journal of the European Union; or

Removed:(b) the Commission observes undue delays in the adoption of requested harmonised standards, or considers that relevant harmonised standards are not sufficient; or